0% found this document useful (0 votes)
16 views2 pages

Se Lab 7 PDF

The Library Management System is designed to manage library functions like book issue/return and member registration. Key project metrics include an estimated 20 function points, 5,000-6,000 lines of code, a development time of 4-5 months with a team of 5, and an estimated cost of $50,000. Risk factors include system integration and user training, while quality metrics target 95% code quality and over 90% user satisfaction post-deployment.

Uploaded by

Tripti Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views2 pages

Se Lab 7 PDF

The Library Management System is designed to manage library functions like book issue/return and member registration. Key project metrics include an estimated 20 function points, 5,000-6,000 lines of code, a development time of 4-5 months with a team of 5, and an estimated cost of $50,000. Risk factors include system integration and user training, while quality metrics target 95% code quality and over 90% user satisfaction post-deployment.

Uploaded by

Tripti Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Lab 7

Yash Garg

Roll No: 2200290130194

Project Metrics for Library Management System SRS

Project Overview:

The Library Management System is a software application designed to manage library functions

such as book issue/return, member registration, and maintaining records of books available.

Estimated Project Metrics:

1. **Function Points:** Based on the number of unique functions in the system.

- Number of input screens: 5

- Number of output screens: 4

- Number of user interactions: 3

- Total Function Points: 20

2. **Lines of Code (LOC):**

- Estimated lines of code: 5,000-6,000 based on system complexity

3. **Development Time Estimate:**

- Total time required: 4-5 months (depending on the number of developers)

4. **Team Size:**

- Number of developers: 3
- Number of testers: 2

5. **Cost Estimate:**

- Estimated cost based on man-hours: Approx. $50,000 (based on average hourly rate)

6. **Risk Factors:**

- Integration of the system with existing library management systems

- User training and adaptation

7. **Quality Metrics:**

- 95% or higher code quality based on unit tests and code reviews

- 90%+ user satisfaction post-deployment

You might also like