Measured impedance
ZC,F with 5 angle error
R R
For a metallic fault on a transmission line (L=85), For a metallic fault on a cable (C=45), the resulting
even this high angle error will only lead to a small measuring error for the reactance is higher.
measuring error for the reactance
Example: ∆meas = 1 → ∆X/X = 0,14% Example: ∆meas = 1 → ∆X/X = 1,7%
X ∆X/X = 14%
RF
ZC,F ZF
7 1
Measured impedance R
with 1 angle error
X X
∆X/X = 6%
ZF ZF
R R
Limit the Rzone1/Xzone1 ratio to 3: Tilting the upper limit of the zone can give additional
Example: cable feeder; Rzone1/Xzone1 = 3 security against wrong trips
∆meas = 1 → ∆X/X = 6%
ZS ZL,F I
A
x
cable 240mm2, 1km
110kV/20kV
uk=12%
r‘ = 0.125/km
x‘ = 0.128 /km
Umeas
ZS
A high source impedance ratio (SIR) leads SIR = = 18,8
ZL
to a low measuring voltage at the zone limit:
100𝑉 𝑍𝐿,80% 100𝑉 0.1024Ω
Umeas = ∙ = ∙ = 2.4V
3 𝑍𝐿,80% +𝑍𝑆 3 0.1024Ω+2.4Ω
Calculation shown for 3 phase
Recommendation: The measured voltage at the zone faults and secondary values
limit should not be less than 1V (SIR < 60)
L1
L2 Fault inception:
L3 Transient currents after fault inception
Petersen Ires
may lead to a pickup of the distance
coil protection: This is normally supressed
by a time delays
Double earth fault situation leads Double earth fault situation only leads
to a phase-phase-earth pick up to a single phase-to-earth pickup
It is sufficient to trip only one earth fault! In this case, a trip on a persistent single
• Operation can be continued with one earth fault phase-to-ground pickup is required
• The remaining earth fault must be detected Time delay for single phase-to-ground pickup
by the sensitive earth fault function should be cancelled.
Problem: Which earth fault should be tripped?
→ Phase preference
setting required
x x
Overhead line Cable
6km 2km
Topic 1: setting of distance zone 1 Topic 2: blocking of auto reclosing for cable faults
• Total impedance from the relay Options:
to the end of zone 1 must be calculated • Blocking by the fault locator
• Residual compensation factors must be calculated • Use of a differential protection across the cable
for the same point (without circuit breaker at the connection point
to the overhead line; CT required at this point)
x x
Overhead line Cable
6km 2km
Subscribe
© Siemens 2025
Subject to changes and errors. The information given in this
document/video only contains general descriptions and/or performance
features which may not always specifically reflect those described,
or which may undergo modification in the course of further development
of the products. The requested performance features are binding only
when they are expressly agreed upon in the concluded contract.
All product designations may be trademarks or other rights of Siemens,
its affiliated companies or other companies whose use by third parties
for their own purposes could violate the rights of the respective owner.