PROGRESS REPORT
NO. 14
PERIOD ENDING : 27 DISEMBER 2024
_____________________________________ _____________________________________
_____________________________________
BANDAR NUSAJAYA DEVELOPMENT SDN BHD
Senior Executive/Site Inspector
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD
222113 (ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU,
JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
TABLE OF CONTENT
2
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113
(ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
CONTRACT TITLE : PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD
222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM
PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR
NUSAJAYA DEVELOPMENT SDN BHD
CONTRACT NO : UEMS/BNDSB/009(23)
DEFECT LIABILITY PERIOD (D.L.P) : TWELVE (12) MONTHS + THREE (3) MONTHS + FORTEEN (14) DAYS FROM CPC.
LIQUIDATED AND ASCERTAINED : Section 1 (1C1,1C2, DETENTION POND) : RM 1400.00 per calendar day
DAMAGES (L.A.D) Section 2 (OVERALL REMAINING WORKS) : 2,400.00 Months
3
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113
(ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
4
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT
SDN BHD
(CONTRACT NO: UEMS/BNDSB/009(23))
EXECUTIVE DIRECTOR
Nasrullah Bin Muda
[email protected]
HP: 019-2280403
HEAD OF OPERATION
Ho Kah Heng
[email protected]
012-6162055
CONTRACT MANAGER
Khairul Fauzi bin Zulkafli
[email protected]
HP: 019-2347595
CONTRACT EXECUTIVE
Norliyana Syahirah
[email protected]
HP: 016-4858997
Head Quarters
Site
[email protected]
hp: 019-7226662
SITE SAFETY SUPERVISOR ENVIRONMENTAL OFFICER SITE AGENT QAQC ENGINEER SURVEYOR
Khairul Hazmie Bin Khairuddin Mohamad Khairul Aiman Chong Thim Wan Tuan Nur Syahira Mohd Aminizan Bin Ramli
[email protected] [email protected] [email protected] [email protected] [email protected]
HP: +60 11-3345 6372 HP: 013-9130446 HP: 012-2785121 HP: 014-9584392 HP: 019-7455828
………………………………………………………………. ……………………………………………………………….
En Abdul Rahman bin Kasim En Muhammad Azizan bin Jafar
Senior Project Manager Superintanding Officer
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD
222113 (ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR
BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
6
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443,
PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR
PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
7
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI
PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR
NUSAJAYA DEVELOPMENT SDN BHD
Report No. : 14
Period Ending : 27/12/2024
Overall Days Ahead / Delay -14 Overall Days Ahead / Delay -15
SECTION 1 SECTION 2
Date 27/12/2024 Date 27/12/2024
Overall Schedule Progress 100.00% Overall Schedule Progress 78.06%
Overall Actual Progress 99.88% Overall Actual Progress 65.45%
Overall % Ahead / Delay -0.12% Overall % Ahead / Delay -12.61%
Overall Days Ahead / Delay 0 Overall Days Ahead / Delay -34
8
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI
PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR
NUSAJAYA DEVELOPMENT SDN BHD
8
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113
(ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
9
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443,
PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR
PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
10
ID Task Task Name Duration Start Finish Scheduled Actual Percentage
Mode Percentage 27/12/2024Qtr 2, 2024 Qtr 3, 2024 Qtr 4, 2024 Qtr 1, 2025 Qtr 2, 2025
27/12/2024 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
1 SITE CLEARANCE, EARTHWORKS, DETENTION POND 273 days Mon 10/6/24 Sun 9/3/25 86.88 79.31
AND OTHER INFRA WORKS ESTUARI PARKHOMES
2 PRELIMINARIES 82 days Mon 10/6/24 Fri 30/8/24 100 100
3 SITE SURVEY AND PEGGING WORKS 22 days Mon 10/6/24 Mon 1/7/24 100 100
4 PREPARATION OF DOCUMENTATION AND 22 days Mon 10/6/24 Mon 1/7/24 100 100
MACHINES MOBILIZATION
5 INSTALLATION OF SITE HOARDING AND GATES 60 days Tue 2/7/24 Fri 30/8/24 100 100
(2000m)
6 RECTIFY OF EXISTING WASH THROUGH 14 days Sat 6/7/24 Fri 19/7/24 100 100
7 INSTALLATION OF PROJECT SIGNBOARD 14 days Sat 20/7/24 Fri 9/8/24 100 100
8 Section 1 (Parcel 2C1, 2C2 and Detention Pond) 163 days Fri 28/6/24 Sat 7/12/24 100 99.88
9 CLEARING WORKS 35 days Fri 28/6/24 Thu 1/8/24 100 100
10 EARTHWORKS 111 days Fri 2/8/24 Wed 20/11/24 100 100
11 INSTALLATION OF SEDIMENT FENCING 90 days Fri 26/7/24 Wed 23/10/24 100 100
12 TEMPORARY EARTHDRAIN 114 days Fri 9/8/24 Sat 30/11/24 100 100
13 GABION WALL WORKS (160m) 70 days Thu 22/8/24 Wed 30/10/24 100 100
14 TESTING WORKS 80 days Sat 31/8/24 Mon 18/11/24 100 100
15 ASBUILT PREPARATION AND SUBMISSION 6 days Mon 2/12/24 Sat 7/12/24 100 90
16 Section 2 (Overall) 273 days Mon 10/6/24 Sun 9/3/25 78.06 65.45
17 CLEARING WORKS 40 days Fri 26/7/24 Tue 3/9/24 100 93
18 EARTHWORKS 200 days Wed 14/8/24 Sat 1/3/25 68 48
19 INSTALLATION OF SEDIMENT FENCING 165 days Wed 7/8/24 Sat 18/1/25 86.67 70
20 TEMPORARY EARTHDRAIN 165 days Wed 21/8/24 Sat 1/2/25 78.18 60
21 RETAINING WALL WORKS 183 days Mon 10/6/24 Mon 9/12/24 100 98.76
22 PILING WORKS (328nos) 70 days Mon 10/6/24 Sun 18/8/24 100 100
23 STRUCTURE WORKS 113 days Mon 19/8/24 Mon 9/12/24 100 98
24 DETENTION POND WORKS 205 days Mon 10/6/24 Tue 31/12/24 100 63.79
25 PILING WORKS (38nos) 7 days Mon 18/11/24 Sun 24/11/24 100 100
26 STRUCTURE WORKS 205 days Mon 10/6/24 Tue 31/12/24 100 58.82
27 DRYING POND WORKS 205 days Mon 10/6/24 Tue 31/12/24 100 58.82
28 HACKING WORKS 14 days Mon 10/6/24 Sun 23/6/24 100 100
29 NEW WING WALL INLET WORKS (2NOS) 30 days Mon 25/11/24 Tue 24/12/24 100 30
30 INSTALLATION OF GABION CAGE AT 7 days Wed 25/12/24 Tue 31/12/24 100 100
OUTLET
31 TURFING WORKS 50 days Sat 11/1/25 Sat 1/3/25 30 30
32 TESTING WORKS 80 days Fri 22/11/24 Sun 9/2/25 45 50
33 ASBUILT PREPARATION AND SUBMISSION 7 days Mon 3/3/25 Sun 9/3/25 0 0
Task Inactive Task Manual Summary Rollup External Milestone Manual Progress
Page 1
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443,
PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR
PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
11
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR
BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
S-CURVE PHYSICAL
99.89% 100.00%
100.00%
98.11%
95.05%
91.49%
81.27%
80.00%
75.79%
69.61%
70.00%
59.63%
60.00%
54.26%
Scheduled Actual
50.00%
44.91%
40.00%
35.56%
30.00% 26.21%
20.00% 17.31%
10.91%
10.00% 6.73%
4.28%
2.78%
1.34%
0.00%
0.00%
10/6/2024 21/6/2024 2/7/2024 12/7/2024 26/7/2024 9/8/2024 23/8/2024 6/9/2024 20/9/2024 4/10/2024 18/10/2024 1/11/2024 15/11/2024 29/11/2024
Scheduled 0.00% 1.34% 2.78% 4.28% 6.73% 10.91% 17.31% 26.21% 35.56% 44.91% 54.26% 59.31% 69.39% 75.79%
Actual 0.00% 1.00% 2.00% 5.00% 7.49% 11.11% 17.54% 27.13% 35.96% 45.18% 53.95% 60.31% 65.96% 68.63%
120.00%
100.00%
S-CURVE FINANCIAL
99.00%
97.00%
100.00%
93.00%
91.00%
85.00%
78.00%
80.00%
72.00%
66.00%
58.00%
60.00%
45.00%
Scheduled
Actual
36.00%
40.00% 40.25%
28.00%
33.80%
21.00%
15.00%
20.00% 20.75%
7.00%
9.12%
4.00%
5.05%
17/6/2024
24/6/2024
15/7/2024
22/7/2024
29/7/2024
12/8/2024
19/8/2024
26/8/2024
16/9/2024
23/9/2024
30/9/2024
7/10/2024
1/7/2024
8/7/2024
5/8/2024
2/9/2024
9/9/2024
14/10/2024
21/10/2024
28/10/2024
4/11/2024
11/11/2024
18/11/2024
25/11/2024
2/12/2024
9/12/2024
16/12/2024
23/12/2024
30/12/2024
13/1/2025
20/1/2025
27/1/2025
10/2/2025
17/2/2025
24/2/2025
10/3/2025
17/3/2025
6/1/2025
3/2/2025
3/3/2025
10/6/2024 21/6/2024 2/7/2024 12/7/2024 26/7/2024 9/8/2024 23/8/2024 6/9/2024 20/9/2024 4/10/2024 18/10/2024 1/11/2024 15/11/2024 29/11/2024
Schedule 0.00% 1.00% 3.00% 4.00% 5.00% 7.00% 11.00% 15.00% 21.00% 28.00% 36.00% 45.00% 58.00% 66.00%
Percentage 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 5.05% 5.05% 9.12% 9.12% 9.12% 9.12% 9.12% 20.75%
Certified
3.0 MANPOWER
PLANT & MACHINERY
WEATHER RECORD
12
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM
PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
14
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM
PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
16
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI PARKHOMES),
ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
17
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443,
PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR
PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
18
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI PARKHOMES),
ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT
SDN BHD
4 3472/PCL.2/CN/IN/EW/300 4/6/2024
SECTION A-A AND SECTION E-E
19
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443,
PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR
PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
20
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI
PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA
DEVELOPMENT SDN BHD
Date Status
No. Item Revision 01 Revision 02 Remarks
Submitted (Approved)
1 Method Of Statement for Site Clearance 21/6/2024 Approved -
21
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR PUTERI,
MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
EKSB/JOH/2024/18/BNDSB
4 10/7/2024 RC Pipe (ø 1500mm) OKA Concrete Industries Approved 12/7/2024 No objection.
/EPH/016
EKSB/JOH/2024/18/BNDSB
5 24/7/2024 BRC (A7 & A8) Engtex Metal Sdn Bhd Approved 26/7/2024 No objection.
/EPH/021
22
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD
222113 (ESTUARI PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU,
JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
Geolab(m) sdn
1 Concrete Test Geolab(m) sdn bhd 4/11/2024 Cube Test Done
bhd
23
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443,
PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR
PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
24
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI
PARKHOMES), ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR
NUSAJAYA DEVELOPMENT SDN BHD
Instruction Date
No. Type Reference Description Remark
By Issued
26
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI PARKHOMES),
ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN
BHD
3472/INF/MEMO-
1 ZLSB 17/10/2024 3472/INF/MEMO-01 Check and repair sediment fencing 18/10/2024 5/11/2024
01 ✓
Make a proper place to repair machinery
3472/INF/MEMO-
2 ZLSB 17/10/2024 3472/INF/MEMO-02 and make sure the hydraulic oil proper 18/10/2024 26/11/2024
02 ✓
clean.
3 ZLSB 17/10/2024 3472/INF/MEMO-03 Make sure the concrete debris clean. 18/10/2024 30/12/2024 3472/INF/MEMO-03 ✓
4 ZLSB 17/10/2024 3472/INF/MEMO-04 Make sure the concrete debris clean. 18/10/2024 31/12/2024 3472/INF/MEMO-04 ✓
3472/INF/MEMO-
5 ZLSB 5/11/2024 3472/INF/MEMO-05 Do not install silt fence 6/11/2024 16/12/2024
05 ✓
3472/INF/MEMO-
6 ZLSB 5/11/2024 3472/INF/MEMO-06 Rusty hoarding fence legs 6/11/2024 17/12/2024
06 ✓
27
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI PARKHOMES),
ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
Site Safety
1 1 100 0 0
Supervisor
Total 4 4 100% 0 0
No. of
No. of CIDB Nos. of
Accredited (%) of Accredited % of Remarks (Interview
Trade Skilled Submitted to
Skilled Skilled Workers Submitted by CIDB etc.)
Workers CIDB
Workers
Bar bending 1 1 100% 0 0
Carpenter 1 1 100% 0 0
Machinery
2 2 100% 0 0 -
Operator
Excavator
2 2 100% 0 0%
Operator
Tractor
1 1 100% 0 0%
Operator
Total 13 9 100% 0 0%
PERCENTAGE PERCENTAGE
TOTAL PERCENTAGE
ACCREDITED SUBMITTED
(%)
(%) (%)
Skilled
100% 0% 100%
Workers 29
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443,
PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR
PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
28
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR PUTERI,
MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
2 11/09/24 282,126.12 615,655.74 20/09/24 26/09/24 261,722.27 585,551.80 29/10/24 261,722.27 585,551.80
3 16/10/24 764,118.14 1,379,773.88 30/10/24 05/11/24 746,426.70 1,331,978.50 06/12/24 746,426.70 1,331,978.50
29
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443,
PTD 222112 & PTD 222113 (ESTUARI PARKHOMES), ISKANDAR
PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL
TA’ZIM FOR BANDAR NUSAJAYA DEVELOPMENT SDN BHD
30
Progress Photo ESTUARI PARKHOMES
13/11/2024- 27/12/2024
31
UEM Sunrise Project QHSE Item Minute Of Meeting Progress / Contractor Progress Report
Item Remarks
7 Fogging and larvaciding Contractor to carry out weekly. Last fogging carried out on 28/11/2024
8 Housekeeping Proper housekeeping at site shall be strictly comply as per QHSE’s requirement as following:
I. Roads must be kept clean at all times.
II. Dust control must be carried out during hot season. Based on QHSE requirement,
Contractor to dewatering on daily basis.
10 Covid-19 SOP/ Infectious Disease Contractor shall be responsible to follow all statutory requirements, laws and regulations as set
Control out by the government
14 Workers Quarters & Site Office EKSB has relocated workers quarter at SILC.
Item Remarks
3 Toilet and sludge discharge 2 nos. of toilet in use-sample submitted, weekly maintenance
Average:
2.4 CIDB Green Card & Accreditation Status
Trade/Category No. Total of No. CIDB Percentage CIDB No. Accredited Percentage CIDB No of Interview
Manpower Green Card GC(%) Accredited (%) Submitted Date by
Accreditation CIDB
Main Contractor
2.5 QUALITY
Item Remarks
4 QAQC Report QAQC report No.6 will be email on 5/12/2024. Safety &
quality audit carried out 23/10/2024.
Average: 66.8%
SITE MEETING MINUTES
PROPOSED RESIDENTIAL DEVELOPMENT IN PTD 200441, PTD 200443, PTD 222112 & PTD 22213 (ESTUARI PARKHOMES),
ISKANDAR PUTERI, MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR DARUL TA’ZIM FOR BANDAR NUSAJAYA
DEVELOPMENT SDN BHD
- SITE CLEARANCE, EARTHWORKS, DETENTION POND AND OTHER INFRA WORKS
Attendance:
*(Pn. Isfalina Ismail) Bandar Nusajaya Development Sdn. Bhd. Client - Project BND-EPL
En. Omar Jusoh Bandar Nusajaya Development Sdn. Bhd. Client - Project BND-EPL
Pn. Saloha Samat Bandar Nusajaya Development Sdn. Bhd. Client - Project BND-EPL
En. Mohd Fakhri Hafiz Bandar Nusajaya Development Sdn. Bhd. Client - Project BND-EPL
*(En. Amal Asyraf Husain) UEM Sunrise Sdn. Bhd. Client - Contract UEMS-CM
Pn. Jayyidah Muhammad UEM Sunrise Sdn. Bhd. Client - Contract UEMS-CM
*(Pn. Diyana Izzati Shamsudin) UEM Sunrise Sdn. Bhd. Client - Contract UEMS-CM
Pn. Reena Farina Mohd Rizal UEM Sunrise Sdn. Bhd. Client - Contract UEMS-CM
En. Sangeleswaran a/l Sangarapandy UEM Sunrise Sdn. Bhd. Client - HSSE UEMS-HSSE
*(En. Muhd Yusri Sapieh) UEM Sunrise Sdn. Bhd. Client - HSSE UEMS-HSSE
*(En. Amir) UEM Sunrise Sdn. Bhd. Client – Site Team UEMS-SITE
*(En. Wan Hairul Azhar Wan Hussein) UEM Sunrise Sdn. Bhd. Client – Site Team UEMS-SITE
*(Mr. Peter Lim) Zaidun-Leeng Sdn. Bhd. Infra Engineer - C&S ZLSB
En. Muhammad Azizan Jaafar Zaidun-Leeng Sdn. Bhd. Infra Engineer - C&S ZLSB
En. Muhammad Redza Zaidun-Leeng Sdn. Bhd. Infra Engineer - C&S ZLSB
*(Pn. Hannah Syafiah Ridzuan) Zaidun-Leeng Sdn. Bhd. Infra Engineer - C&S ZLSB
*(En. Mohd Firdaus Ishak) Zaidun-Leeng Sdn. Bhd. C&S IOW ZLSB
*(Sr. Faridah Nonsah) BCQS Consult Sdn. Bhd. Quantity Surveyor BCQS
*(Sr. Zulikha Mohd Salim) BCQS Consult Sdn. Bhd. Quantity Surveyor BCQS
Pn. Nurizzati Syafiqa Suhaimi BCQS Consult Sdn. Bhd. Quantity Surveyor BCQS
*(En. Nasrullah Dato Muda) Emaskang Sdn. Bhd. Contractor EKSB
Mr. Ho Kah Heng Emaskang Sdn. Bhd. Contractor EKSB
En. Rahman Kasim Emaskang Sdn. Bhd. Contractor EKSB
Pn. Tuan Nur Syahira Emaskang Sdn. Bhd. Contractor EKSB
En. Khairul Rijal Emaskang Sdn. Bhd. Contractor EKSB
En. Aidil Ramzan Abdul Manan Emaskang Sdn. Bhd. Contractor EKSB
En. Mohamad Khairul Aiman Emaskang Sdn. Bhd. Contractor EKSB
En. Khairul Hazmie Emaskang Sdn. Bhd. Contractor EKSB
Absent with Apologies: *( )
CONTRACT INFORMATION
4. Construction Period : Section 1 (Parcel 2C1, 2C2, Detention Pond) - 09 December 2024
6 months from the Date of Commencement.
10. Liquidated and Ascertained Damages (LAD) : Section 1 - RM1,400.00 per calendar day
: Section 2 - RM2,400.00 per calendar day
MINUTES OF MEETING (MOM) NO. 14
Action Date of
Item Description
/ Status Action
1.0 INTRODUCTION
2.1 ZLSB informed Contract Information has been listed at front page of MOM for reference. Info
3.2 Contractor Progress Report: Progress Report No. 13 (Period ending: 13/12/2024) received Info
on 17/12/2024.
4.0 CIDB
Accredited (%)
Accreditation
Green Card
CIDB GC (%)
Date by CIDB
Accredited
Submitted
Percentage
No. CIDB
No. CIDB
No. Total of
Interview
Manpower
Percentage
No of
CIDB
Main Contractor
Project 1 1 100% 0 0% 0 -
Manager
Supervisor 1 1 100% 0 0% 0 -
Safety
1 1 100% 0 0% 0 -
Supervisor
TOTAL 1 1 100% 0 0% 0 -
Sub Contractor (To seperate skilled & unskilled workers)
Bar bending 1 1 100% 0 0 0 0
Bar cutting 1 1 100% 0 0 0 0
Brick Layer 1 1 100% 0 0 0 0
Carpenter 1 1 100% 0 0 0 0
Drain Layer 1 1 100% 0 0 0 0
Machinery 2 2 100% 0 0 0 0
Operator
Drainage
Excavator 2 2 100% 0 0 0 0
Backhoe
Tractor 1 1 100% 0 0 0 0
Infra (turfing) 4 4 100% 0 0 0 0
TOTAL
Previous
TOTAL 14 14 100% 0 0 0 0
Current
5.1 Nil.
Page 2 | 4
MINUTES OF MEETING (MOM) NO. 14
6.1 Nil.
Average:
Item Remarks
Average:
66.8%
9.1 ZLSB requested EKSB to maintain the signage throughout the construction period. Info
11.1 EKSB informed that they will do the rectify works after the site valuation. EKSB 11/12/2024
11.2 EKSB informed that they will issue payment to MBIP on the penalty cost imposed. EKSB 18/12/2024
11.3 EKSB informed that they will issue RFI regarding natural water flow crossing the future EKSB 19/12/2024
road near the sewer pump station area.
Page 3 | 4
MINUTES OF MEETING (MOM) NO. 14
11.4 EKSB informed that they need to do the excavation work to find out the depth of unsuitable EKSB 19/12/2024
material (USM).
Please note the action columns and undertake to complete your respective tasks as agreed.
Page 4 | 4