Question - Answer Preparation For LSSYBGB
Question - Answer Preparation For LSSYBGB
a. B
b. B&C
c. C
d. A
35. Cause and Effect diagram is also called as
a. Fish Bone Diagram
b. Ishikawa Diagram
c. Both a & b
d. None of the above
36. What are the two different types of Data?
a. Variable & Attribute
b. Variable & valid
c. Valid & Attribute
d. None of the above
37. A Histogram has a disadvantages that the time change of data and individual data aspects
difficult to represent.
a. True
b. False
c. May be
Question /Answer Preparation for
LEAN SIX SIGMA –GREEN BELT
Vendor- ASIAN GROUP
Suggest by – Business BEE
40. The type of check sheet shown in the picture is d. Control Charts
47. The control chart below needs investigation because
52. Based on the capability analysis and chart above, we should primarily work to improve the
A. Average
B. Variation
C. Nothing needs improvement
53. The components of Gage R&R are repeatability and reproducibility
A. True
a. Normal B. False
b. Plateau
54. Variation in measurements made by different appraisers using the same gage on the same item
c. Comb Type
is:
d. Bimodal
A. Gage Repeatability
B. Gage Reproducibility
50. Which tool is used in Root cause analysis? C. Gage Linearity
a. Check Sheet
b. Pareto Chart D. Gage Bias
c. Stratification
d. Cause- Effect Diagram
Question /Answer Preparation for
LEAN SIX SIGMA –GREEN BELT
Vendor- ASIAN GROUP
Suggest by – Business BEE
Dia
12
Sample
1
met UC
L=11.
Mean
1 er 749
_
X=
19 9.8
0 35
LC
8 1 4 7 1013 16 19222528 L=7.
Sa 922
1 1 mpl UC
3 e L=3.
367
_
S=1
2
Sample
.96
StDev
1
2
LC
1 4 7 1013 16 19222528 L=0.
Sa 557
mpl
e
56. We have diameter data above that is continuous and normally distributed. We have
collected 10 data points every hour for 30 hours. The best chart for this data is:
A. I & MR
B. X-Bar & R
C. X-Bar & S
D. P-Chart
58. The team is looking at scrap costs to establish a baseline. The data is not sub-grouped.
Which type of chart would be best for this data?
A. I & MR
B. X-bar & R
C. P Chart
D. U Chart
59. A team has analyzed their new product and created an FMEA. A potential failure mode for the
first function has a severity of 5, occurrence of 5, and detection of 5. What is the RPN for
that failure mode?
A. 15
B. 125
C. None of the above
D. Cannot be determined from this information
60. Our team is analyzing an FMEA and has identified an effect with a detection of 9. This means
the effect is:
A. Very easy to detect
B. Very difficult to detect
C. Cannot be determined
61. Consider this scenario for the next three questions. In our project, we are considering two
manufacturing processes and want to compare the average performance of two machines. The data