The document outlines a Bill of Quantities (BOQ) for a construction project, detailing various activities including earthworks, concrete works, waterproofing, and finishes across multiple floors. It provides quantities, units, rates, and percentages for each activity, along with the total amounts for different construction elements such as foundations, columns, and walls. The document serves as a comprehensive guide for estimating costs and managing construction tasks.

Uploaded by

engradilshah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views12 pages

WBSActivity List

The document outlines a Bill of Quantities (BOQ) for a construction project, detailing various activities including earthworks, concrete works, waterproofing, and finishes across multiple floors. It provides quantities, units, rates, and percentages for each activity, along with the total amounts for different construction elements such as foundations, columns, and walls. The document serves as a comprehensive guide for estimating costs and managing construction tasks.

Uploaded by

engradilshah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

BOQ Ref DIV Activity Id Activity Name

Substructure
Earth Works
Excavation

Bacfilling Works
Compacted replacement
Concrete Works
Blinding Concrete

R.C Footings

Grade Beams And Water Tank Walls

Column Necks

Waterproofing
Superstructure
Ground Floor
G.F Columns

First Floor
F.F Columns

Second Floor
S.F Columns

Third Floor
T.F Columns

Roof Floor
R.F Columns
Rough Finishes
Ground Floor
First Floor
Second Floor
Third Floor
Roof Floor
Final Finishes
Ground Floor
First Floor
Second Floor
Third Floor
Roof Floor
Electrical Works
Ground Floor
First Floor
Second Floor
Third Floor
Roof Floor
Mechanical Works
Ground Floor
First Floor
Second Floor
Third Floor
Roof Floor
Firefighting Works
Ground Floor
First Floor
Second Floor
Third Floor
Roof Floor
Conveying System
All Floors
Closeout
All Floors
BOQ Description Qty Unit Rate %

Mat Foundations 715 m3 24.5 100%


Isolated Footings 470 m3 30.6 100%
Grade Beams 83 m3 36.7 100%

Compacted replacement granual material fill 1321 m3 24.5 100%

Under mat foundations, 75 mm thick 30 m3 336.6 100%


Under isolated footings, 75 mm thick 35 m3 336.6 100%
Under grade beams, 50 mm thick 7 m3 367.2 100%

Isolated Footings 175 m3 918 100%


Mat foundations 175 m3 979.2 100%

Grade Beams 73 m3 979.2 100%


Water tank walls 55 m3 1101.6 100%

Columns 250 m3 1224 10%


Cores 60 m3 1224 10%

Columns 250 m3 1224 25%


Cores 60 m3 1224 25%

Columns 250 m3 1224 20%


Cores 60 m3 1224 20%

Columns 250 m3 1224 15%


Cores 60 m3 1224 15%

Columns 250 m3 1224 15%


Cores 60 m3 1224 15%

Columns 250 m3 1224 15%


Cores 60 m3 1224 15%
Amount

34945.6
17517.5
14382
3046.1
32364.5
32364.5

24449.4
10098
11781
2570.4
332010
160650
171360
132069.6
71481.6
60588
37944
30600
7344

94860
76500
18360

75888
61200
14688

56916
45900
11016

56916
45900
11016

56916
45900
11016