BOQ1

The document outlines the contract details for a proposed two-storey residential building in Babatngon, Leyte, including a bill of quantities for general requirements, earthworks, and civil works. The total cost for Part I of the project is Php 989,680.91, detailing various pay items and their respective amounts. Key components include mobilization, excavation, sewer line works, and plumbing fixtures.

Uploaded by

Ariel Bacho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

BOQ1

The document outlines the contract details for a proposed two-storey residential building in Babatngon, Leyte, including a bill of quantities for general requirements, earthworks, and civil works. The total cost for Part I of the project is Php 989,680.91, detailing various pay items and their respective amounts. Key components include mobilization, excavation, sewer line works, and plumbing fixtures.

Uploaded by

Ariel Bacho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Contract ID: 2025-20-5-28-29

Contract Name: Proposed Two(2) Storey Residential Building


Location of Contract: Poblacion 1 Babatngon, Leyte

BILL OF QUANTITIES
PART I: GENERAL REQUIREMENTS, EARTHWORKS, AND CIVIL
WORKS

Pay Item Unit Price Amount


Descriptions Unit Quantity
No. (Pesos) (Pesos)
A. GENERAL REQUIREMENTS
B.5 Project Billboard/Signboard each 1 5,392.31 5,392.31
Mobilization/
B.9 l.s. 1 132,357.51 132,357.51
Demobilization
B.20 Temporary Fence l.s. 1 70,037.50 70,037.50
B. EARTHWORKS
Structure Excavation
803(1)a cu.m. 90 230.12 20,710.8
(Common Soil)
Clearing and Grubbing
804(1)a ha. 0.0337 16,2281.00 5468.87
804(1)b Embankment from Borrow cu.m. 30 226.28 6,788.4
804(4) Gravel Fill cu.m. 61.22 1,144.03 70,037.52
C. OTHER CIVIL WORKS
1001(8) Sewer Line Works l.s. 1 85,214.00 85,214.00
Storm Drainage &
1001(9) l.s. 1 167,349.00 167,349.00
Downspout
1001(5)b Catch Basin (CHB) ea 16 12,671.00 202,736.00
1001(11) Septic Vault Concrete/CHB l.s. 1 31,020.00 31,020.00
1002(27) Plumbing Works l.s. 1 120,179.00 120,179.00
1002(4) Plumbing Fixtures l.s. 1 72,390.00 72,390.00
PART I TOTAL COST, Php 989,680.91