This document is a second preboard examination set for engineering students covering topics such as applied mathematics, surveying, transportation engineering, and construction management. It contains multiple-choice questions that require students to select the correct answer based on various engineering scenarios and calculations. The exam is structured to assess knowledge and problem-solving skills in engineering principles.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
794 views10 pages

EERC MSTC Preboard 2 Set A

This document is a second preboard examination set for engineering students covering topics such as applied mathematics, surveying, transportation engineering, and construction management. It contains multiple-choice questions that require students to select the correct answer based on various engineering scenarios and calculations. The exam is structured to assess knowledge and problem-solving skills in engineering principles.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

ENGINEERS ESPLANA, REALUYO, AND CO.

REVIEW AND LEARNING CENTER


MANILA – BAGUIO – LEGAZPI - ONLINE
Second Preboard Examination
SET A

APPLIED MATHEMATICS, SURVEYING, PRINCIPLES OF TRANSPORTATION AND HIGHWAY


ENGINEERING, CONSTRUCTION MANAGEMENT AND METHODS
INSTRUCTIONS: Select the correct answer for each of the following questions. Mark only one answer
for each item by shading the box corresponding to the letter of your choice on the answer provided.
STRICTLY NO ERASURES ARE ALLOWED.
MULTIPLE CHOICE
1. A painter needs to find the area of the gable end of a house. What is the area of the gable if it
is a triangle with two sides of 42 ft that meet at a 105˚ angle?
A. 822 ft2 C. 825 ft2
B. 855 ft 2 D. 852 ft2
2. On what day of the week can the first day of a century fall? (The first day of the twentieth
century was Jan. 1, 1901)?
A. Monday C. Sunday
B. Tuesday D. Wednesday
3. On a Richter scale, the magnitude R of an earthquake of intensity I is given R = log(I/Io),
where Io is a certain minimum intensity. If intensity of an earthquake is 1000Io, find R.
A. 3 C. 5
B. 7 D. 9
4. A crawler tractor weighing 80,000 lb (36 t) is towing a rubber-tired scraper weighing 100,000
lb (45.5 t) up a grade of 4%. What is the total resistance (kg) of the combination if the rolling
resistance factor is 100 lb/ton (50 kg/t)?
A. 5,335 kg C. 5,535 kg
B. 5,533 kg D. 5,353 kg
5. The number of accidents for 6 years recorded in a certain section of a highway is 5,432. If the
average daily traffic is 476, what is the accident rate per million entering vehicles?
A. 5,211 C. 5,002
B. 5,106 D. 5,010
6. Calculate the volume of plastic concrete that will be produced by the mix design given in the
table:

A. 0.61 m3 C. 0.71 m3
B. 0.51 m3 D. 0.81 m3
7. It occurs as concrete hardens, being greater in wet mixes. Curing helps to limit effects and
therefore concrete in the actual structure should be thoroughly and continuously moisture
for some considerable period after placing.
A. Moisture Content C. Concrete
B. Shrinkage D. Compaction
8. A lighthouse shows successive one-second flashes or red, white, green, green, white, red. A
second lighthouse does the same only with two-second flashes. The six-second sequence of
the first lighthouse is repeated steadily, as it the twelve-second sequence of the other
lighthouse. What fraction of the time do the two lights show the same color if the given
sequences start at the same time?
A. 1/5 C. ¼
B. 1/3 D. 1/6
9. A gallon of latex paint can cover 400 square feet. How many gallon containers of paint should
be bought to paint two coats on each wall of a rectangular room whose dimensions are 14 feet
by 18 feet? (Assume 8-foot ceilings)
1 Engr. Cedrixe M. Madrid, SO2
ENGINEERS ESPLANA, REALUYO, AND CO. REVIEW AND LEARNING CENTER
MANILA – BAGUIO – LEGAZPI - ONLINE
Second Preboard Examination
SET A

A. 2.65 C. 1.28
B. 2.56 D. 1.82
10. Write the equations for each of the circular arches in the figure, taking the axes shown. Solve
simultaneously to get the point of intersection P, and compute the height h of the column.

A. 6.49 m C. 4.49 m
B. 8.49 m D. 2.49 m
11. A toll plaza at the entrance to the NLEX consists of 3 booths each of which can handle an
average of one vehicle every 6 sec. The peak traffic of a toll booth is recorded as follows from
7:00 AM to 8:00 AM. Using a queuing diagram, determine the total delay.

Time Period 10 min. Volume Cumulative Volume


7:00 – 7:10 200 200
7:10 – 7:20 400 600
7:20 – 7:30 500 1100
7:30 – 7:40 250 1350
7:40 – 7:50 200 1550
7:50 – 8:00 150 1700

A. 7000 veh-min C. 6000 veh-min


B. 8000 veh-min D. 5000 veh-min
12. Concrete is made by mixing sand and pebbles with water and cement and then hardening
through hydration. Different densities result from different proportions of the aggregates.
Assume that concrete densities are normally distributed with mean 2317 kilograms per cubic
meter and standard deviation 128 kilograms per cubic meter. What is the probability that a
given concrete density is over 2400 kg/m3?
A. 0.528 C. 0.285
B. 0.582 D. 0.258
13. A machine has a first cost of Php200,000 with a scrap value of Php25,000 at the end of its
economic life of 10 years. Find its book value after 8 years using the Double Declining Balance
Method.
A. Php 52,428.80 C. Php 37,892.91
B. Php 33,554.43 D. Php 57,434.92
14. What is the stiffness factor of a pavement if its modulus of elasticity is 180 MPa and whose
subgrade modulus of 40 MPa.
A. 1.651 C. 1.615
B. 0.606 D. 0.660
15. A computer company determines that its profit equation (in millions of dollars) is given by P
= x3 – 48x2 + 720x – 1000, where x is the number of thousands of units of software sold and
0 ≤ x ≤ 40. Optimize the manufacturer’s profit.
A. $12 Billion C. $17 Billion
B. $15 Billion D. $19 Billion
16. With some sharp reasoning, you ought to be able to determine the last member of the
sequence for which the first 20 members are: 11, 31, 71, 91, 32, 92, 13, 73, 14, 34, 74, 35, 95,
16, 76, 17, 37, 97, 38, 98, ___?
2 Engr. Cedrixe M. Madrid, SO2
ENGINEERS ESPLANA, REALUYO, AND CO. REVIEW AND LEARNING CENTER
MANILA – BAGUIO – LEGAZPI - ONLINE
Second Preboard Examination
SET A

A. 78 C. 77
B. 79 D. 76
17. A ball is thrown horizontally from the roof of a building 45.0 m tall and lands 24.0 m from the
base. What was the ball’s initial speed?
A. 7.29 m/s C. 7.99 m/s
B. 7.22 m/s D. 7.92 m/s
18. A certain number of playing cards – some spades, some hearts, some diamonds, and some
clubs – are laid on a table face down. Suppose when a card is picked, the probability of picking
a spade is twice that of picking a heart; the probability of picking a heart is three times that
of picking a diamond; and the probability of picking a diamond is four times that of picking a
club. Find the probability that the card is a spade or a diamond.
A. 29/41 C. 30/41
B. 26/41 D. 28/41
19. The set A contains the integers 0, 4, 5, 9, 11, 12, 13, 14, 19, …. The Set B contains 1, 2, 3, 6, 7,
8, 10, 15, 16, 17, 18, … Place 20 and 21 in their proper sets.
A. 20 is in B and 21 is in A C. Both 20 and 21 are in A
B. Both 20 and 21 are in B D. 20 is in A and 21 is in B
20. Select suitable plant to excavate one million cubic meters of firm silty clay for the foundations
of a modern power station.
Hint:
Bulked output of tracked loader = 200 m3/h
Swell factor = 1.2
Potential losses = 32%
Muck-shifting season = 1500 h
A. 5 excavators C. 8 excavators
B. 7 excavators D. 6 excavators
21. The cross-sectional area of a road with width of 10 m is 42.9 square meters. The cross-
sectional area is as follows:
9.8 0 7.4
2.4 x 1.2
Determine the value of x
A. 3.49 C. 3.44
B. 3.94 D. 3.99
22. A camera with a focal length of 6.0 in and a picture size of 12 in by 12 in is used to photograph
an area from an altitude of 4000 ft above sea level. If the average ground elevation is 650 ft,
what is the average scale of the photo?
Hint: SE = f/(H-h)
A. 1 in = 558 ft C. 1 in = 528 ft
B. 1 in = 548 ft D. 1 in = 538 ft
23. A copper wire has a nominal strength of 300 MPa and a reduction of area of 77%. Calculate
the true strain at the point of fracture.
A. 137% C. 127%
B. 147% D. 117%
24. What will be the fundamental frequency and first three overtones for a 26-cm-long organ pipe
at 20˚C if it is open. Note: speed of sound at 20˚C = 343 m/s
Hint: Use f = v/2l
A. 660 Hz C. 670 Hz
B. 650 Hz D. 640 Hz
25. It is the bringing of a concrete surface to true grade with enough mortar to produce the
desired finish.
A. Screeding C. Edging
B. Leveling D. Jointing
26. A novice librarian shelved a twelve-volume set of encyclopedias in the following order from
left to right. Volumes 8, 11, 5, 4, 9, 1, 7, 6, 10, 3, 12, 2. Using her system, where will the annual
supplement, Volume 13, go?
3 Engr. Cedrixe M. Madrid, SO2
ENGINEERS ESPLANA, REALUYO, AND CO. REVIEW AND LEARNING CENTER
MANILA – BAGUIO – LEGAZPI - ONLINE
Second Preboard Examination
SET A

A. Between 10 and 3 C. Between 9 and 1


B. Between 8 and 11 D. Between 5 and 9
27. Rolls of carpet are stacked in 20 rows with 3 rolls in the top row, 4 rolls in the next row, and
so on, forming an arithmetic sequence. Find the total number of carpet rolls if there are 22
rolls in the bottom row.
A. 240 C. 260
B. 250 D. 270
28. Pavement markings shall only be applied and/or removed by:
A. LTO C. DPWH
B. PNP D. DOTC
29. To compress 2.8 m3 of free air per minute from 0.05 N/mm2 (atmospheric pressure) to 0.801
N/mm2 (absolute pressure) requires a compressor with a power value of?
Hint: Theoretical Power = 1000 × 0.05 × v1/60 × ln(P2/P1)
A. 6.77 kW C. 6.44 kW
B. 6.74 kW D. 6.47 kW
30. What would be the sound level (in dB) of a sound wave in air that corresponds to a
displacement amplitude of vibrating air molecules of 0.13 mm at 440 Hz?
Hint: I = 2π2vρf2A2 and β = 10 log(I/Io) where Io = 1.0 × 10-12 W/m2
A. 110 dB C. 130 dB
B. 120 dB D. 140 dB
31. Find the volume generated when the first quadrant area bounded by y = x2, the y-axis, and
the lines y = 1 and y = 4 is rotated about the y-axis.

A. 17π/2 C. 13π/2
B. 15π/2 D. 11π/2
32. Three dart players threw simultaneously at a tic-tac-toe board, each hitting a different square.
What is the probability that the three hits constituted a win at tic-tac-toe?
A. 2/21 C. 6/21
B. 4/21 D. 1/21
33. What is the proper sequence of the following polygons?
I. Quadrilateral
II. Parallelogram
III. Rectangle
IV. Square
A. I, II, IV, III C. I, II, III, IV
B. II, I, III, IV D. IV, III, I, II
34. A company determines that in the production of x units of a commodity its revenue and cost
functions are, respectively, R(x) = -3x3 + 970X and C(x) = 2x2 + 500. Find the maximum profit
and minimum average cost.
A. Php 54.32 C. Php 32.54
B. Php 25.43 D. Php 43.25
35. A mine is for sale. A mining engineer estimates that, at current production levels, the mine
will yield an annual net income of Php80,000 for 15 years, after which the mineral will be
exhausted. If an investor’s MARR is 15%, what is the maximum amount he can bid on this
property?
4 Engr. Cedrixe M. Madrid, SO2
ENGINEERS ESPLANA, REALUYO, AND CO. REVIEW AND LEARNING CENTER
MANILA – BAGUIO – LEGAZPI - ONLINE
Second Preboard Examination
SET A

A. Php 477,760 C. Php 466,760


B. Php 467,760 D. Php 476,760
36. Creekside Engineering wants to establish an engineering scholarship in honor of its founder,
Jane Freeborn. The endowment will be placed in a savings account by the university, and the
interest income will be available for the scholarship. The account’s interest rate is 6%, and
the scholarship amount is $3000 per year. What is the required endowment?
A. $50k C. $60k
B. $40k D. $70k
37. Match the following tests on aggregate and its properties:

A. P: 2; Q: 1; R: 4; S: 3 C. P: 4; Q: 2; R: 3; S: 1
B. P: 3; Q: 2; R: 1; S: 4 D. P: 4; Q: 1; R: 2; S: 3
38. The consistency and flow resistance of bitumen can be determined from the following:
A. Ductility Test C. Penetration Test
B. Softening Point Test D. Viscosity Test
39. In order to avoid a storm, a pilot starts the flight 13° off course. After flying 80 miles in this
direction, the pilot turns the plane to head toward the destination. The angle formed by the
course of the plane during the first part of the flight and the course during the second part of
the flight is 160°.
A. 227.67 miles C. 222.67 miles
B. 272.67 miles D. 277.67 miles
40. A steel beam is supported by two pilings 200 feet apart. If a weight is placed x feet from the
piling on the left, a vertical deflection d equals 0.0000008x 2(200-x). How far is the weight if
the vertical deflection is 0.8 feet?

A. 125 feet C. 150 feet


B. 100 feet D. 175 feet
41. Each week, Marino’s Pizzeria sells an average of 160 large supreme pizzas for $16 each. Next
week, the pizzeria plans to run a sale on these large supreme pizzas. The owner estimates
that for each 40¢ decrease in the price, the store will sell approximately 16 more large pizzas.
If the owner wants to sell $4,000 worth of the large supreme pizzas next week, determine the
sale price.
A. $15 C. $20
B. $10 D. $5
42. Woodland Bicycles makes two models of off-road bicycles: the Explorer, which sells for $250,
and the Grande Expedition, which sells for $350. Both models use the same frame, but the
painting and assembly time required for the Explorer is 2 hours, while the time is 3 hours for
the Grande Expedition. There are 375 frames and 450 hours of labor available for production.
How many of each model should be produced to maximize revenue?
A. Explorer = 225; Grande Expedition = 150
B. Explorer = 0; Grande Expedition = 150
C. Explorer = 225; Grande Expedition = 0
D. Explorer = 150; Grande Expedition = 225

5 Engr. Cedrixe M. Madrid, SO2


ENGINEERS ESPLANA, REALUYO, AND CO. REVIEW AND LEARNING CENTER
MANILA – BAGUIO – LEGAZPI - ONLINE
Second Preboard Examination
SET A

43. Study the matrix at the right. In which row and column will 2001 occur?

A. Row = 1, Column = 63 C. Row = 16, Column = 48


B. Row = 15, Column =49 D. Row = 2, Column = 60
44. A vacuum pump removes 20% of the air in a sealed jar on each stroke of its piston. The jar
contains 21 liters of air before the pump starts. After how many strokes will only 42% of the
air remain?
A. 3 strokes C. 5 strokes
B. 4 strokes D. 2 strokes
45. A room is 35 ft × 25 ft in plan. Ceiling height is 14 ft. Openings for doors and windows total
85 ft2. The following data is given for plastering and painting operations. Plaster and paint
crew:
1 supervisor $30/hr
1 laborer $12/hr
2 painter $18/hr
Plastering productivity = 50 ft2/L.H.
Painting productivity = 150 ft2/L.H.
The estimated labor cost for plastering and painting the room (walls and ceiling) is most
nearly:
A. $1,020 C. $1,460
B. $1,280 D. $1,690
46. A roller is used to compact soil to a specific density. The roller can achieve this target density
for a 6-in. layer of material in four passes. The following specifications are given:
Width of roller drum = 8.0 ft
Forward speed of roller = 3 mph
Overall efficiency of roller = 80%
Soil shrinkage = 15%
The material delivery rate (bank measure) to the site is 950 yd 3/hr. The number of rollers
required to keep up with this material delivery rate is most nearly:
A. 1 C. 3
B. 2 D. 4
47. A circular horizontal curve connects two tangents with a deflection angle of 42°50′. The
roadway is a two-lane highway with 12-ft lanes. The centerline of the roadway has a radius of
1,245 ft. The design speed = 50 mph. P.C. for the centerline circular curve is at sta. 23 + 32.56.
It is proposed to insert a pair of symmetric spirals at the PC and the PT. The minimum length
of spiral (ft) is most nearly:
A. 120 C. 160
B. 140 D. 180
48. A study area is divided into three socio-economic zones, whose trip production and trip
attractions are tabulated below:

6 Engr. Cedrixe M. Madrid, SO2


ENGINEERS ESPLANA, REALUYO, AND CO. REVIEW AND LEARNING CENTER
MANILA – BAGUIO – LEGAZPI - ONLINE
Second Preboard Examination
SET A

Resistance to travel between zones is represented by the following matrix of friction factors,
which are approximately inversely proportional to time of travel between zones.

The number of trips produced by zone 3 and attracted to zone 2, according to the first
iteration of the gravity model, is most nearly:
𝐴 𝐹𝑖𝑗
Hint: 𝑇𝑖𝑗 = 𝑃𝑖 [∑ 𝐴𝑗 ]
𝑗 𝐹𝑖𝑗

A. 110 C. 150
B. 130 D. 170
49. Maloi, who is playing Scrabble with Mikha, has seven different letters. She decides to test each
five-letter permutation before her next move. If each permutation takes 5 sec, how long will
it take Maloi to check all the permutations?
A. 2,520 seconds C. 5,040 seconds
B. 12,600 seconds D. 25,200 seconds
50. The first coat of paint for the outside walls of a building requires 1 L of paint for each 10 m 2
of wall surface. The second coat requires 1 L for every 15 m2. If the paint costs $3.50 per liter,
what will be the cost of two coats of paint for the four outside walls of a rectangular building
20 m long, 15 m wide, and 6 m high?
A. $245 C. $490
B. $118 D. $236
51. Crew A can assemble 2 cars in 5 days, and crew Β can assemble 3 cars in 7 days. If both crews
together assemble 100 cars, with crew Β working 10 days longer than crew A, how many days
(rounded to the nearest day) must each crew work?
A. Crew A = 116 days, Crew B = 126 days
B. Crew A = 110 days, Crew B = 120 days
C. Crew A = 150 days, Crew B = 160 days
D. Crew A = 115 days, Crew B = 125 days
52. Using the given formula, determine the measurement of the sun’s angle of inclination for a
building located at a latitude of 64˚ on the 16th of November.
(𝑁+10)360
Hint: Angle of sun =90° − 𝑙𝑎𝑡𝑖𝑡𝑢𝑑𝑒 − 23.5° cos [ ]
365
A. 6.46˚ C. 6.66˚
B. 6.44˚ D. 6.64˚
53. If asphalt pavement costs 0.80 per square foot, find the cost to pave the circular road in the
figure shown. Round to the nearest dollar.

A. $2,262 C. $2,662
B. $2,622 D. $2,226
54. A traffic flow relationship is given by q = kv, where q is the traffic volume in veh/hr, k is the
traffic density in veh/mi, and v is the mean speed in mi/hr. The mean speed on a road in mi/hr
is given by the relationship
7 Engr. Cedrixe M. Madrid, SO2
ENGINEERS ESPLANA, REALUYO, AND CO. REVIEW AND LEARNING CENTER
MANILA – BAGUIO – LEGAZPI - ONLINE
Second Preboard Examination
SET A

𝑚𝑖 𝑚𝑖 2
𝑣 = 60 − (0.2 )𝑘
ℎ𝑟 𝑣𝑒ℎ − ℎ𝑟
If the mean speed on a road during the rush hour is 45 mi/hr, the maximum capacity of traffic
density for this road during rush hour is most nearly:
A. 15 veh/mi C. 75 veh/mi
B. 45 veh/mi D. 230 veh/mi
55. It means a method of protecting workers from cave-ins by excavating the sides of an
excavation to form one or a series of horizontal levels or steps, usually with vertical or near-
vertical surfaces between levels.
A. Shoring C. Sloping
B. Benching D. Sheeting
56. How wide does the work area need to be on scaffolding?
A. At least 17 inches C. At least 19 inches
B. At least 18 inches D. At least 20 inches
57. It is the bucket volume contained within the bucket when following the outline of the bucket
sides.
A. Plate Line Capacity C. Water Line Capacity
B. Struck Capacity D. Heaped Volume
58. Localized upward buckling and shattering of the slabs at transverse joints or cracks.
A. Crack C. Blowups
B. Settlement D. Fault
59. The provision of safety sight distance depends on the characteristics of the road environment
such as:
I. Road Geometry
II. Road Surface
III. Road Illumination at night
IV. Road Topography
A. All of the above C. II, III, and IV
B. I, II, and IV D. I, II, and III
60. Standard color for signs reserved as background color for all tourists facility directional and
information signs.
A. Green C. Brown
B. Red D. Pink
61. A closed rectangular tank with a square base and with a capacity of 48 cubic meter is to be
constructed. The material for the top and bottom costs 3000 per square meter for the sides
4000 per square meter. What height of the tank will give to minimum cost?
A. 1 m C. 3 m
B. 2 m D. 4 m
62. A manufacturing company has determined that the total cost of producing an item can be
determined from the equation C = 8x2 – 176x + 1800, where x is the number of units that the
company makes. How many units should the company manufactures in order to minimize the
cost?
A. 18 units C. 14 units
B. 11 units D. 17 units
63. Estimate the actual bucket load in bank cubic yards for a loader bucket whose heaped capacity
is 5 cu. yd. (3.82 m3). The soil’s bucket fill factor is 0.90 and its load factor is 0.80.
A. 2.65 BCM C. 2.85 BCM
B. 2.75 BCM D. 2.95 BCM
64. Using the straight-line method of depreciation, find the annual depreciation and book value
at the end of each year for a track loader having an initial cost of $50,000, a salvage value of
$5000, and an expected life of 5 years.
A. $8,000 C. $9,000
B. $8,500 D. $9,500
65. Determine the hourly production of a 0.57 m capacity backhoe, excavating a foundation 3 m
3

deep in common earth.

8 Engr. Cedrixe M. Madrid, SO2


ENGINEERS ESPLANA, REALUYO, AND CO. REVIEW AND LEARNING CENTER
MANILA – BAGUIO – LEGAZPI - ONLINE
Second Preboard Examination
SET A

Ideal output = 100 m3/h


Backhoe proportion of face shovel proportion = 0.8
Swing factor = 1.0
Job Conditions = 40% loss
Swell Factor = 1.1
A. 44 m3/h C. 33 m3/h
B. 54 m /h 3 D. 66 m3/h
66. On the given solid we indicate an element of volume in the shape of a shell. Its inner radius r
is x, its thickness dr is dx, and its height h is y. Calculate the volume.

A. 256π/5 cu. units C. 255π/6 cu. units


B. 266π/6 cu. units D. 265π/5 cu. units
67. The path of the typhoon “Dindo” passes thru Batanes Island at a certain location whose depth
of water above the bottom of the sea equal to 150m. Determine the approximate velocity of
the wave propagation in kph.
A. 74.6 kph C. 77.8 kph
B. 68.6 kph D. 65.8 kph
68. An engineer is hired to design a bridge to carry traffic across the river. Her first problem is to
determine the distances from point A to point B. To do so, she starts at point A and measures
distance of 250 m in a direction at right angles to the segment AB. At point C, she uses her
transit to find that angle ACB measures 49˚50’. How long should the bridge be?
A. 246.144 m C. 296.184 m
B. 196.184 m D. 286.124 m
69. Find the expected production in loose cubic meters per hour of a 2.3 m3 hydraulic shovel
equipped with a front-dump bucket. The material is common earth with a bucket fill factor of
1.0. The average angle of swing is 75˚ and job efficiency is 0.80.
Hint: Production (LCY/h) = C × S × V × B × E
Cycle output = 150 cycles/h
Swing = 1.05
A. 280 LCM/h C. 260 LCM/h
B. 270 LCM/h D. 290 LCM/h
70. The grading works of a proposed National Road shows the following data:
FHD = 50 m
LEH = 450 m
Cost of haul = Php0.25 per meter station
Compute the cost of borrow.
Hint: LEH = C(Cb/Ch) + FHD
A. Php 6.00 C. Php 5.00
B. Php 7.00 D. Php 4.00
71. Compute the impact factor for a car travelling at a speed of 120 kph along a horizontal curve
of radius equal to 550 m.
A. 0.206 C. 0.602
B. 0.260 D. 0.620
72. What is the maximum deflection of a platform?
9 Engr. Cedrixe M. Madrid, SO2
ENGINEERS ESPLANA, REALUYO, AND CO. REVIEW AND LEARNING CENTER
MANILA – BAGUIO – LEGAZPI - ONLINE
Second Preboard Examination
SET A

A. 1/50 of the span when loaded C. 1/40 of the span when loaded
B. 1/70 of the span when loaded D. 1/60 of the span when loaded
73. The diameter of the moon is 3480 km. How many moons would be needed to create a volume
equal to the volume of the Earth?
A. 34.9 C. 39.4
B. 43.9 D. 49.3
74. A 1.20-ton car moving with a velocity of 30 kph bumps the rear of a 1.80-ton car moving in
the same direction with a velocity of 20 kph. The bumpers get locked during the collision.
Determine the velocity of the cars immediately after impact.
A. 24 kph C. 30 kph
B. 20 kph D. 28 kph
75. Earth is approximately 93,000,000.00 miles from the sun, and the Jupiter is approximately
484,000,000.00 miles from the sun. How long would it take a spaceship travelling at 7,500.00
mph to fly from Earth to Jupiter?
A. 9 years C. 6 years
B. 5 years D. 3 years
*** END ***
WARNING: Failure to submit your Test Questions (Complete) set will cause the cancellation of your
Test-Results for the subject.

“If you want it sweet, got that sugar on lock


If you want that spice, I can turn the heat up
Baby, I'm the cake, better know what you got
I'm the cherry on top, cherry on top!”