DMR contains the conditions for the inspection stage change. Inspection stage changes occur on the basis of the
inspection results that are recorded for inspection lots and inspection characteristics (that is, on the basis of their
acceptance or rejection).
With reference to DMR condition system update the quality level, which always reflects the current status.
For dynamic modification at lot creation, the quality level is updated when an inspection lot is created. The system
assumes that the forthcoming inspection will lead to an acceptance of the inspection lot or characteristic.
An inspection lot, which is created immediately after the quality level is updated, uses the information in the updated
quality level without a usage decision having been made.
If dynamic modification is carried out at lot creation and the inspection lot is subsequently rejected, the system updates
the quality level again when the usage decision is made. The new inspection stage is used by the system to calculate the
sample sizes for the next inspection lot. Changing the quality level does not affect inspection lots that were created in the
meantime.
Example:
Process Flow
Result Recording
Usage Decision
Go to T-code QDR1
Put Radio button on "For usage decision" & then click on Next screen
Use of For Usage Decision - If you set this indicator, the system updates the quality level after the usage decision has
been made for the inspection lot.
First select all stage with Skip and then select row of Stage 1 & then click on
This indicate that suppose you valuate 2 inspection lot as Accepted (OK) then
third (next) recieved Inspection lot will be SKIP as defined in stage 2 later
Suppose you Valuate 1 inspection as Rejected (NOT OK), then next Inspection
lot will create with Stage 1 means normal Inspection lot
Note: In simple word, if Inspection lot Accepted then next lot will skip (means
there is no need to do RR. Inspection lot will post to unrestricted use.
Now click on
Now click on
Now click on
Maintain Material master with required selected views. I have shown here Quality Management view with Inspection Type
01 activate & default value.
Go to T-code QP01
Maintain Dynamic modification level at Lot level & then assign DMR D01
Rest Inspection Plan maintain as per your requirement & then save Inspection plan.
Go to T-code ME21n
Go to T-code QA32
Valuate Inspection lot as Accepted (OK) & then save after Inspection lot stock posting.
Similarly follow step IV to step V to create inspection lot & UD and Valuate Inspection lot as Accepted (OK).
Go to T-code QDL3
Then again follow step IV to step V to create next inspection lot Now you will found status of Inspection Lot as SKIP.
Notice that status of third lot is SKIP as per Dynamic Modification Rule
Check now Stock overview in MMBE for batch 000000619. You will found batch lies in Unrestricted use.
As I have valuated Inspection lot # 10000000587 as Accepted (OK), Stage of next inspection lot will be Stage 3.
You can check quality level for Inspection lot # 10000000587 same as above in T-code QDL3
Similarly follow step IV to step V to create inspection lot & UD and Valuate Inspection lot as Rejected (NOT OK).
Then system assign stage 1 as defined for stage 3 in Dynamic Modification Rule.
Now do RR & UD
Now check Quality level for Inspection Lot # 10000000588 in T-code QDL3
Go to QDL3
That means inspection of next Inspection Lot will conduct as per stage 1
Summary - Depending upon Valuation of Inspection Lot whether Accepted (OK) or Rejected (NOT OK) system propose
you whether to SKIP inspection or Tighten Inspection or Normal Inspection according to Dynamic Modification
Rule