: EIS-QE-FORM-076
8D REPORT Issued No.: 001/13-01-2021
Rev No.: 002/28-12-2023
If Any -
Page 1 of 10
Doc No.: EIS-QE-FORM-076
8D REPORT Issued No.: 001/13-01-2021
Rev No.: 002/28-12-2023
Team Members
Management
Representative
Team Leader
Page 2 of 10
Doc No.: EIS-QE-FORM-076
8D REPORT Issued No.: 001/13-01-2021
Rev No.: 002/28-12-2023
(1) FOD
(2) Copper exposure(Oxidation) at SMT pads
(3) through holes covered with green mask (MIC1 location)
(4) Damage at NPTH
(5) Gold plating at NPTH location
(1) FOD (2) COPPER EXPOSE (3) MIC1 location (4) Damage at NPTH (5)Gold plating at NPTH
Page 3 of 10
Doc No.: EIS-QE-FORM-076
8D REPORT Issued No.: 001/13-01-2021
Rev No.: 002/28-12-2023
Result We have re-verified the PCBs during the final qc process. As a result, we identified and reworked the defective
PCBs, which were replaced the following day. After this process, we ended up with excess PCBs, which have been
safely stored at our facility.
Action Taken Conducted a meeting and introduced responsible departments with the issue.
Page 4 of 10
Doc No.: EIS-QE-FORM-076
8D REPORT Issued No.: 001/13-01-2021
Rev No.: 002/28-12-2023
1-Why
Page 5 of 10
Doc No.: EIS-QE-FORM-076
8D REPORT Issued No.: 001/13-01-2021
Rev No.: 002/28-12-2023
5 Why – Escape
1-Why -
1-Why
Action Taken Double-check the tenting process parameters, ENIG process parameters, including mask coverage and plating
Page 6 of 10
Doc No.: EIS-QE-FORM-076
8D REPORT Issued No.: 001/13-01-2021
Rev No.: 002/28-12-2023
Action Taken Thought process parameters need to be checked before passing the panels, we have instructed the
respected/involved departments to closely monitor the PCBs after developer to look for the tenting broken. Also
we have instructed the visual inspection team to 100% sampling for plated holes. Training will be provided to
operators.
Page 7 of 10
Doc No.: EIS-QE-FORM-076
8D REPORT Issued No.: 001/13-01-2021
Rev No.: 002/28-12-2023
Action Taken We have conducted the meeting & documented it with duly signed with the responsible departments
and instructed to follow the above mentioned actions to avoid such inconvenience in future.
Increased Inspection Frequency while photo-mech developer tenting failure, mask application as well as
at final cleaning to avoid such occurrence.
Results ACTION TAKEN FOR FUTURE LOTS
Page 8 of 10
Doc No.: EIS-QE-FORM-076
8D REPORT Issued No.: 001/13-01-2021
Rev No.: 002/28-12-2023
Page 9 of 10
Doc No.: EIS-QE-FORM-076
8D REPORT Issued No.: 001/13-01-2021
Rev No.: 002/28-12-2023
Page 10 of 10