0% found this document useful (0 votes)
71 views21 pages

Log Book 2024-25

The document outlines the B.E. project log book for the Electronics & Telecommunication Engineering department at Marathwada Mitra Mandal's College of Engineering, Pune. It details the project examination scheme, including assessment criteria, group sizes, and project topic selection guidelines. Additionally, it provides a schedule for project activities and a monthly activity chart for tracking progress.

Uploaded by

sarvajeetpatil09
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views21 pages

Log Book 2024-25

The document outlines the B.E. project log book for the Electronics & Telecommunication Engineering department at Marathwada Mitra Mandal's College of Engineering, Pune. It details the project examination scheme, including assessment criteria, group sizes, and project topic selection guidelines. Additionally, it provides a schedule for project activities and a monthly activity chart for tracking progress.

Uploaded by

sarvajeetpatil09
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 21

Marathwada Mitra Mandal's

COLLEGE OF ENGINEERING, PUNE


Permanently Affiliated to SPPU
Accredited with “A++” Grade by NAAC
Recipient of ‘Best college’ award by SPPU
Accredited by NBA (E&TC, IT,Electrical and Mechanical Engineering)

B.E. PROJECT LOG BOOK

DEPARTMENT
OF
ELECTRONICS & TELECOMMUNICATION
ENGINEERING
PROJECT EXAMINATION SCHEME
Project Phase-I (404188)
Teaching Scheme: Tutorial: 2Hrs/week Examination Scheme: TW: 50 Marks

Note:

1. Term work assessment is based on the project topic. It consists of Literature Survey and basic
project work. The abstract of the project should be submitted before Term work assessment.
2. The report consists of the Literature Survey, basic project work and the size of the report should
be maximum of 40 pages.
3. The examination is conducted by two examiners (internal and external) appointed by the
university. The examiners appointed must have minimum 5 years of experience with UG
qualification or 2 years with PG qualification.
4. The assessment is based on Innovative Idea, Depth of understanding, Applications, Individual
contributions, presentation, and the grade given by the internal guide based on the work carried
out in a semester.
5. A certified copy of report is required to be presented to external examiner at the time of final
examination.

Project Phase-II (404195)


Teaching Scheme: Tutorial: 6 Hrs/week Examination Scheme: TW:100 Marks OR: 50 Marks

1. Group Size
The student will carry the project work individually or by a group of students. Optimum group size
is in 3 students. However, if project complexity demands a maximum group size of 4 students, the
committee should be convinced about such complexity and scope of the work.
2. Selection and approval of topic
Topic should be related to real life application in the field of Electronics and Telecommunication
OR Investigation of the latest development in a specific field of Electronics or Communication or
Signal Processing OR The investigation of practical problem in manufacture and / or testing of
electronics or communication equipment OR The Microprocessor / Microcontroller based
applications project is preferable. OR Software development project related to VHDL,
Communication, Instrumentation, Signal Processing and Agriculture Engineering with the
justification for techniques used / implemented is accepted. OR Interdisciplinary projects should
be encouraged. The examination will be conducted independently in respective departments.
3. Note:
The group should maintain a logbook of activities. It should have entries related to the work done,
problems faced, solution evolved etc., duly signed by internal and external guides. Project report
must be submitted in the prescribed format only. No variation in the format will be accepted. One
guide will be assigned at the most 3 project groups.

1
MARATHWADA MITRA
MANDAL’S

COLLEGE OF
ENGINEERING, PUNE
Accredited with 'A' Grade by NAAC
Group No.:
Department of
Electronics &
Telecommunication
Engineering
Name of Project:

Sr. Name of the student Roll No. Exam No. Mobile No. T.E. Result Placement Details
No.
1. %

2. %

3. %

4. %

5. %

Name of Internal Guide: Name of External Guide:


2
Mobile No.: Name & Address of Company:

Off.: Mobile No.: Off.

E-Mail: E-Mail:

3
Undertaking by Students

We, the students of B.E. E&TC Div. I / II hereby assure that we


will follow all the rules and regulations related to the project activity
for the academic year 20 - 20 . The Project entitled -

will be fully designed / developed by us and the project (Hardware


& Software) will not be readymade purchase from outside parties. If
found by the examiners, we will be responsible for further
consequences.

Name of the student Signature

1. -

2. -

3. -

4. -

4
Insert Synopsis Here

5
Insert Company Sponsorship Certificate Here

6
Project Schedule
Semester – I

Sr. No. Activity Scheduled Week

Registration of project groups (maximum 3


1. 3rd week of June
students per group)

2. Finalization of project guide 1st week of July

3. Reporting to respective project guide 1st week of July

4. Project work Evaluation (I)Title Finalization 2nd week of July

5. Incorporate changes suggested in titles 3rd week of Jul

6. Synopsis submission 1st weak of August

7. Finalization of sponsored Projects 1st week of September

8. Project work Evaluation (II) 3rd week of September

Submission of draft copy of seminar report to


9 4th week of September
guide

10. Submission of seminar report in prescribed format 1st week of October

As specified by Pune University


11. Project (Part I) Examination
(Likely in 3rd week of October)

Semester – II

Sr. No. Activity Scheduled Week

1. Project work Evaluation (III) 2nd week of January

2. Final demonstration before Internal Guide 1st week of March

3. Final demonstration before External Reviewer 2nd week of March

4. Project work Evaluation (IV) (Project Exhibition) 3rd week of March

7
5. Submission of draft copy of project report to guide 4th week of March

6. Final submission of project report & project book 1st week of April

7 Patent, copyright and Publication follow ups 2nd week of April

8 Project (Part II) Examination As specified by Pune University

8
Monthly Activity Chart
Month: July

Wee
Activity Sign. of Int. &
k Date Planned Activity Signature of Student
Completed Ext. Guide
No.
1 3
/ / 20
2 4

1 3
1 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
2 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
3 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
4 / / 20
2 4

1 3
/ / 20
2 4
Monthly Activity Chart
Month: August

Wee
Activity Sign. of Int. &
k Date Planned Activity Signature of Student
Completed Ext. Guide
No.
1 3
/ / 20
2 4

1 3
1 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
2 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
3 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
4 / / 20
2 4

1 3
/ / 20
2 4

Monthly Activity Chart


Month: September
Wee
Activity Sign. of Int. &
k Date Planned Activity Signature of Student
Completed Ext. Guide
No.
1 3
/ / 20
2 4

1 3
1 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
2 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
3 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
4 / / 20
2 4

1 3
/ / 20
2 4
Monthly Activity Chart
Month: October

Wee
Activity Sign. of Int. &
k Date Planned Activity Signature of Student
Completed Ext. Guide
No.
1 3
/ / 20
2 4

1 3
1 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
2 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
3 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
4 / / 20
2 4

1 3
/ / 20
2 4
Monthly Activity Chart
Month: November

Wee
Activity Sign. of Int. &
k Date Planned Activity Signature of Student
Completed Ext. Guide
No.
1 3
/ / 20
2 4

1 3
1 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
2 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
3 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
4 / / 20
2 4

1 3
/ / 20
2 4
Monthly Activity Chart
Month: December

Wee
Activity Sign. of Int. &
k Date Planned Activity Signature of Student
Completed Ext. Guide
No.
1 3
/ / 20
2 4

1 3
1 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
2 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
3 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
4 / / 20
2 4

1 3
/ / 20
2 4

Monthly Activity Chart


Month: January

Wee
Activity Sign. of Int. &
k Date Planned Activity Signature of Student
Completed Ext. Guide
No.
1 3
/ / 20
2 4

1 3
1 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
2 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
3 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
4 / / 20
2 4

1 3
/ / 20
2 4
Monthly Activity Chart
Month: February

Wee
Activity Sign. of Int. &
k Date Planned Activity Signature of Student
Completed Ext. Guide
No.
1 3
/ / 20
2 4

1 3
1 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
2 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
3 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
4 / / 20
2 4

1 3
/ / 20
2 4
Monthly Activity Chart
Month: March

Wee
Activity Sign. of Int. &
k Date Planned Activity Signature of Student
Completed Ext. Guide
No.
1 3
/ / 20
2 4

1 3
1 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
2 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
3 / / 20
2 4

1 3
/ / 20
2 4

1 3
/ / 20
2 4

1 3
4 / / 20
2 4

1 3
/ / 20
2 4
Details of the meeting between Internal guide and External

guide Semester I
Sr. D Locati Details of Discussion Signature
No. at on
e

Remarks if any by External Examiner of Project Part I (Seminar)-

Semester II
Sr. D Locati Details of Discussion Signature
No. at on
e

Remarks if any by External Examiner of Project Part II -

MMCOE, Dept. of E&TC Engg.


Participation in Project Competition
Certificates / Prizes
Sr. Name & Place of project completion / exhibition D won (if any)
No. at
e

(Attach photo copy of certificates)

Paper publication / Presentation


Certificates / Prizes
Sr. Name of the organizing society D won (if any)
No. at
e

MMCOE, Dept. of E&TC Engineering


Patent publication/Product
Certificates / Prizes
Sr. Name of the organizing society D won (if any)
No. at
e

Name of Students: Name of Guide

You might also like