Assignment 3
Assignment 3
ASSIGNMENT 3
[i] General Instructions:
• In a group of max. FOUR (4) members to prepare ONE (1) a presentation and a
‘report’ in the form of PowerPoint slides (ppt).
• All groups must virtually visit a different food factory/processing plant [e.g. youtube,
video, website etc.].
• Every group leader must register a virtual address of a food processing plant in
Googleform: https://forms.gle/ivXHg6bmbuzcZydB8
• The selection is based on first come first serve basis, please check (only can view)
the list of registered food processing plant in Googlesheet:
https://docs.google.com/spreadsheets/d/1M4QpJ_-
pl4HcTd88rB_x2eYvthyf9bwxVmQLruV9BYU/edit?usp=sharing
[ii] Tasks:
VIRTUAL INDUSTRIAL VISIT
Presentation / ‘report’ content:
A) Company background
▪ The website address and Youtube link must be reported.
▪ Company information (brief)
▪ Process Flow Diagram
B) Description on the food processing
▪ Manufacturing processes
➢ Explanation on major components of the process (unit operations) and types,
functions and efficiency of each unit operations (need to show the equipment
schematic diagram).
▪ Calculations on heat transfer equipment in the processing
➢ Present TWO (2) calculations on the unit operations involving heat transfer in the
selected food processing plant such as boiler, condenser, heat exchanger,
evaporator, refrigerator, and freezer.
➢ Suggestion: A sketch of the heat transfer unit, An objective/problem statement,
Assumptions, Fluid properties, Theory (Equation involved), Calculated values, etc.
C) Conclusions
➢ Importance of heat transfer in the food processing.
➢ Performance of the technology (e.g. energy efficiency, by-products or waste).
[iii] Presentation
▪ Presentation time: maximum 15 minutes per group
▪ Number of presentation slides: maximum 20 slides.
▪ Q & A session: 5 - 10 minutes
▪ Every team member must participate in the presentation.
▪ Tentative presentation date: Week 50 (9-13th December 2024)