0% found this document useful (0 votes)
36 views2 pages

Control Plan - Model

The document outlines a control plan for the production of a screw air purge, detailing processes, specifications, and inspection methods for various manufacturing operations. It includes information on part characteristics, measurement techniques, and responsibilities for quality control at different stages of production. The plan emphasizes compliance with customer requirements and includes a final inspection and packing process.

Uploaded by

dinesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views2 pages

Control Plan - Model

The document outlines a control plan for the production of a screw air purge, detailing processes, specifications, and inspection methods for various manufacturing operations. It includes information on part characteristics, measurement techniques, and responsibilities for quality control at different stages of production. The plan emphasizes compliance with customer requirements and includes a final inspection and packing process.

Uploaded by

dinesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CONTROL PLAN prototype Pre - Launch ✘ Production

Control Plan Number : IMP/CP/01 Key Contact : - Phone No : Date (Org) Issue no Date Rev.No Rev.Date
Core Team : 01.07.2020 0 0
Drawing Latest Change Level :

Customer Engineering Approval / Date (If Req'd)


PartNumber :

Supplier / Plant Approval / Date


Part Name: SCREW AIR PURGE Customer Quality Approval / Date (If Req'd)
(If Req'd)

Customer: MICRO FORM AUTOMATION Supplier Code : Others Approval / Date (If Req'd) Other Approval / Date (If Req'd)

Plant location :
Methods

Ballon No.
Characteristics
Part / Process Name / Sample

Class
Machine / Device,Jig,
Process Operations Program no Responsibility Reaction Plan
Tools for Manufacturing Specification Evaluation / Measurement Technique Error proofing/ Record Control Method
Number Description Product Process Size Freq.

Third Party Weigh bridge


Weight - As per Supplier Invoice Weighing scale 100% Every Lot Affex verified seal
recipt
Store - I/c
- Supplier test report / Mill TC 100% Every Lot Supplier test report Affex verified seal
As per Specification for AISI 410 (F001.
Material Grade
Rev.No.17)
Incoming ' inspection
- External lab test - Once in 3 months External lab test report Store / QC
report once in 3 months

Raw material Receiving Color code - Blue Visual 100%


10 ----- Manual Inform to supplier
& inspection

Surface finish
Free from cracks,lamination, Oxidation ,&
( Visual ) - Visual
etc
In coming inspection
Every Lot Inward Inspection Reprot Inspector - QC
report / qc verified seal
As per Sampling Plan
Diameter - ø 53.00 ± 0.30 Digital Vernier Caliper

Length - 5 Metre Measuring tap

CNC - Bandsaw machine


Set approval & Line Operator control & Cut
20 Cutting AH-250H Manual Cut piece length Cutting 35.50 ± 0.20 Digital Vernier Caliper 5 Nos & 5 No Every set up 5 Nos & Every 1Hour Operator / QC Rework / Reject
Inspection Piece chart
(V) -415

Convetional Lathe Machine


550 RPM Max Set approval & Line Operator control & Pre
30 Drilling Manual Pre hole Diameter Drilling 30.00 ± 0.2 Digital Vernier Caliper 5 Nos & 5 No Every set up 5 Nos & Every 1Hour Operator / QC Rework / Reject
4 Feet Length Inspection drill chart
8 " Chuck Diameter

Facing
Total Length 34.00 ± 0.20 Digital Vernier Caliper
( Roughing )

Outer Diameter
3 Outer diamter 45.00 + 1.00 Micrometer
( finishing )

Outer diamter Outer Diameter


15.00 minimum Digital Vernier Caliper
Length ( finishing )

Inner diameter
Bore diameter 31.70 ± 0.05 Digital Vernier Caliper
CNC Turning ( Roughing )
Chuck ɸ 210 MM Program No O00981
OD Boring bar -MTJNR -TNMG- & Shift
Set approval , Line
40
1st -Operation 5100
OD Insert -TNMG-5100
Programe
No.O00981
Chamfer
Inner diameter Chamfering
( Roughing ) 1.00 X 45 ᵒ As Per Program / DVC
/ Visual
5 Nos
1 No &1 No
Every set up 5 , Nos , Every 1/2 Hour &
Every 1 Hour
Inspection & production
Operation drawing
(As per Part
In-Charge Operator Rework / Reject &
& NC
log
ID Boring bar -SCLCR-CCMT - Line Inspectore
9030 No : BUS098 )
ID Insert -CCMT -9030
Chamfer
Outer Diameter
( Roughing ) 1.00 X 45 ᵒ As Per Program / DVC
/ Visual

For unspecifed area


Surface finish Ra Value 1.60 Ra Surface roughness tester/ comparator
finishing
Methods

Ballon No.
Characteristics
Part / Process Name / Sample

Class
Machine / Device,Jig,
Process Operations Program no Responsibility Reaction Plan
Tools for Manufacturing Specification Evaluation / Measurement Technique Error proofing/ Record Control Method
Number Description Product Process Size Freq.

1 Inner Diameter Bore finishing 32.00 + 0.03 PPG / Bore Dial Gauge

Outer Diameter
3 Outer diamter 45.00 + 1.00 Micrometer
( finishing )

CNC Turning
2 Chamfer
Inner diameter Chamfering
( finishing ) 0.25 X 45 ᵒ As Per Program / DVC
/ Visual
Program No O00982
Chuck ɸ 210 MM Shift
Every set up &
OD Boring bar -MTJNR -TNMG- Facing Micrometer Set approval In-Charge ,
4 Total Length 33.00 + 1.00 PPG 5 Nos PPG
5100 Programe No. ( finishing ) Dial Comparator Stand + Slip Gauge 5 Nos , Line Inspection Operator Rework / Reject &
50 2 nd Operation Bore Dial Gauge Every 1/2 Hour Bore Dial Gauge Operation drawing
OD Insert -TNMG-5100 O00982 1 No &1 No & NC
100 % & 100 % (As per drawing
ID Boring bar -SCLCR-CCMT - production log &
Every 1 Hour
9030
ID Insert -CCMT -9030
Chamfer
Outer Diameter
( Roughing ) 1.00 X 45 ᵒ As Per Program / DVC
/ Visual
No : BUS098)
Line Inspectore

5 Perpenticularity - 0.10 / A Lever Dial + Dial Height Gauge

For unspecifed area


Surface finish Ra Value 1.60 Ra Surface roughness tester/ comparator
finishing

* Area For Supplier


Punching Mark Identification - By Punching Manual / Machine - -
& / Marking Final Inspectore Rework / Reject &
60 3 rd Operation laser marking - 100% Every lot Limit sample Limit sample
QA In-Charge NC
LM20
175 X 175 X 300
- -

Rework / Reject &


70 Deburring and cleaning Deburring tools and Airgun - Deburring tools and Airgun Manual - - 100% Every lot Limit sample Limit sample Store - I/c
NC

Rust preventive oil and


Oiling and storage Rust preventive oil and Racks Rework / Reject &
80 - Racks Manual - - Nil Nil Nil - Nil
(If Req'd) (If Req'd) NC
(If Req'd)

Customer drawing No=


QA Rework / Reject
90 Final Inspection As per Customer Sampling Plan - WI/PET/INS/03 & B2B PLAN Every Lot Final Inspection Report BUS098
Inspector & NC
( BUS-14 ) Rev.01

100 Packing & Despatch Plastic tray Qty / Weight Packing Asper Packing Standard STE Manual counting 100% Every lot Invoice / DC Packing standard Despatch I/c Re packing

Summary of Reviews

Prepared by Approved by

Sl.No Review.no Review date Remarks Review details Reviewed By

You might also like