0% found this document useful (0 votes)
13 views2 pages

Sms 2

The document provides a detailed breakdown of costs for various solar energy components and installation materials, totaling 964,100. Additional labor costs amount to 60,000, leading to a grand total of 1,024,100. Items listed include inverters, batteries, solar panels, cables, protective devices, and installation materials.

Uploaded by

br.salau
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views2 pages

Sms 2

The document provides a detailed breakdown of costs for various solar energy components and installation materials, totaling 964,100. Additional labor costs amount to 60,000, leading to a grand total of 1,024,100. Items listed include inverters, batteries, solar panels, cables, protective devices, and installation materials.

Uploaded by

br.salau
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Descripti Quanti Unit Total

on ty price

2kva sms 1pcs 280,000 280,000


hybrid
inverter

12v 1pcs 260,000 260,000


220ah
tubular
batterry

400W 3 Nor 95,000 285,000


Solar
panel

6mm DC 28mtrs 1100 30,800


cable

AC cable 10mtrs 100 10,000


4mm

50,000 50,000
Protective
device

compartm 1 Nors 15,000 15,000


ent boxes

Aluminiu 1 10,500 10,500


m profile length

Bot and 8 pcs 350 2,800


nut

Installatio Lot 10,000 10,000


n
materials

TOTAL 964,100
Labour 60,000

Grand 1,024,1
Total 00