SAP Implementation Project Types Project Phases 1741195824

The document outlines SAP implementation types and phases, detailing five project types including New Implementation, Roll-Out, and Upgrade projects. It describes the phases for both SAP ECC and SAP S4/HANA projects, highlighting methodologies, key activities, and testing processes involved in each phase. Additionally, it emphasizes the importance of user training, data migration, and post-go-live support.

Uploaded by

Gabriel Biazotto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views6 pages

SAP Implementation Project Types Project Phases 1741195824

The document outlines SAP implementation types and phases, detailing five project types including New Implementation, Roll-Out, and Upgrade projects. It describes the phases for both SAP ECC and SAP S4/HANA projects, highlighting methodologies, key activities, and testing processes involved in each phase. Additionally, it emphasizes the importance of user training, data migration, and post-go-live support.

Uploaded by

Gabriel Biazotto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

1

‫بسم هللا الرحمن الرحيم‬

SAP
SAP Implementation (Project Types & Project Phases)
Source: Click Here

By: Ahmed Abo Ghaly WwW.AboGhaly.Com ©All Rights Reserved.


2

• Index
1) SAP Implementation:
1- Project Types:
➔ New Implementation Project (Green Field).
➔ Roll-Out Project.
➔ SAP S4/HANA Conversion Project.
➔ SAP Upgrade Project (Brown Field).
➔ SAP Support Project.
2- Project Phases:
➔ SAP ECC Project:
➢ Methodology.
➢ Phases.
➔ SAP S4/HANA Project:
➢ Methodology.
➢ Phases.
➔ Project Key-Activities:

By: Ahmed Abo Ghaly WwW.AboGhaly.Com ©All Rights Reserved.


3

1) SAP Implementation:
1- Project Types:
1. New Implementation Project (Green Field):
A company with no existing ERP system or using a different system is implementing SAP from scratch.

2. SAP S4/HANA Conversion Project (Brown Field):


The company is migrating from SAP ECC to SAP S/4HANA.
This involves converting existing data and processes rather than starting fresh.

3. SAP Upgrade Project:


The company is upgrading an existing SAP ECC or S/4HANA system to a newer version.

4. Roll-Out Project:
A company with an existing SAP system is extending it to a new company code, country, or business unit.

5. SAP Support Project:


Providing ongoing support, maintenance, or activating new functionalities in an existing SAP system.
This includes bug fixes, process optimizations, and minor enhancements.

By: Ahmed Abo Ghaly WwW.AboGhaly.Com ©All Rights Reserved.


4

2- Project Phases:
1. SAP ECC Project:
1- Methodology:
Follows Accelerated SAP (ASAP) Methodology, which is based on the Waterfall approach.

2- Phases:
Phase Details
- Handled By Project Manager.
- Define Project Scope/Objectives/Plan.
1- Preparation - Define Members.
- Plan logistics (e.g., meeting rooms, schedules).
- Kick-off.
- Meet with key users to understand business processes and pain points.
- Demonstrate the SAP best practice to align business needs.
- Prepare the blueprint:
It’s a contract that contains:
2- Blueprint All system process to be implemented.
(Exploration)
All Required configurations.
All Necessary development/ customizations (RICEFW).
- RICEFW:
(Reports, Interfaces, Conversions, Enhancements, Forms, and Workflows).
- Consultants configure the system according to the approved blueprint.
- Developers implement custom developments (if needed).
3- Realization - Testing Phases:
Unit Testing (individual module testing).
System Integration Testing (SIT): End-to-end testing across modules.
- Show the implemented system to the business users.
- Train the key users.
- Prepare the training manuals.
4- Final Preparation - Prepare the test script.
(Deploy) - UAT (User Acceptance Test):
The end user to test the system and confirm that it’s meet the business needs.
- Master Data Migration (Templets).
- Cut-Over Activates (by consultant and business).
- The system is officially activated for business use.
5- Go live - Provide support to resolve any post-go-live issues.
- Monitor system performance and ensure business continuity.

SAP ECC Project Phases:

Final
Prepare BluePrint Realization Go Live
Preparation

By: Ahmed Abo Ghaly WwW.AboGhaly.Com ©All Rights Reserved.


5

2. SAP S4/HANA Project:


1- Methodology:
Follows SAP Activate Methodology, which is based on the Agile approach.

2- Phases:
Phase Details
1- Discover - Explore new features in S4/HANA (If Upgrade).
- Handled By Project Manager.
- Define Project Scope/Objectives/Plan.
2- Prepare
- Define Members.
(Project Manager)
- Plan logistics (e.g., meeting rooms, schedules).
- Kick-off.
- Meet with key users to understand business processes and pain points.
- Demonstrate the SAP best practice to align business needs.
- Prepare the blueprint:
It’s a contract that contains:
3- Explore All system process to be implemented.
All Required configurations.
All Necessary development/ customizations (RICEFW).
- RICEFW:
(Reports, Interfaces, Conversions, Enhancements, Forms, and Workflows).
- Consultants configure the system according to the approved blueprint.
- Developers implement custom developments (if needed).
4- Realize - Testing Phases (Agile approach):
Unit Testing (individual module testing).
System Integration Testing (SIT): End-to-end testing across modules.
- Hold Regular Stand-up Meetings (Steering committee) to track progress.
- Conduct User Training:
Show the implemented system to the business users.
Train the key users.
Prepare the training manuals & test script.
- UAT (User Acceptance Test):
Perform User Acceptance Testing (UAT) to validate business requirements.
5- Deploy - Master Data Migration:
Transfer legacy data to SAP using templates.
- Cutover Activities:
Prepare for system go-live by finalizing configurations, data, and user readiness.
- Fit-Gap:
Compare existing (legacy) system with SAP S/4HANA to address differences.
- The system is officially activated for business use.
6- Go Live (Run) - Provide support to resolve any post-go-live issues.
- Monitor system performance and ensure business continuity.

SAP S4/HANA Project Phases:

Discover Prepare Explore Realize Deploy Run

Support
Implement

By: Ahmed Abo Ghaly WwW.AboGhaly.Com ©All Rights Reserved.


6

3. Project Key-Activities:

Explore

Prepare for Fit/Gap Solution Validation Solution Validation Prioritize Deltas Design Solution for Deltas
Workshops Workshops Workshops

Complete documentation

Realize

Solution Phase Closure Walkthrough Set up DEV system for


Configuration and Sign-off Sessions configuration
Cleanse data
Q

Design and set-up user


roles and security Deploy

Set up QA system environment Key User training User Integration Dry-Run Phase Closure and
for integration testing Testing Sign-off

Q
Submit Master Data

By: Ahmed Abo Ghaly WwW.AboGhaly.Com ©All Rights Reserved.