ISO 17043 2023 Mahmoud (Compatibility Mode)
ISO 17043 2023 Mahmoud (Compatibility Mode)
Introduction
Mahmoud Eltayeb
1
Introduction
The main changes compared to the previous edition
are as follows:
harmonization with ISO/IEC 17025:2017, including technical
requirements and structure;
harmonization with ISO 13528:2022 in terms of terminology;
incorporation of requirements from ISO/CASCO PROC 33;
inclusion of the requirement that testing & calibration activities
and PT item production conform to the relevant requirements of
appropriate ISO conformity assessment standards;
deletion of Annex C and revision of Annexes A and B.
Alignment with the CASCO common structure for standards
and incorporation of CASCO common elements in clauses on
impartiality, confidentiality, complaints and management system
Mahmoud Eltayeb
Introduction
Transition Period
Transition period of 3 years has been approved by ILAC on 15
Nov 2022
2
Introduction
Transition Period
The AB is required to establish a transition plan to ensure
conforming with the requirements of the new edition of the
standard.
The transition time will be completed before the due date of 3
years
The accreditation of the PTP to the new revision will be based
on regular or extraordinary assessments
All NCs resulting from the assessments based on the new
ISO/IEC 17043 will be closed before the end of the transition
period
Mahmoud Eltayeb
1. Scope
2. Normative references
3. Terms and definitions
4. General requirements
4.1 Impartiality
4.2 Confidentiality
5. Structural requirements
6. Resources requirements
6.1 General
6.2 Personnel
6.3 Facilities and environmental conditions
6.4 External provided products and services
Mahmoud Eltayeb
3
ISO/IEC 17043: 2023 Contents
7. Process requirements
7.1 Establishing, contracting and communicating the PT scheme
objectives.
7.1.1 Review of requests, tenders and contracts
7.1.2 PT scheme communication
7.2 Design and planning of a PT scheme
7.2.1 General
7.2.2 Statistical design
7.2.3 Determination of assigned values
7.3 Production and distribution of PT items
7.3.1 Production of PT items.
7.3.2 Homogeneity and stability assessment of PT items
7.3.3 Handling and storage of PT items
7.3.4 Packaging, labelling and distribution of PT items
7.3.5 Instructions for participants
Mahmoud Eltayeb
Mahmoud Eltayeb
4
ISO/IEC 17043: 2023 Contents
8. Management system requirements
8.1 General requirements
8.2 Management system documentation
8.3 Control of Management system documents
8.4 Control of records
8.5 Actions to address risks and opportunities
8.6 Improvements
8.7 Corrective actions
8.8 Internal audit
8.9 Management review
Mahmoud Eltayeb
1. Scope
This document specifies general requirements for the
competence and impartiality of proficiency testing (PT)
providers and consistent operation of all proficiency testing
schemes.
Mahmoud Eltayeb
5
2.Normative references
Mahmoud Eltayeb
6
4. General requirements
4.1 Impartiality
The PT activities are undertaken impartially
4. General requirements
4.2 Confidentiality
Mahmoud Eltayeb
7
4. General requirements
4.2 Confidentiality
5. Structural requirements
The PTP is a legal entity, or a defined part of a legal entity, that is
legally responsible for its lab activities.
(governmental PTP is deemed to be a legal entity on the basis of its
governmental status)
Mahmoud Eltayeb
8
5. Structural requirements
The PT activities meet the requirements of this standard, customers,
participants , regulatory authorities and organizations providing
recognition.
The PT activities can be performed in PTP permanent facilities and
any other facility or site
Mahmoud Eltayeb
5. Structural requirements
The PTP has personnel with authorities and responsibilities to carry
out their duties including:
Implementation, maintenance and improvement of MS
Identification of deviations from the MS for performing activities
Initiation of actions to prevent or minimize such deviations;
Reporting to its management on the performance of MS and any
need for improvement;
Ensuring the effectiveness of PT activities.
9
6. Resource requirements
6.1 General
The PTP has access to the personnel, facilities, equipment, systems
and support services necessary to manage and perform its PT
activities.
6. Resource requirements
6.2 Personnel
Access to a sufficient number of competent personnel to perform PT
activities.
Mahmoud Eltayeb
10
6. Resource requirements
6.2 Personnel
Documented information demonstrating competence of personnel
including the requirements for education, qualification, training,
technical knowledge, skills and experience.
6. Resource requirements
6.3 Facilities and environmental conditions
Appropriate facilities for the operation of the PT scheme.
11
6. Resource requirements
6.3 Facilities and environmental conditions
Access control to, and use of, areas affecting the PT activities are
managed. The extent of access control based on particular
circumstances is determined.
Mahmoud Eltayeb
6. Resource requirements
6.4 Externally provided products and services
External service providers are not used for the following activities:
the design and planning of PT schemes;
the evaluation of performance;
the authorization of reports
This does not prevent the PT provider from using advice or
assistance from any advisors, experts or steering groups.
12
6. Resource requirements
6.4 Externally provided products and services
Mahmoud Eltayeb
6. Resource requirements
6.4 Externally provided products and services
13
Case Study 1
Group Work
Each individual should be given the opportunity to participate
Mahmoud Eltayeb
7. Process requirements
Item
Item
request PT
Report
Mahmoud Eltayeb
14
7. Process requirements
7.1 Establishing, contracting and communicating the PT
scheme objectives
7.1.1 Review of requests, tenders and contracts
Procedure for the review of requests, tenders and contracts:
The objectives of the PT scheme are sufficiently defined and in
agreement with the customers' needs
The requirements are adequately defined, documented &
understood
The PTP has the capability and resources to meet the
requirements
the PT scheme is technically appropriate taking into account the
needs of the given application or field of application.
This review is particularly important when a customer requests a PT
scheme to be created for a specific purpose or for a different level or
frequency of participation from that normally offered.
Mahmoud Eltayeb
7. Process requirements
7.1 Establishing, contracting and communicating the PT
scheme objectives
7.1.1 Review of requests, tenders and contracts
The review covers all aspects of the request, including any externally
provided products and services.
15
7. Process requirements
7.1 Establishing, contracting and communicating the PT
scheme objectives
7.1.2 PT scheme communication
Detailed information available about the PT scheme to participants
and customers:
Objectives and details of the PT scheme – criteria for participation -
criteria for determining the assigned value and the evaluation of
performance- confidentiality arrangements - critical timelines - any
fees for participation- details of how to apply
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.1 General
Identification , design and planning of the activities which directly
affect the validity of the PT scheme and ensuring that activities are
carried out in accordance with prescribed procedures.
When designing and planning the PT scheme, the relevant standards and
requirements specific to the objectives of the PT scheme can be considered, e.g.
ISO/IEC 17025, ISO 15189, ISO/IEC 17020. Safety and ethical issues can also be
considered.
16
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.1 General
A documented plan is developed before commencement of the PT
scheme that addresses the objectives, purpose and basic design of the
PT scheme. The plan includes the following:
a) Personnel involved in the design and operation of PT scheme;
b) activities to be undertaken by external providers and their contact details;
c) criteria to be met for participation in the PT scheme;
d) the number and type of expected participants in the PT scheme;
e) activities to be performed & results to be reported by participants;
f) a description of the range of values or characteristics, or both, to be expected for
the PT items;
g) potential major sources of errors involved in area of PT offered;
h) requirements for production, quality control, storage & distribution of PT items;
Mahmoud Eltayeb
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.1 General
i) arrangements to prevent collusion between participants or falsification of results and
procedures to be employed if collusion or falsification of results is suspected;
j) a description of the information which will be supplied to participants and the time
schedule for the various phases of the PT scheme;
k) for continuous PT schemes, the frequency or dates upon which PT items will be
distributed to participants, the deadlines for the return of results by participants , the
dates to carry out measurements or tests by participants;
l) any information on methods or procedures which participants must use to store,
handle, prepare, ship or dispose of PT item and perform the measurements or tests;
m) procedures for the measurement or test methods to be used for the homogeneity
and stability testing of PT items
n) preparation of any standardized reporting formats for use by participants;
Mahmoud Eltayeb
17
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.1 General
o) a detailed description of the statistical analysis to be used;
p) the origin, metrological traceability and uncertainty of any assigned values
Note: Assigned values can have uncertainty contributions from sources in addition to
the uncertainty of measurement results used for characterization, such as
inhomogeneity & instability, and interlaboratory differences if more than one
laboratory is used for characterization
q) the treatment of results from different measurement or test methods, where
permitted by the PT scheme;
r) criteria for the evaluation of the performance of participants;
s) a description of the data, interim reports or information to be returned to
participants;
t) a description of the extent to which participant results, and conclusions that are
based on the outcome of the PT scheme, will be made public or shared;
u) actions to be taken in the case of lost, delayed or damaged PT items
Mahmoud Eltayeb
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.2 Statistical design
Statistical designs is developed to meet the objectives of the scheme,
based on the nature of the data (quantitative or qualitative), statistical
assumptions, the nature of errors, and the expected number of results
NOTE Statistical design covers the process of planning, collection, analysis and
reporting of the PT scheme data. Statistical designs are often based on stated
objectives for the PT scheme, such as determination of assigned values with specified
measurement uncertainty
18
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.2 Statistical design
In designing a statistical analysis, PTP gives careful consideration
to the following:
a) the accuracy as well as the measurement uncertainty required or
expected for each measurand or characteristic in PT scheme
b) the minimum number of participants in the PT scheme needed for
the statistical design. In cases of insufficient number of participants
to produce statistically meaningful analysis of results, details of
alternative approaches used to assess participant performance
c) the relevance of significant figures to the reported result,
including the number of decimal places
d) the number of PT items to be measured and the number of repeat
tests or measurement for each PT item
Mahmoud Eltayeb
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.2 Statistical design
e) the procedures used to establish the standard deviation for
proficiency assessment or other evaluation criteria
f) the procedures to be used to treat participant results from different
measurement or test methods which are not technically equivalent,
where permitted by the PT scheme
g) whether the measurement uncertainty of participant results shall
be reported and how it will be used to evaluate the participant's
performance
h) procedures to be used to identify or handle outliers
g) where relevant, the procedures for the evaluation of values
excluded from statistical analysis; and
j) where appropriate, the objectives to be met for the design and the
frequency of PT rounds. Mahmoud Eltayeb
19
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.2 Statistical design
Statistical methods for proficiency testing ( Annex B)
ISO 13528 describes preferred specific methods for each of the
situations discussed below, but also states that other methods may be
used as long as they are statistically valid and are fully described to
participants.
The methods covers the fundamental steps common to nearly all PT
schemes
Preliminary determination of test item homogeneity & stability
Determination of the assigned values
Calculation of performed statistics
Evaluation of performance
Mahmoud Eltayeb
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.3 Determination of assigned values
20
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.3 Determination of assigned values
Mahmoud Eltayeb
7. Process requirements
7.2 Design and planning of a PT scheme
7.2.3 Determination of assigned values
Mahmoud Eltayeb
21
7. Process requirements
7.3 Production and distribution of PT items
7.3.1 Production of PT items
Mahmoud Eltayeb
7. Process requirements
7.3 Production and distribution of PT items
7.3.2 Homogeneity and stability assessment of PT items
22
7. Process requirements
7.3 Production and distribution of PT items
7.3.2 Homogeneity and stability assessment of PT items
Mahmoud Eltayeb
7. Process requirements
7.3 Production and distribution of PT items
7.3.2 Homogeneity and stability assessment of PT items
Mahmoud Eltayeb
23
7. Process requirements
7.3 Production and distribution of PT items
7.3.3 Handling and storage of PT items
7. Process requirements
7.3 Production and distribution of PT items
7.3.4 Packaging, labelling and distribution of PT items
24
7. Process requirements
7.3 Production and distribution of PT items
7.3.4 Packaging, labelling and distribution of PT items
Mahmoud Eltayeb
7. Process requirements
7.3 Production and distribution of PT items
7.3.5 Instructions for participants
25
7. Process requirements
7.3 Production and distribution of PT items
7.3.5 Instructions for participants
Case Study 2
Group Work
Each individual should be given the opportunity to participate
Mahmoud Eltayeb
26
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.1 Data analysis
Mahmoud Eltayeb
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.1 Data analysis
27
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.2 Evaluation of performance
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.2 Evaluation of performance
Mahmoud Eltayeb
28
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.2 Evaluation of performance
The most widely used proficiency test performance statistics are percent
difference, z scores, En number and Zeta score
Mahmoud Eltayeb
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.2 Evaluation of performance
Percent difference
Z Score
z-score: (x – X) / s
where s = PT standard deviation
Mahmoud Eltayeb
29
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.2 Evaluation of performance
Mahmoud Eltayeb
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.2 Evaluation of performance
30
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.2 Evaluation of performance
The En Score
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.2 Evaluation of performance
En Score
| En | < 1 indicates acceptable performance
| En | ≥ 1 indicates unacceptable performance
Mahmoud Eltayeb
31
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.3 PT report
NOTE Where all original data cannot be reported to participants, a summary of the
results, e.g. in tabulated or graphical form, can be supplied.
Mahmoud Eltayeb
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.3 PT report
32
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.3 PT report
g) a unique identification of the report and the PT scheme;
h) a clear description of the PT items used, including necessary
details of the PT item's production and homogeneity and stability
assessment;
i) the results of participants, including the reported measurement
uncertainties;
j) procedures used to statistically analyse the data;
k) statistical data and summaries, including assigned values, range
of acceptable results and graphical displays;
l) details of the metrological traceability, and uncertainty of any
assigned value;
m) procedures used to establish any assigned value and its
uncertainty; Mahmoud Eltayeb
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.3 PT report
n) assigned values, their uncertainties and summary statistics for
measurement or test methods used by each group of participants (if
different measurement or test methods are used by different groups);
o) procedures used to establish the standard deviation for
proficiency assessment, or other criteria for evaluation;
p) comments on the performance of participants;
q) information about design and implementation of the PT scheme;
r) advice on the interpretation of the statistical analysis;
s) comments or recommendations based on the outcomes of the PT
round.
NOTE For continuous PT schemes, it can be sufficient to have simpler reports,
such that many of the elements in this subclause (7.4.3.2) can be excluded from
routine reports but included in the PT scheme procedures or in periodic summary
reports that are available to participants.
Mahmoud Eltayeb
33
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.3 PT report
PTP has a policy for the use of reports by participants and customers
7. Process requirements
7.4 Evaluation and reporting of PT scheme results
7.4.3 PT report
When issuing an amended report to a subset of participants, an
analysis of the potential impact on the other participants for that PT
scheme and/ or PT round is made to ensure there is no influence on
the general performance of the other participants.
Mahmoud Eltayeb
34
7. Process requirements
7.5 Control of the PT scheme process
7.5.1 Technical records
Technical records for each PT activity contain the results, reports and
sufficient information to facilitate, if possible identification of factors
affecting the PT performance evaluation and enable the repetition of
the PT activity under conditions as close as possible to the original.
The technical records include the date and the identity of personnel
responsible for each PT activity and for checking data and results.
7. Process requirements
7.5 Control of the PT scheme process
7.5.1 Technical records
Mahmoud Eltayeb
35
7. Process requirements
7.5 Control of the PT scheme process
7.5.2 Control of data and information management
Access to the data and information needed to perform PT activities.
7. Process requirements
7.5 Control of the PT scheme process
7.5.2 Control of data and information management
The PT provider information management system:
be protected from unauthorized access
be safeguarded against tampering and loss
be operated in an environment that complies with supplier or PT
provider specifications or, in the case of non-computerized
systems, provides conditions which safeguard the accuracy of
manual recording and transcription
be maintained in a manner that ensures the integrity of the data
and information;
include recording system failures and the appropriate immediate
and corrective actions.
Mahmoud Eltayeb
36
7. Process requirements
7.5 Control of the PT scheme process
7.5.2 Control of data and information management
When a PT provider information management system is managed
and maintained off-site or through an external provider, the PT
provider ensures that the provider or operator of the system complies
with all applicable requirements of this standard.
Mahmoud Eltayeb
7. Process requirements
7.5 Control of the PT scheme process
7.5.3 Surveillance of the processes
A procedure to ensure the validity of the PT scheme. Surveillance
activities are planned and reviewed with resulting data recorded for
the continuous improvement process.
37
7. Process requirements
7.5 Control of the PT scheme process
7.5.4 Nonconforming work
7. Process requirements
7.5 Control of the PT scheme process
7.5.4 Nonconforming work
Mahmoud Eltayeb
38
7. Process requirements
7.6 Handling of complaints
7. Process requirements
7.6 Handling of complaints
Mahmoud Eltayeb
39
7. Process requirements
7.6 Handling of complaints
Mahmoud Eltayeb
7. Process requirements
7.7 Handling of appeals
A documented procedure for handling appeals that includes at least:
a description of the process for receiving, substantiating and
investigating the appeal and deciding on actions to be taken
b) tracking and recording the appeals , including the actions
undertaken to resolve it;
c) ensuring that any appropriate action is taken.
Mahmoud Eltayeb
40
7. Process requirements
7.7 Handling of appeals
The decision on the appeal is made by, or reviewed and approved by,
persons not involved in the decision that is the subject of the appeal
in question.
Case Study 3
Group Work
Each individual should be given the opportunity to participate
Mahmoud Eltayeb
41
8. Management system requirements
8.1 General requirements
8.1.1 The management system is documented, implemented and
maintained to support and demonstrate the consistent fulfilment of the
requirements of this document and its scope of PT activities..
8.1.2 The management system of the PT provider includes the at least
the following:
• policies;
• responsibilities;
• management system documentation (see 8.2);
• control of management system documents (see 8.3);
• control of records (see 8.4);
• actions to address risks and opportunities (see 8.5);
• improvement (see 8.6);
• corrective actions (see 8.7);
• internal audits (see 8.8);
Mahmoud Eltayeb
• management reviews (see 8.9).
.
Mahmoud Eltayeb
42
8. Management system requirements
8.2 Management system documentation
Mahmoud Eltayeb
43
8. Management system requirements
8.3 Control of management system documents
8.3.1 All documents (internal and external) that relate to the fulfillment
of this document are controlled
8.4.3 The PT provider retains records for a period consistent with its
contractual obligations. Access to these records is consistent with the
confidentiality commitments and records are readily available.
Mahmoud Eltayeb
44
8. Management system requirements
8.5 Actions to address risks and opportunities
8.5.1 The risks and opportunities associated with the PT activities are
considered in order to:
give assurance that the MS achieves its intended results;
enhance opportunities to achieve the PT provider purpose &
objectives
prevent, or reduce, undesired impacts and potential failures in the
lab activities;
achieve improvement
Mahmoud Eltayeb
Mahmoud Eltayeb
45
8. Management system requirements
8.5 Actions to address risks and opportunities
Mahmoud Eltayeb
46
8. Management system requirements
8.6 Improvement
8.6.1 The PT provider identifies and select opportunities for
improvement and implement any necessary actions.
8.6.2 The PT provider seeks feedback, both positive and negative, from
its participants and customers. The feedback is analysed and used to
improve the management system, PT activities and customer service.
47
8. Management system requirements
8.7 Corrective actions
Mahmoud Eltayeb
Monitor Take
immediate
CAs correction
Identify &
Identify
implement
RCA
CAs
Mahmoud Eltayeb
48
8. Management system requirements
8.8 Internal audit
Mahmoud Eltayeb
49
8. Management system requirements
8.8 Internal audit
50
8. Management system requirements
8.9 Management review (Option A)
8.9.2 The inputs to management review are recorded and include
information related to (continue):
status of actions from previous management reviews;
outcome of recent internal audits;
corrective actions;
assessments by external bodies;
changes in the volume and type of the work in PT activities;
Customer, participant and personnel feedback;
Complaints and appeals;
effectiveness of any implemented improvements;
adequacy of resources;
results of risk identification;
outcomes of the surveillance of the processes;
other relevant factors, such as training.
Mahmoud Eltayeb
8.9.3 The outputs from the management review record all decisions and
actions related to at least:
the effectiveness of the MS and its processes;
improvement of the PT activities related to the fulfillment of the
requirements of this document;
provision of required resources;
any need for change.
Mahmoud Eltayeb
51
Annexes
Mahmoud Eltayeb
Annex A (informative)
Types of PT schemes
A.1 General
A.2 Types of PT schemes
A.3 External quality assessment programmes
A.4 Alternative interlaboratory comparisons
Mahmoud Eltayeb
52
Annex B (informative)
Statistical methods for PT
B.1 General
B.2 Assessment of PT item homogeneity and stability
B.3 Determination of the assigned value and its uncertainty
B.4 Calculation of performance statistics
B.5 Evaluation of performance
Mahmoud Eltayeb
Case Study 4
Group Work
Each individual should be given the opportunity to participate
Mahmoud Eltayeb
53
Thank You
Mahmoud Eltayeb
54