Job Sequencing With Deadlineer
Job Sequencing With Deadlineer
The greedy approach of the job scheduling algorithm states that, “Given ‘n’ number of jobs with a
starting time and ending time, they need to be scheduled in such a way that maximum profit is received
within the maximum deadline”.
Algorithm
Step1 − Find the maximum deadline value from the input set
of jobs.
Step2 − Once, the deadline is decided, arrange the jobs
in descending order of their profits.
Step3 − Selects the jobs with highest profits, their time
periods not exceeding the maximum deadline.
Step4 − The selected set of jobs are the output.
Examples
Consider the following tasks with their deadlines and profits. Schedule the tasks in such a way that they
produce maximum profit after being executed −
S. No. 1 2 3 4 5
Jobs J1 J2 J3 J4 J5
Deadlines 2 2 1 3 4
Profits 20 60 40 100 80
Step 1
Find the maximum deadline value, dm, from the deadlines given.
dm = 4.
Page 2 of 4
Step 2
S. No. 1 2 3 4 5
Jobs J4 J5 J2 J3 J1
Deadlines 3 4 2 1 2
Profits 100 80 60 40 20
The maximum deadline, dm, is 4. Therefore, all the tasks must end before 4.
Choose the job with highest profit, J4. It takes up 3 parts of the maximum deadline.
Step 3
The next job with highest profit is J5. But the time taken by J5 is 4, which exceeds the deadline by 3.
Therefore, it cannot be added to the output set.
Step 4
The next job with highest profit is J2. The time taken by J5 is 2, which also exceeds the deadline by 1.
Therefore, it cannot be added to the output set.
Step 5
The next job with higher profit is J3. The time taken by J3 is 1, which does not exceed the given
deadline. Therefore, J3 is added to the output set.
Step 6
Since, the maximum deadline is met, the algorithm comes to an end. The output set of jobs scheduled
within the deadline are {J4, J3} with the maximum profit of 140.
Example
Following is the final implementation of Job sequencing Algorithm using Greedy Approach −
Open Compiler
#include <stdbool.h>
#include <stdio.h>
#include <stdlib.h>
Output
Following is maximum profit sequence of Jobs:
cad