Software: “It is defined as an organized set of instructions to deliver a desired output by considering
various processes and functions.”
Now-a-days software acts both as product (Application Software) and vehicle for delivering a product
(System Software).
As product, software delivers computing potential embodied by computer hardware (or) by a network of
computers that are accessible by local hardware.
As the vehicle used to deliver product, software acts as basis for control of PC (OS), Communication of
information (Networks) and Creation and Control of other programs (Software Tools, Environments).
Software Development: “It is a creative activity, where a software system is developed from initial concept
through a working system”.
Software Maintenance: “Process of changing a developed system once it is delivered”.
Software Evolution: “Evolutionary process where software is conceptually changed over its lifetime in
response to the changing requirements”.
Software Characteristics:
1. Software is developed (or) engineered, it is not manufactured.
2. Software doesn’t “wear out”. Sometimes, it may deteriorate with too many changes.
3. Most of softwares continue to be custom build, component-based assembly. [As software is both product
and vehicle to carry product].
1
A GENERIC VIEW OF PROCESS
Software Engineering-A Layered Technology: According to IEEE, “Software Engineering is the
application of a systematic, disciplined, quantifiable approach to the development, operation and maintenance
of software i.e., application of engineering to software.
Software engineering is a layered technology. The foundation for software engineering is the process
layer. The software engineering process is the glue that holds the technology layers together and enables
timely development of software. Process defines a framework that must be established for effective delivery
of software engineering technology. The software process forms the basis for management control of software
projects and establishes the context in which technical methods are applied, work products (models,
documents, data, reports, forms, etc.) are produced, milestones are established, quality is ensured, and change
is properly managed.
Software engineering methods provide the technical how-to’s for building software. Methods
encompass a broad array of tasks that include communication, requirements analysis, design modeling,
program construction, testing, and support.
Software engineering tools provide automated or semi automated support for process and the methods.
When tools are integrated so that information created by one tool can be used by another, a system for the
support of software development, called Computer Aided Software Engineering (CASE), is established.
A Process Framework: “It establishes a foundation for complete software process by identifying a small
number of framework activities and umbrella activities that are applicable to all software projects.”
Each framework activity is populated by a set of Software Engineering actions (Ex: Design) – collection
of related tasks.
Each action is populated with individual work tasks.
Software is determinate if order and timing of inputs, processing and outputs is predictable, otherwise it is
referred an indeterminate.
Framework Activities:
1. Communication: It involves heavy communication and collaboration with customer and other
stakeholders. It encompasses requirements gathering and related activities.
2. Planning: It plans for Software Engineering work that follows. It describes technical tasks to be
conducted, resources that will be required, likely risks, work products to be produced and a work schedule.
3. Modeling: This activity focuses on creation of models that allow stakeholders (customer, developer) to
better under software requirements and design that will achieve requirements.
2
4. Construction or Development: It combines code generation and testing to uncover errors in the code.
(Manual, automated actions).
5. Deployment: The software (completed/partial increment) is delivered to the customer for evaluation and
feedback of it.
Umbrella Activities:
1. Software Project Tracking and Control – Assess progress against the project plan and maintain schedule.
2. Risk Management – Assesses risk that effect project outcome (or) Quality of product.
3. Software Quality Assurance – Activities to ensure software quality.
4. Formal Technical Reviews - Assess work products to uncover and remove errors before next action.
5. Software Configuration Management – Manages effects of changes throughout the software process.
6. Measurement – Defines and collects process, project, product measures to meet customer requirements.
7. Reusability Management – Defines criteria for work product reuse and establishes mechanisms to
achieve reusable components.
8. Work Product Preparation and Production – Focuses on activities required to create work product such
as models, documents, logs, forms and lists.
3
Product and Process: If process is weak, the end products will undoubtedly suffer. But an obsessive
over- reliance on process is also dangerous.
Process Technology: “Process Technology tools are used to help software organizations to analyze their
current process, organize work tasks, controls and monitor progress, manage technical quality”.
Process Assessment: It is required to ensure that the process meets set of basic principles that are needed
for a successful software engineering.
Approaches:
CMM-Based Appraisal for Internal Process Improvement (CBA IPI): It provides a diagnostic
technique for assessing the relative maturity of a software organization; uses the SEI CMM as the basis
for the assessment
SPICE: Software Process Improvement and Capability dEtermination.
SCAMPI: Standard CMMI Assessment Method for Process Improvement. It provides a five step process
assessment model that includes: Initiating, Diagnosing, Establishing, Acting, and Learning.
ISO 9001:2000 for software: Generic standard to improve the overall quality of products, system and
services of software organization. It adopted a plan-do-check-act cycle for continuous process
improvement
CMMI
Capability Maturity Model Integration is a maturity model used to rank software development
organizations. It is proposed by Software Engineering Institute (SEI). It represents process model as
1.Continuous Model 2.Staged Model
CMM: “It is maturity framework strategy that focuses on continuously improving the development and
management of organization workforce.”
Capability Levels: The Capability levels depend on Key Process Areas (KPA). These are given as:
1. Level 0 (Incomplete): The process area (Ex; Requirement Management) is not performed or does not
achieve all goals and objectives defined by CMMI for level 1 capability.
2. Level 1 (Initial/Performed): All specific goals of process area have been satisfied. Work tasks required
to produce defined work products are being conducted.
3. Level 2 (Repeatable/Managed): All level 1 criteria have been satisfied.
All work related to PA is up-to-date with organization expectations.
All people doing work have access to adequate resources to get the job done i.e., stakeholders are
actively involved.
Work task and work products are “monitored, controlled, reviewed and evaluated”.
4. Level 3 (Defined): All level 2 criteria are achieved. “The process is tailored from organization’s set of
standard other processes and contributes work products, measures and other process improvement
information to organizational process assets”
5. Level 4 (Quantitatively managed): All level 3 criteria are satisfied. Quantitative objectives for quality
and process performance are established and used as criteria in managing the process.
6. Level 5 (Optimized): All level 4 criteria are satisfied. Process Area (PA) is adapted and optimized using
quantitative needs to meet changing customer needs and continually improve efficiency of Process Area.
4
SEI has associated key process areas (KPAs) with each of the maturity levels. KPAs describe those software
engineering functions (e.g., software project planning, requirements management) that must be present to
satisfy good practice at a particular level. Each KPA is described by identifying the following characteristics:
Goals—the overall objectives that the KPA must achieve.
Commitments—requirements (imposed on the organization) that must be met to achieve the goals or
provide proof of intent to comply with the goals.
Abilities—those things that must be in place (organizationally and technically) to enable the organization
to meet the commitments.
Activities—the specific tasks required to achieve the KPA function.
Methods for monitoring implementation—the manner in which the activities are monitored as they are put
into place.
Methods for verifying implementation—the manner in which proper practice for the KPA can be verified.
Eighteen KPAs are defined across the maturity model and mapped into different levels of process maturity.
The following KPAs should be achieved at each process maturity level:
Each of the KPAs is defined by a set of key practices that contribute to satisfying its goals. The key practices
are policies, procedures, and activities that must occur before a key process area has been fully instituted. The
SEI defines key indicators as “those key practices or components of key practices that offer the greatest
insight into whether the goals of a key process area have been achieved”.
PROCESS PATTERNS: Software process can be a collection of patterns that define a set of activities,
work tasks, work products and relational behaviors. Template to describe a process pattern contains:
Pattern Name: It should describe function within software process. (Ex: Customer-Communication).
Intent: Purpose of pattern. Can be explained with diagrams.
Type: Three types of patterns are there:
1. Task Patterns: Software Engineering action or work task that is part of process and relevant to
successful Software Engineering practice defined.
2. Stage Patterns: Defines “a framework activity with multiple work tasks in it”, for the process. Ex:
Communication contains Requirement Gathering
3. Phase Pattern: Defines “sequence of framework activities that occur with the purpose”, may be
iterative. Ex: Spiral Model
Initial Context: Condition under which pattern applies are described.
Problem: Problem to be solved by pattern is described.
Resulting Context: Conditions that result after implementation.
Related Patterns: List of process patterns that are related.
Known Uses/Examples: Instances where patterns are applicable.
6
PERSONAL AND TEAM PROCESS MODELS: These models were proposed by Watts Humpry.
Each software engineer can create a process that best fits his or her needs. A team can also create a process
that meets narrower needs of individuals and broader needs of organization.
Personal Software Process (PSP): Every developer uses some process o build the computer software. The
process may be Adhoc, may change daily and may not be efficient. PSP process model defines 5 framework
activities:
1. Planning
2. High-Level Design
3. High-Level Design Review
4. Development
5. Post-mortem.
Team Software Process (TSP): An ideal software team can be of 3-20 Software Engineers (Integrated
Product Teams). Its goal is to build a “self-directed” project team to produce high-quality software.
Objectives:
1. Build self-directed teams that plan and track their work, establish goals and own their processes and plans.
2. Show managers how to motivate their teams and sustain peak performance.
3. Accelerate software project improvement to achieve CMM level-5 targets.
4. Guide high-maturity organization to improve process standards.
Framework Activities:
1. Launch (Communication and Planning).
2. High-level Design.
3. Implementation.
4. Integration and Test.
5. Post-mortem.
Note: TSP uses scripts (sequence of Tasks), forms, and standards to guide team members.
PROCESS MODELS
PRESCRIPTIVE MODELS
Prescribes set of process elements such as framework activities, Software Engineering actions, tasks, work
products, assurance and charge control mechanism. Each process model prescribes a work flow. Various
Prescriptive models include:
1) THE WATERFALL MODEL: This model is proposed by Winston Royce. It is also called as classic life
cycle. It is the oldest paradigm (model) in Software Engineering.
It suggests a systematic, sequential approach to software development that begins with customer
specification of requirements and progresses through planning, then with Modeling, construction and
deployment.
Problems:
Real projects rarely follow the sequential flow.
It’s often difficult for customer to state all requirements explicitly.
Working version of program(s) will not be available until late in project time-span. So, customer must
have patience.
A variation in the representation of the waterfall model is called the V-model. The V-model depicts the
relationship of quality assurance actions to the actions associated with communication, modeling, and early
construction activities. As software team moves down the left side of the V, basic problem requirements are
refined into progressively more detailed and technical representations of the problem and its solution. Once
code has been generated, the team moves up the right side of the V, essentially performing a series of tests
(quality assurance actions) that validate each of the models created as the team moved down the left side. In
reality, there is no fundamental difference between the classic life cycle and the V-model. The V-model
provides a way of visualizing how verification and validation actions are applied to earlier engineering work.
9
3) RAD MODEL: RAD stands for Rapid Application Development. It is an incremental software process
model that emphasizes short development cycle. It is a version of waterfall model with rapid development.
If requirements are well understood and project scope is constrained RAD process enables development
team to create a “fully functional system” within a very short time period (60- 90 days). Each major
function can be addressed by a separate RAD team and then integrated to form a whole project.
The framework activities of RAD model include:
1. Communication: It involves heavy communication and collaboration with customer and other
stakeholders. It encompasses requirements gathering and related activities.
2. Planning: It plans for Software Engineering work that follows. It describes technical tasks to be
conducted, resources that will be required, likely risks, work products to be produced and a work schedule.
3. Modeling: This activity focuses on creation of models that allow stakeholders (customer, developer) to
better under software requirements and design that will achieve requirements.
4. Construction: It combines code generation and testing to uncover errors in the code.
5. Development: The software (completed/partial increment) is delivered to the customer for evaluation and
feedback of it.
2) THE SPIRAL MODEL: The Spiral model is proposed by “Boehm”. This model was developed to
encompass the best features of waterfall model and prototyping. It is a risk-driven process model with the
risk analysis feature.
Features:
1) Cyclic Approach for increasing system’s degree of definition and implementation while decreasing degree
of risk-Risk is considered as each revolution is made.
2) Anchor Point Milestone for ensuring stakeholders commitment to feasible and mutually satisfactory
systems solution. (Milestone is a combination of work products and conditions).
Spiral model may be viewed as a Meta model, as it can accommodate any process development model.
Software is developed as a series of evolutionary releases. Project manager adjusts planned number of
iterations to complete the software. During early iterations prototype is generated and during later iterations
complete version is developed.
11
Fig: Spiral Model
In Spiral model, the first circuit around the spiral might result in the development of a product
specification; subsequent passes around the spiral model might be used to develop a prototype and then
progressively more sophisticated versions of the software. Unlike other process models that end when
software is delivered, the spiral model can be adapted to apply throughout the life of the software.
Advantages:
It is a realistic approach to the development of large scale systems and software. (Software evolves as the
process progresses).
It uses and enables the developer to apply the prototyping approach to any stage in evolution of product.
Considers technical risks at all the stages of the project, and reduces risks before they become
problematic.
Like other paradigms, spiral model is not a panacea (Medicine).It demands considerable risk assessment
expertise for success. If a major risk is not covered and managed, problems will occur.
12
3) CONCURRENT DEVELOPMENT MODEL: It is also called as “Concurrent Engineering”. This model
is represented schematically as a series of framework activities, Software Engineering actions and tasks,
and their associated states concurrently. It strives to make all software development activities to be
concurrently implemented.
Ex: “Modeling” activity for spiral model is accomplished by invoking prototyping and/or analysis
Modeling and specification and design.
13
All activities (communication/modeling/construction etc) exist concurrently but reside in different
states. State is an externally observable mode of behavior). For example, early in a project, the
communication activity has completed its first iteration and exists in the awaiting changes state. Modeling
activity which was in none state will now move to under development state.
This model defines a series of events which will trigger transition from state to state for each of
Software Engineering activities, actions/tasks.
Advantages:
Applicable to all types of software development, provides accurate picture of current state of a project.
The software engineering activities, tasks and actions are defined as a network of activities, rather than
sequence of events.
Evolutionary Models Drawbacks:
Prototyping poses a problem to project planning because of uncertain number of cycles required to
construct product.
Do not establish maximum speed of evolution.
May not give flexibility and extensibility for the software process.
2. FORMAL METHODS MODEL: Specialized software development approach that uses mathematical
based techniques for specifying, developing and verifying the computer softwares. Formal Methods
Model helps the software developers to apply correct mathematical notations to create the issue of
insufficiency, inconsistency and uncertainty of the software by applying mathematical analysis.
During design phase, formal methods model acts as a program verifier and help Software
Engineers to detect and correct these errors, which are otherwise very difficult to be detected. This model
assures defect free software.
Drawbacks:
1. Time consuming and expensive.
2. Software Engineers need extensive training to apply this model.
3. Clients needed to be technically sound for proper communication.
Because of these reasons Formal Methods Models are used only in development of high integrity
software applications where safety and security is of atmost importance.
14
3. ASPECT-ORIENTED SOFTWARE DEVELOPMENT (AOSD): As modern computer based systems
become more sophisticated and complex, some concerns (security, fault tolerance, memory management
etc) span the entire architecture. When concern cut across multiple system functions, features and
information, they are referred as crosscutting concerns. Aspectual Requirements define those crosscutting
concerns that have impact across the software architecture.
AOSD, often referred to as Aspect-Oriented Programming (AOP), is a relatively new software
engineering paradigm which provides a process for defining, specifying, designing and constructing aspects
(crosscutting concerns).
Presently there is no distinct Aspect-Oriented Process. If such an approach is developed, then it must
integrate the characteristics of both spiral and concurrent model, because of their evolutionary and parallel
natures respectively.
THE UNIFIED PROCESS MODEL: This model is also referred as RUP (Rational Unified Process).
Unified Process refers to a methodology of extracting the most essential activities of conventional software
development phases (communication, planning, Modeling, construction and deployment) and characterizing
them, so that they can be applied in the Agile (highly valued) software development.
History: Jacobson, Rumbaugh and Greedy Booch developed the Unified Process, a framework for Object-
Oriented Software Engineering using UML. Today, Unified Process and UML are used on Object- Oriented
projects of all kinds.
The iterative, incremental model proposed by the Unified Process can and should be adapted to meet
specific project needs.
2. Elaboration Phase: The Elaboration Phase encompasses planning and Modeling activities. This phase
refines and expands preliminary use-cases that were developed in inception phase. The Elaboration Phase
expands the architectural representation to five views: 1) Use case Model, 2) Analysis Model, 3) Design Model, 4)
Implementation Model, 5) Deployment Model.
Elaboration Phase creates an “executable architectural baseline” that represents “first cut” executable
system-prototype. Architectural baseline provides viability of the project but not all features and functions
required to use the system. Modifications to the plan may be made at this time.
15
Work Products:
1) Use case Model 7) Revised Risk List
2) Supplementary Requirements 8) Project plan, includes
3) Analysis Model a) Iteration Plan
4) Software Architecture Prototype b) Adapted workflow
5) Executable Architecture Description c) Milestones
6) Preliminary Design Model d) Technical work products
9) Preliminary User Manual
3. Construction Phase: The Construction Phase is same as construction activity, where the application is
coded and tested. The Construction Phase develops suitable code for each component of the software. To
do this, analysis and design models started in the elaboration phase are completed to reflect the final
version of software increment.
4. Transition Phase: The Transition Phase encompasses latter stages of construction and first part of
deployment activities. Software is given to end-users for beta testing and user feedback about both defects
and necessary changes. Software team creates necessary support information (Ex: user manuals,
installation procedures) required for release.
5. Production Phase: In the Production Phase, on-going use of software is monitored, support for operating
environment is provided and defect reports and request for changes are submitted and evaluated.
Construction, Transition and Production phases are being conducted concurrently sometimes. So, five
Unified Process phases do not occur in a sequence.
16
AN AGILE VIEW OF PROCESS
Q: What is Agility?
Ans: Agility is dynamic, content specific, aggressively change and growth oriented. Agile software is highly
valued software. Agile team is a nimble team able to respond to changes appropriately.
The Agile Alliance defines 12 principles to achieve agility:
1. Our highest priority is to satisfy customer through early and continuous delivery of valuablesoftware.
2. Welcome changing requirements, even later in development. Agile processes harness change for
customer’s competitive advantage.
3. Deliver working software frequently, from couple of weeks to months.
4. Business people and developers must daily work together throughout the project.
5. Build projects around motivated individuals.(Give them support environment and trust to get the job
done).
6. Most efficient and effective method of conveying information in a development team is face-to face
conversation.
7. Working software is primary measure of progress.
8. Agile processes promote sustainable development. (Users, sponsors, developers should maintain a
constant pace).
9. Continuous attention to technical excellence and good design enhances agility.
10. Simplicity is essential. (Art of maximum amount of work not done).
11. Self-organizing teams are required for best architectures, requirements and designs.
12. At regular intervals, team will tune and adjust its behavior to become more effective.
17
Q: How do we create a process that can manage unpredictability?
Ans: Agile process must be adaptable, to have process adaptability. An agile software process must adapt
incrementally. Customer feedback will make the process effective. Software increments must be delivered in
short time periods, so that adaption keeps pace with change (unpredictability).
Human Factors: Agile development focuses on the talents and skills of individuals, modeling the process to
specific people and teams.
Traits that must exist among people of Agile Team:
1. Competence: It encompasses innate talent, specific software knowledge of the process which the team
applies. Skill and knowledge of process should be taught to all agile team members.
2. Common Focus: Although, Agile team members perform different tasks and bring different skills to be
project, all should be focused on one goal-to deliver a working software increment to the customer within
the time promised.
3. Collaboration: Team members must collaborate with one another, with customer and with business
managers, as Software Engineering is
1) Assessing, analysing, using information that is communicated to software team.
2) Creating information that will help customer.
3) Building information (DBs) that provides business value for customer.
4. Decision Making Ability: Agile team is given autonomy decision making authority for both technical and
project issues.
5. Fuzzy Problem-Solving Ability: Agile team will continually have to deal with ambiguity and changes.
Lesson learned any problem solving activity benefits the team later in the project.
6. Mutual Trust and Respect: Agile team should be a “Jelled” team. Jelled team exhibits the trust and
respect requirement for the project.
7. Self-Organisation: It implies 3 things:
a) Agile team organises itself for the work to be done.
b) Agile team organises the process to best accommodate its environment.
c) Agile team organises the work schedule to achieve project delivery.
Figure: XP Model.
2. Design: XP design follows KIS (Keep It Simple) principle. A simple design is always preferred over more
complex representation. XP encourages use of CRC (Class-Responsibility Collaborator) to identify and
organise object-oriented classes that are relevant to current software increment. CRC cards are only design
work produce in XP process.
If a difficult design problem of software is encountered as part of design of a story, XP
recommends the immediate creation of an operational prototype of that portion of the design, called a
Spike Solution.
XP encourages refactoring, a construction technique which can rapidly improve the design.
“Refactoring is the process of changing a software system so that it does not alter external behaviour of
code yet improves the internal structure”. With refactoring the design occurs continuously as the system is
constructed.
3. Coding: According to XP after stories are developed and design work is done, the team should not move
to coding, but develop unit tests on stories to be included in the current release. So, the developer can
focus on what must be implemented to pass the unit tested immediately.
XP recommends that two people work together at one workstation (system) to create code
for a story. This concept is known as pair programming. This helps in real-time problem solving and real-
time quality assurance. For example, one person might think about cooling details, while other ensures
coding standards are high.
19
As pair programmers complete their work, their code is integrated within the work of
others. This “Continuous Integration” helps to avoid compatibility and interfacing problem and provides a
“smoking testing/ smoke testing” environment that helps to uncover errors early.
4. Testing: The unit tests that are created should be implemented easily and repeatedly. This encourages a
Regression Testing strategy whenever code is modified.
Regression Testing is the re-execution of same subset of tests that have already been conducted to
ensure that changes have not propagated unintended side effects.
Integration and validation testing can occur on a daily basis.
XP acceptance tests, also called customer tests are specified by the customer and focus on overall
system features and functionality.
2) ADAPTIVE SOFTWARE DEVELOPMENT (ASD): This model was proposed by Jim HighSmith.
This is the best technique for building complex software and systems. ASD focus on human collaboration
and self-organization. ASD life cycle has 3 phases:
1. Speculation: Project is initiated and adaptive cycle planning is conducted. Adaptive cycle planning uses
customer is mission statement, project constraints (delivery dates etc) and basic requirements to define set
of release cycle in the project.
2. Collaboration: Motivation of people to work together in a way that multiples their talent and creative
output. Collaboration is not easy, as it is not just communication. It is a matter of trust. People working
together must trust one another to:
a. Criticize without animosity (strong dislike)
b. Assist without resentment (feeling of displeasure)
c. Work as harder as they do
d. Have the skill set to contribute to the work at hand
e. Communication problems (concerns in a way that leads to effective action).
20
3. Learning: Software development may often over estimate their own understanding and learning will help
them to improve their level of real understanding. ASD teams learn in 3 ways:
a) Focus Groups: The customer lends users provide feedback on software increments that are being
delivered. This provides direct indication of whether the product is satisfying business needs or not.
b) Formal Technical Reviews (FTRS): ASD team members review the software components that are
developed, improving quality and learning as they proceed.
c) Post-mortems: ASD team becomes introspective (self thinking) addressing its performance and
process. (With the intent of learning and then improving its approach).
4) CRYSTAL: Alistair Cockburn and Jim Highsmith created the “crystal family of agile methods”, to
achieve a software development approach that focuses on “manoeuvrability”-“a resource-limited,
cooperative game of invention and communication, with a primary goal of delivering useful, working
software and secondary goal of setting up for the next game”.
Crystal family is a set of agile processes that are effective for different types of projects.
The intent is to allow agile teams to select the member of crystal family that is most appropriate for their
software project and environment.
21
5) SCRUM: (Name derived from an activity during “RUGBY”). Developed by Jeff Sutherland and team in
early 1990’s.
Principles:
1. Small working teams are organized to “maximize communication, minimize overhead and maximize
sharing of tacit, informal knowledge”.
2. Process must be adaptable to both technical and business changes “to ensure best possible product is
produced.”
3. Process yields frequent software increments “that can be inspected, adjusted, tested, documented and
build on”.
4. Developed work and teams are partitioned “into clean low coupling packets”.
5. Constant testing and documentation is performed as the product is built.
6. Scrum process provides the “ability to declare a product ‘done’ whenever required”.
Scrum principles are used to guide development activities within a process that incorporates the framework
activities: Requirements, analysis, design, evolution and delivery. Scrum allows us to build softer software.
With each framework activity, work tasks occur within a process pattern called a Sprint.
FDD provides greater emphasis on project management guidelines and techniques than many other agile
methods. If deadline pressure is significant, it is critical to determine if software increments (features) are
properly scheduled. To accomplish this, FDD defines six milestones during design and implementation of
features: “Design walk through, Design, Design Inspection, Code, Code Inspection, and Promote to build.”
23
AGILE MODELING (AM): There are many situations in which software engineers must build large,
business critical systems. Scope and complexity of such systems must be modeled so that,
All constituencies can better understand what to be accomplished.
Problem can be effectively partitioned among Software Engineers.
Quality can be assessed at every step of system.
Agile Modeling is a practice-based methodology for effective Modeling and documentation of software-
based systems. Agile Modeling is a collection of values, principles and practices for modeling effective
software.
An Agile team must be courageous to reject any requirement, design and need to re-factor. It must have all
answers, business experts and other stakeholders should be respected and embraced.
1) Model with a Purpose: A software engineer who uses AM should have a specific goal in mind before
creating the model. Once a goal of model is identified, type of notation and level of details required will be
more obvious.
2) Use Multiple Models: Agile Modeling suggests that each model should present a different aspect of the
system and only models provide value to their developers should be used.
3) Travel Light: As Software Engineering work proceeds, keep only those models that will provide long-
term value and discard the rest. Every work product that is kept, must be maintained as changes occur. It is
required to look for best possible model from various sources.
4) Know the models and tools used to create them: Understand the tools used to create the models and
also strengths and weaknesses of each model.
5) Adapt Locality: Modeling approach should be adapted to the needs of agile team.
6) Content is more important than representation: A perfect model that imports little useful content is not
as valuable as a flawed notation with valuable content. So, focus should be on the content in model.
24