0% found this document useful (0 votes)
15 views2 pages

3 Project Plan and Workflow

The document outlines a project plan and workflow for analyzing a dataset, which includes understanding the dataset, preprocessing data, conducting exploratory data analysis, and modeling for regression and classification. It details specific models and metrics for each task, such as RMSE and F1-score, and emphasizes model evaluation techniques. An optional step for deploying a simple UI using Streamlit for predictions is also mentioned.

Uploaded by

Bharat Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views2 pages

3 Project Plan and Workflow

The document outlines a project plan and workflow for analyzing a dataset, which includes understanding the dataset, preprocessing data, conducting exploratory data analysis, and modeling for regression and classification. It details specific models and metrics for each task, such as RMSE and F1-score, and emphasizes model evaluation techniques. An optional step for deploying a simple UI using Streamlit for predictions is also mentioned.

Uploaded by

Bharat Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

3.

Project Plan and Workflow

Step-by-Step Workflow:

1. Understand the Dataset:

- Explore structure, features, operating conditions.

2. Preprocess the Data:

- Normalize features, handle missing data.

- Create labels for RUL (regression) or failure window (classification).

3. Exploratory Data Analysis (EDA):

- Plot sensor trends over time.

- Use correlation heatmaps and distributions.

4. Modeling:

A. Regression (predict RUL)

- Models: Linear Regression, Random Forest, XGBoost, LSTM

- Metrics: RMSE, MAE

B. Classification (predict failure)

- Binary labeling (failure within 20 cycles = 1)

- Models: Logistic Regression, XGBoost

- Metrics: Precision, Recall, F1-score

5. Model Evaluation:
- Use cross-validation, learning curves, feature importance.

6. (Optional) Streamlit Deployment:

- Simple UI for file upload and prediction visualization.

You might also like