Tutorial Questions 02
Tutorial Questions 02
QUESTION 2:
How is quality related to project scope and why is this relationship important for
effective cost management?
QUESTION 3:
What are the key stages in the evolution of Quality Management and how have
they shaped today’s practices?
QUESTION 4:
What are the main characteristics and concepts of modern quality management
and how do they support cost management strategies?
QUESTION 5:
Who are the key founders of the modern quality movement and what were their
main contributions?
QUESTION 6:
Why is understanding customer expectations, standards, and requirements
essential in quality planning, and how does it affect cost management?
QUESTION 7:
What are the characteristics of quality-supportive requirements and how do they
contribute to cost efficiency in project execution?
Page 1 of 5
QUESTION 8:
How does a Standards-Requirements Matrix support quality planning, and what is
its role in minimizing costs?
QUESTION 9:
What role does quality planning play during the design phase, and how does it
affect the overall cost of a project?
QUESTION 10:
How is quality ensured in the manufacturing phase and what methods help
maintain quality while controlling costs?
QUESTION 11:
What is the primary difference between Quality Assurance (QA) and Quality
Control (QC), and how do they individually support cost management?
QUESTION 12:
Why is it important to design a formal quality audit, and how does it benefit cost
management strategies?
QUESTION 13:
What are the key components of an effective quality audit plan in a project
environment?
QUESTION 14:
What is metrology, and how does it support both quality assurance and
cost-effective production?
QUESTION 15:
What is measurement assurance and how does it differ from simply using
calibrated tools?
Page 2 of 5
QUESTION 16:
What are the Seven Basic Tools of Quality and how can they be applied in a
project for quality control?
QUESTION 17:
How do you choose the right quality control tool for a specific project scenario?
QUESTION 18:
Why is it important to define metrics in quality control, and what are some
common quality metrics used in projects?
QUESTION 19:
What is Six Sigma and how does it help in cost management and quality
improvement?
QUESTION 20:
What is the Cost of Quality (CoQ) and how do quality awards influence quality
control practices?
QUESTION 21:
What is the process approach to managing quality, and why is it important in
quality control and cost management?
QUESTION 22:
What is a Quality Management System (QMS) and what are the key benefits of
implementing one in an organization?
QUESTION 23:
What are the key principles of ISO 9000/9001 Quality Management, and how do
they support effective quality control?
Page 3 of 5
QUESTION 24:
How did ISO 9001:2015 improve upon previous versions, and what is the
significance of the High-Level Structure (HLS)?
QUESTION 25:
How should risks and opportunities be addressed in a Quality Management
System (QMS), and how does this affect cost and quality performance?
QUESTION 26:
How do performance monitoring and quality assurance support effective quality
control and cost management?
QUESTION 27:
What is the difference between measuring and monitoring processes versus
products, and why are both important?
QUESTION 28:
How can an organization measure and monitor the satisfaction of interested
QUESTION 29:
Why is the analysis and reporting of data essential in quality control and cost
management?
QUESTION 30:
What is the role of continual improvement in a Quality Management System
(QMS) and the overall organization?
QUESTION 31:
How is an internal audit used as a management tool in quality control and cost
management?
Page 4 of 5
QUESTION 32:
What are the key steps in planning and managing an internal audit?
QUESTION 33:
What happens during the opening meeting of an internal audit and why is it
important?
QUESTION 34:
How is data collected during an internal audit and what methods are used?
QUESTION 35:
What should be included in audit feedback and reporting, and how does it
contribute to quality and cost improvements?
NB:
Prepare for the 60Mins TEST arranged to be done at the normal class session on
FRIDAY.
Page 5 of 5