0% found this document useful (0 votes)
13 views1 page

Letter DPWH BCD

A group of 4th year BSCE students from the University of Negros Occidental- Recoletos is requesting permission from SBK Construction Inc. to use documents from an ongoing construction project for their study. They require specific documents such as Detailed Unit Price Analysis, Bill of Quantities, and architectural plans, assuring confidentiality in their use. The students emphasize the urgency of their request for the completion of their project study.

Uploaded by

Jay Grijaldo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

Letter DPWH BCD

A group of 4th year BSCE students from the University of Negros Occidental- Recoletos is requesting permission from SBK Construction Inc. to use documents from an ongoing construction project for their study. They require specific documents such as Detailed Unit Price Analysis, Bill of Quantities, and architectural plans, assuring confidentiality in their use. The students emphasize the urgency of their request for the completion of their project study.

Uploaded by

Jay Grijaldo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

January 24, 2025

SBK Construction Inc.


Poblacion 1, Tinago Dumaguete City, Dumaguete City, Philippines

Re: Request for Documents of Construction Project with a minimum of 2-storey and minimum
of 1500 square meter floor area.

Dear Sir,

Greetings!
I hope this message finds you well. We are 4th year, BSCE students from University of Negros
Occidental- Recoletos, Incorporated. We are writing to formally ask from you a permission to
use your ongoing construction projects (construction about to start or ongoing with less than
50% completion) in partial fulfillment of the requirements of this degree. The project we are
looking for must be a building project minimum of 2-storey and minimum of 1500 square
meter floor area.

1. Detailed Unit Price Analysis (DUPA)


2. Bill of Quantities (BOQ)
3. PERT/CPM
4. Structural and Architectural Plans
5. Scheduling
6. Other related documents

We would like to ask permission to use one of your projects in our study. In line with this, the
documents stated above were needed to support our objectives.

I assure you that the requested documents will be used exclusively for our project study, and we
will treat them with the utmost confidentiality. If necessary, we are willing to sign any required
confidentiality agreements or forms.

I kindly request your prompt attention to this matter, as it is crucial for the completion of our
study. Thank you for your cooperation. I look forward to your positive response. You can
contact us at 09956343016 or at [email protected]

Sincerely,

Patopatin, Rizle M. Samilliano, Jihan Largo, Patrick Joshua


BSCE - IV BSCE - IV BSCE - IV

Depaloma, Stefannie Suerte, Novaberlit Grijaldo, Jason


BSCE - IV BSCE - IV BSCE - IV

Noted by:

Engr. Jose Gino Gutierrez, RMP, MEngCE Engr. Lea Joy Hiponia
CEPRJ142D Adviser/ Dean, College of Engineering
Department Head, Civil Engineering

You might also like