Numerical Relay Test Report - NEW

The test report for numerical relays includes detailed metering checks for voltage and current, confirming proper operation of the relay settings for under voltage, over voltage, and over current protections. All protection functions were tested and found to be operating correctly, with specific values recorded for each phase. The report was completed by Mr. Narayan Mogaveera and witnessed by another party.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views3 pages

Numerical Relay Test Report - NEW

The test report for numerical relays includes detailed metering checks for voltage and current, confirming proper operation of the relay settings for under voltage, over voltage, and over current protections. All protection functions were tested and found to be operating correctly, with specific values recorded for each phase. The report was completed by Mr. Narayan Mogaveera and witnessed by another party.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

TEST REPORT FOR NUMERICAL RELAYS

Feeder Name : Feeder:

Make: ABB Sr No.:

CT / PT DETAILS:

VT RATIO 3300/110V
CT RATIO – 300/1A

METERING CHECKS :
INJECTED VALUES
REFERENCE (Secondary Values) MEASURED VALUES(In terms of Primary Values)
R Y B

VAB:3.3KV VBC :3.3KV VCA: 3.3 KV


P-P
PT (VOLTS) 30˚ -90˚ 150˚
63.5V 63.5V 63.5V
From
0˚ -120˚ 120˚
MEASUREMENT-1 VAN: 1.90 KV VBN: 1.90 KV VCN: 1.90 KV
P-N
0˚ -120˚ 120˚

CT-1
(AMPS )
1A 1A 1A IB-1: 301 A IC-1: 300 A
(SIDE-A) P-N IA-1: 300 A 0˚
0˚ -120˚ 120˚ -120˚ 120˚
From
MEASUREMENT-1

UNDER VOLTAGE PROTECTION (27): PHPTUUV1

Setting:
V< Measure’s Mode Phase-Phase
V< Operate Mode Any Phase
V< Function DT
V < 1 Voltage Set 77.0 V
V< 1 Time delay 1.6 Sec

PHPTUUV1
PICKUP OPEARTING
Phase
Voltage(V) TIME ( Sec )
R-N 76.9

Y-N 76.8

B-N 76.8

Test Performed by: Witnessed By:


Name : Mr. Narayan Mogaveera Name:
Signature Signature
OVER VOLTAGE PROTECTION (59): PHPTOV1

PHPTOV1

V>Measure’s Mode Phase-Phase


V>Operate Mode Any Phase
V> Function DT
V > 1 Voltage Set 121V
V> 1 Time delay 40 mSec

PICKUP OPEARTING
Phase
Voltage(V) TIME ( Sec )
R-N 121

Y-N 121

B-N 121

OVER CURRENT PROTECTION:

Non-Directional over current Fault: IEC Normal Inverse IDMT Curve PHLPTOC

Phase Injected Trip Time with TMS=0.18 & Current Injected = 2 x ISET
Current Set Value
Cal Time Actual operated Time Flag/LED
R 1.0 1.805 OK
Y 1.0 1.805 OK
B 1.0 1.805 OK

Non-Directional over Current: IEC Normal Inverse IDMT Curve PHLPTOC

Phase Injected Trip Time with TMS=0.18 & Current Injected = 5 x ISET
Current Set Value
Cal Time Actual operated Time Flag/LED
R 1.0 0.77 OK
Y 1.0 0.77 OK
B 1.0 0.77 OK

Non-Directional over Current: IEC Normal Inverse IDMT Curve PHLPTOC


Phase Injected Trip Time with TMS=0.18 & Current Injected = 10 x ISET
Current Set
Value Cal Time Actual operated Time Flag/LED
R 1.0 0.534 OK
Y 1.0 0.534 OK
B 1.0 0.534 OK

EARTH OVER CURRENT PROTECTION:


Test Performed by: Witnessed By:
Name : Mr. Narayan Mogaveera Name:
Signature Signature
Setting:

1. EARTH FAULT UNIT CHECK : EFIPTOC (50N) OPERATING TIME CHECK: EFIPTOC (50N)

RELAY SET AT VALUE RELAY PICK UP VALUE RELAY SET AT VALUE IN m RELAY PICK UP VALUEIN m
IN AMP SEC. SEC

EARTH FAULT UNIT CHECK : EFIPTOC (50N) OPERATING TIME CHECK: EFIPTOC (51N)

RELAY SET AT VALUE RELAY PICK UP VALUE RELAY SET AT VALUE IN m RELAY PICK UP VALUEIN m
IN AMP SEC. SEC

Measurement Check:

Current Injected in Relay AMP Measured In Relay Amps


R/Y/B/N R Y B N
1.0 A A A A

Voltage Injected in Relay Volts Measured In Relay Volts


R/Y/B R Y B
63.5V KV kV kV

FUNCTION STATUS OF CHECKING RESULT


MEASUREMENT CHECKS  Yes  N/A FOUND OK
PROTECTION FUNCTION CHECKS  Yes  N/A FOUND OK
DC LOGIC  Yes  N/A FOUND OK
OUTPUT RELAY CHECKS  Yes  N/A FOUND OK
BREAKER TRIPPING CHECKS  Yes  N/A FOUND OK
OPTO INPUT CHECKS  Yes  N/A FOUND OK
LED CHECK  Yes  N/A FOUND OK
COMMUNICATION FRONT  Yes  N/A FOUND OK

Test Performed by: Witnessed By:


Name : Mr. Narayan Mogaveera Name:
Signature Signature