Power System Operation and Control - EE3602 - Important Questions
Power System Operation and Control - EE3602 - Important Questions
Professional English – I
2nd Semester 3rd Semester
Matrices and Calculus
Probability and Complex
Professional English - II Functions
Engineering Physics
Statistics and Numerical Electromagnetic Fields
Engineering Chemistry Methods
Problem Solving and Physics for Electrical Digital Logic Circuits
Python Programming Engineering
Electron Devices and
Physics and Chemistry Basic Civil and Mechanical Circuits
Laboratory Engineering
Electrical Machines - I
Engineering Graphics
C Programming and Data
4th Semester Electric Circuit Analysis Structures
Environmental Sciences
and Sustainability 6th Semester
Transmission and 5th Semester
Distribution Protection and
Linear Integrated Power System Analysis Switchgear
Circuits
Power Electronics Power System
Measurements and Operation and Control
Instrumentation Control Systems
Open Elective – I
Microprocessor and
Microcontroller Professional Elective I
Professional Elective IV
Electrical Machines - II Professional Elective II
Professional Elective V
Professional Elective III
7th Semester Professional Elective VI
High Voltage Mandatory Course-I& Mandatory Course-
Engineering II& MC
Human Values and 8th Semester
Ethics
Elective –
Management Project Work /
Internship
Open Elective – II
Open Elective – III
Open Elective – IV
Professional Elective
VII Click on Clouds to navigate other department
https://www.poriyaan.in/
www.Poriyaan.in
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 1
www.Poriyaan.in
PART-B
CO1
(i) Explain role of NLDC & RLDC in power system (6)
2 2 Understand
(ii) List out the current power scenario in India (7) CO1
Draw the load curve and load duration curve. Also explain the
CO1
8 importance of these curves in connection with economic 2 Understand
operation of power system (13)
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 2
www.Poriyaan.in
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 3
www.Poriyaan.in
20-24hrs=5000kw;
Sketch load duration curve and formulate load factor and plant
capacity factor, if the capacity of plant is 12Mw. (15)
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 4
www.Poriyaan.in
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 5
www.Poriyaan.in
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 6
www.Poriyaan.in
Inertia constant 3% 4%
Generator gain constant 50Hz/pu MW 40
Governor time constant 0.3 0.2
Turbine time constant 0.6 0.4
14
Explain with neat block diagram tie line with frequency CO2
K6 Create
bias control of two area system (13)
PART-C
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 7
www.Poriyaan.in
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 8
www.Poriyaan.in
3 State the main objectives of Reactive power and Voltage CO3 K4 Analyze
control in power systems
4 Outline the role of synchronous generators adopted generating CO3 K1 Remember
and absorption of reactive power
CO3 K6 Create
5 Formulate the need of reactive power control in electrical
power transmission lines?
Distinguish between load compensation and system CO3 K2 Understand
6
compensation.
7 Point out the formula for surge impedance of transmission CO3 K4 Analyze
system.
8 Summarize the methods used for compensating the CO3 K2 Understand
uncompensated transmission lines?
9 State reactive power generation. CO3 K2 Understand
16 Analyze the methods to improve the voltage profile in the CO3 K4 Analyze
power system.
17 Distinguish between ON load tap changing transformer and CO3 K4 Analyze
OFF load tap changing transformer.
18 Summarize the SVC slope in the dynamic characteristics? CO3 K5 Evaluate
19 Invent importance of V-I characteristics of STATCOM? CO3 K5 Evaluate
20 Develop the V-I characteristics of the SVC. CO3 K6 Create
PART-B
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 9
www.Poriyaan.in
Examine various methods of voltage control and explain any CO3
1 three in detail . (13) K1
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 10
www.Poriyaan.in
(i). A three phase overhead line has resistance and reactance
per phase of 5Ω and 25 Ω, respectively. The load at the
receiving-end is 15 MW, 33kV,0.8 p.f. lagging. Find the
capacity of the compensation equipment needed to deliver this CO3
14 K6 Create
load with a sending-end voltage of 33 kV. (8)
(ii) Discuss the generation and absorption of reactive power.
(5)
PART-C
1. Explain the operation of tap changing transformer and discuss CO3 Evaluate
K5
its application. (15)
2. Develop the block diagram of AVR and obtain its transfer CO3
K6 Create
function and explain the static and dynamic response. (15)
3. The load at the receiving end of a 3 phase OHL is 25 MW at
0.8 p.f lag at a line voltage of 33kv.the line has a resistance 5
ohm per phase and an inductive reactance at 20 ohm per phase
.calculate the sending end voltage. A synchronous compensator
connected at the receiving end and the voltage at both end of Evaluate
the line is maintained at 33kv.calculate CO3
K5
(i)the MVAR of the compensator
(ii)transmission losses and efficiency with and without
compensator and
(iii)the maximum load that can be transmitted with the
compensator. (15)
4. Find the rating of synchronous compensator connected to the
tertiary winding of 60kV star connected,33kV star
connected,11kV delta connected three winding transformer
to supply a load of 60MW at 0.8p.f lagging at 33kV across
the secondary. Equivalent primary and tertiary winding CO3
K6 Create
reactances are 18Ω and 0.12Ω respectively. While the
secondary winding reactance is negligible. Assume that V1 is
66kV and maximum off nominal setting between transformer
primary and secondary is 1:1.1 (15)
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 11
www.Poriyaan.in
2 Show the condition for the optimal power dispatch in lossless K-3 Apply
CO4
system.
3 Prepare the incremental fuel cost curve CO4 K-1 Remember
4 Define spinning reserve? CO4 K-1 Remember
12 Express co-ordination equation taking losses into account. CO4 K-2 Understand
13 Define crew constraints. CO4 K-3 Apply
14 Differentiate unit commitment and Economic load dispatch CO4 K-2 Understand
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 12
www.Poriyaan.in
PART-B
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 13
www.Poriyaan.in
Explain the mathematical formulation of long-term hydro-thermal
6 scheduling. (13) CO4 K-2 Understand
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 14
www.Poriyaan.in
(13)
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 15
www.Poriyaan.in
In a power system having two units, the loss co- efficient are
B11= 0.0015 MW-1, B12= -0.0006 MW-1,
B21= -0.0006 MW-1, B22= 0.0024 MW-1
The incremental production cost of the units are
df1/dpg1 = 0.08 pg1. + 20 Rs/ MWhr K-5 Evaluate
14 CO4
df2/dpg2 = 0.O9 pg2+16 Rs/ MWhr
Find the generation schedule for X = 18 and 22.
find also the change in transmission losses between the two
schedules. (13)
PART-C
A two-plant system having a steam plant near the load center and
a hydro-plant at a remote location is shown in figure. The load is
500 MW for 16 hr a day and 350–MW, for 8 hr a day. The
characteristics of the units are
C1 = 120 + 45 PGT + 0.075 P2GT
w2 = 0.6 PGH + 0.00283 P2GH m3/s
3 Loss coefficient, B22 = 0.001 MW−1 Find the generation schedule,
CO4 K-5 Evaluate
daily water used by the hydro-plant, and daily operating cost of
the thermal plant for γj = 85.5 Rs./m3-hr. (15)
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 16
www.Poriyaan.in
UNIT V -COMPUTER CONTROL OF POWER SYSTEMS
Need of computer control of power systems-concept of energy control centers and functions – PMU - system
monitoring, data acquisition and controls - System hardware configurations - SCADA and EMS functions
- state estimation problem – measurements and errors - weighted least square estimation - various
operating states - state transition diagram.
PART - A
Q.No Questions Course BT Competence
Outco Level
1 me
What are the advantages of computer control CO5 K-1 Remember
2 Define state estimation. CO5 K-2 Understand
3 Define restorative state. CO5 K-1 Remember
4 Quote any two functions of Load Dispatch Centre. CO5 K-2 Understand
5 What is meant by PMU CO5 K-1 Remember
6 List the different operating states in power system. CO5 K-1 Remember
7 Distinguish between reliability and security of power CO5
K-1 Remember
system.
8 Explain the EMS functions? CO5 K-2 Understand
9 K-4 Analyze
Mention four types of SCADA system and its application area CO5
16 K-5 Evaluate
What are the applications of state estimation CO5
17 K-3 Apply
Explain the hierarchical levels used in EMS. CO5
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 17
www.Poriyaan.in
Explain in detail phasor measurement unit in computer
control of power system (13) K-5 Evaluate
3 CO5
Explain the security monitoring using state estimation with K-1 Remember
4 necessary diagrams . (13) CO5
Illustrate the various functions of energy control centre. (13) K-2 Understand
7 CO5
Explain the need of computer control of power system (13) K-2 Understand
8 CO5
Infer short notes on energy control centre EMS and its K-5 Evaluate
9 functions. (13) CO5
Explain the power system security and control with neat flow K-3 Apply
10 chart. (13) CO5
Explain in detail the state estimation of power system using K-4 Analyze
13 WLSE method (13) CO5
PART-C
1 Discuss briefly how the system states are continuously CO5 BTL 4 Analyze
monitored and controlled. (15)
2 Write short notes on state estimation? Explain the help of flow CO5 BTL 6 create
chart the weighted least square estimation. (15)
Explain in detail, the system hardware employed to control CO5 BTL 5 Evaluate
3
the power system operation. (15)
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 18
www.Poriyaan.in
4 BTL 6 Create
https://play.google.com/store/apps/details?id=com.poriyaan.poriyaan 19
1st Semester Anna University EEE- Reg 2021
Professional English – I
2nd Semester 3rd Semester
Matrices and Calculus
Probability and Complex
Professional English - II Functions
Engineering Physics
Statistics and Numerical Electromagnetic Fields
Engineering Chemistry Methods
Problem Solving and Physics for Electrical Digital Logic Circuits
Python Programming Engineering
Electron Devices and
Physics and Chemistry Basic Civil and Mechanical Circuits
Laboratory Engineering
Electrical Machines - I
Engineering Graphics
C Programming and Data
4th Semester Electric Circuit Analysis Structures
Environmental Sciences
and Sustainability 6th Semester
Transmission and 5th Semester
Distribution Protection and
Linear Integrated Power System Analysis Switchgear
Circuits
Power Electronics Power System
Measurements and Operation and Control
Instrumentation Control Systems
Open Elective – I
Microprocessor and
Microcontroller Professional Elective I
Professional Elective IV
Electrical Machines - II Professional Elective II
Professional Elective V
Professional Elective III
7th Semester Professional Elective VI
High Voltage Mandatory Course-I& Mandatory Course-
Engineering II& MC
Human Values and 8th Semester
Ethics
Elective –
Management Project Work /
Internship
Open Elective – II
Open Elective – III
Open Elective – IV
Professional Elective
VII Click on Clouds to navigate other department
https://www.poriyaan.in/