Class Notes
Class Notes
ON
Academic Year
2023-2024
Developed By
Hiral Tankariya
&
Gautami Muliya
Prof.Raghuvir Joshi
CERTIFICATE
This is to certify that the project work entitled Hotel Management
system is a benefits work carried out by Hiral Tankariya and Gautami
Muliya in partial fulfillment of the requirement of the qualified of M.SC.
I.T.&C.A. duringthe year 2024-2025.
Director
Dr.Pareshbhai Rabari
ACKNOWLEDGEMENT
We take this opportunity to express our gratitude to our guide, prof.Raghuvir Joshi a
computer department, Project Guide for their valuable guidance and continual encourage us
throughout the project. We are heartily thankful to him for his time-to-time suggestion and
clarifying the concepts of the topic the helped us a lot during the development of the project,
for his help getting a better understanding of the project domain, solving problems
encountered during project implementation as well as project testing, and for his precious
suggestion for the project, through his experience in project development.
We special thanks to our family members for the moral support given throughout our
study, above all we offered. We heartiest regards to "GOD" for given us strength work
inspiration.
Thank You....
ABSTRACT
This system helps hotels efficiently manage their food operations,improve guest
satisfaction,reduce costs, and increase profitability.
2 System Analysis 8
2.1 Analysis of Current System
2.2 Analysis of Existing System
4 Project Management 10
4.1 Project Model
5 Feasibility Analysis 11
5.1 Technical Feasibility
5.2 Operation Feasibility
5.3 Economical Feasibility
6 System and Database Design 13
6.1 Database Diagram
6.2 Dataflow Diagram
7 Screenshots 17
9 Testing 32
10 Project Conclusion 33
11 References 34
Project Profile
4-GB OF RAM
1. Introduction
We are making An Application which title is “Yummy in the Tummy”. We made this
for the “Hotel Management System”
This Application is developed by: “Hiral Tankariya & Gautami Muliya.,” in this
Application.
Yummy in the Tummy delight your guests with impeccable service and
unforgettable dining experiences,ensuring their satisfaction from check-in to check-out.
1.2 Purpose
We are making this Website to save the stationary and rapid work of searching any kind
of data about the People. Using these Website users can save the stationary, paperwork and
time also. User has no tension to remember the paper and other documents because all kind
of documents are stored in the website.
Using this website can also solve the problem of searching data. If any person wants to
get information about any People, the user can input the name and all kind of information
about that People records are show in the table format in the data grid view.
The reservation system has three modules. First module helps the customer to enquire
the availability of places in a particular table at particular date, the second module helps him to
reserve a table and with the third module he can cancel a reserved table. The current online
bookig Hotel management system is the easiest way to every people.
2. System Analysis
First of all we take a visit of the Agency. And visit the Manager of the Yummy in the
Tummy. He gave the information about the Management and different Types of work that has
been doing in
In that time mostly all the persons show all the things in Website.
Because in that modern time all the things are available in Website so no need to purchase it
from market
Category Hardware
RAM 4 GB(Minimum)
Software Requirements:-
4 Back-End : SQLite
4. Project Management
4.1 Project Model
Software architecture
Design
Software
Implementation
Verification
Maintenance
5. Feasibility Analysis
Feasibility of the project determines whether it is possible to develop the project or not. There
are 3 main factors, which determine the feasibility of the project. They are discussed as
follow:-
Technical Feasibility
Economical Feasibility
Operational Feasibility
The technical feasibility takes into consideration the technical requirement and their
availability in the market. It determines whether it is possible to develop the proposed system
with the present technology or not. The technical possibilities of present system are as
follows:-
The operational feasibility deals with the matter whether the proposed system fulfils the
requirement of the firm. This feasibility determines whether the proposed system covers all the
aspect of the current system. The possibility of the operational feasibility is as follows:-
Regestration
Booking Registration
Represent a Form
M
o Represent a Processing
n
a
r
c
h
S
a
n
k
u
Developed by : Hiral Tankariya
l & Gautami Muliya Page: 14
Hotel Management System
Home Home
Yummy in M
The Tummy j
u
u
i
n
a
r
c
h
Logout
S
a
n
k
u
l
7. Screenshot
Menu
Registration
Booked Orders
Table Booking
Advantage Of Project
Our system can work fast than manual.
Our website can provide facility add , update and delete.
Our website can maintain & store the Food & client details.
Un-Authorized person can't access website.
Limitation Of Project
The Mobile Phone need Android Version.
Speed depends on the Mobile RAM or processor.
Server can be overloaded.
Any client without Registration can't access Client Panel.
9. Testing
Black Box-Testing:-
Black box testing assumes the code to be a black box that resourced to input Stimuli.
The testing focuses on the output to various of types of stimuli in The targeted deployment
environments. It focuses on validation tests, boundary ,condition, destructive testing ,
reproducibility tests, performance tests, globalization, And security-related testing.
Requirements
Functional specification
High-level design document
Application block source code
White Box-Testing:-
White box testing assumes that the tester can take a look at the code for the
application block and create test cases that look for any potential failure scenarios. During
white box testing, you analyze the code of the application block and prepare test cases for
Developed by : Hiral Tankariya & Gautami Muliya Page: 20
Hotel Management System
testing the functionality to ensure that the class is behaving in accordance with the
specifications and testing for robustness
10. Conclusion
The new system has been developed with a graphical user interface that is simple for use and is
therefore going to simplify the entire booking process. Despite a few challenges in the implementation
process, the process was a successful one as I was able to come up with a system that did not only work
but also got acceptance form users.
Taking this project all through has been a wonderful experience for me and for the practical knowledge
that I acquired, this would not have materialized. This is a very important part of my course and has helped me
understand the concepts behind a number of web scripting languages as well as familiarize with the market
expectations of the course at large.
11. Reference
A. Website Name:-
1. www.google.com
B. Reference :-