Tunnel-2
No IP device will be installed.
Tunnel-3
TR-3 ( Portal- Start from Sukhovi end) to TR-11 (Portal End towards Molvom end)
1. The TR wise IP scheme is as below:
2. Port 2 (SFP ) to Port 1(SFP) & Vice versa to be used for Uplink for next switch with Tx /Rx of OFC patch cord changed
3. Port 3 (SFP) to Next Port-3 (SFP) to be used for interswitch communication. With OFC patch cord crossed.
4. Copper ports 5&6 for IP camera , 7 for Speaker & 8 for Emergency telephobe to be used on field switch.
5. 12 Core of OFC will be terminated at at each TR.
6. 4 Core will be used for Networking.
7. All above will be installed in 6 U wall mounted rack.