Chat GPT

The document outlines the process of calculating the shortest path from a source vertex A to other vertices (B, C, D, E, F) in a network represented as a graph with weighted edges. It details the initialization of distances and the step-by-step updates of paths and costs as nodes are processed. The final results show the shortest paths and costs from A to each vertex, along with a note on the potential disadvantage of flooding in the network.

Uploaded by

21vcetcse058
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views4 pages

Chat GPT

The document outlines the process of calculating the shortest path from a source vertex A to other vertices (B, C, D, E, F) in a network represented as a graph with weighted edges. It details the initialization of distances and the step-by-step updates of paths and costs as nodes are processed. The final results show the shortest paths and costs from A to each vertex, along with a note on the potential disadvantage of flooding in the network.

Uploaded by

21vcetcse058
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

11/25/24, 10:58 PM ChatGPT

Problem
We are calculating the shortest path from source vertex A to all other vertices (B, C, D, E, F) in the
network.

Network
The network is represented as a graph, where:

Each node (A, B, C, etc.) represents a router.

Each edge (A-B, A-D, etc.) has a cost.

Initialization
1. A is the source vertex.

2. Start with:

D(X): Distance (cost) from A to vertex X.

P(X): Previous node on the path from A to X.

Step 1: Initialization
Initially, only the neighbors of A have known costs:

Cost to B = 2

Cost to D = 1

Cost to C = 5

Cost to E and F = ∞ (not directly connected).

Step N D(B), P(B) D(C), P(C) D(D), P(D) D(E), P(E) D(F), P(F)

1 A 2, A 5, A 1, A ∞ ∞

Step 2: Add D (Smallest Cost)


Among the nodes, D has the smallest cost (1).

Add D to N (set of processed nodes).

Update paths through D:

1. A to B:

D(B) = min(2, 1 + c(D, B)) = min(2, 3) = 2.


No change for B.

2. A to C:

D(C) = min(5, 1 + c(D, C)) = min(5, 4) = 4.


Update D(C) = 4, P (C) = D.
3. A to E:

D(E) = min(∞, 1 + c(D, E)) = min(∞, 2) = 2.

https://chatgpt.com/c/6744b085-18c0-8007-8a5f-50d8de109e88 1/4
11/25/24, 10:58 PM ChatGPT

Update D(E) = 2, P (E) = D.

Step N D(B), P(B) D(C), P(C) D(D), P(D) D(E), P(E) D(F), P(F)

2 AD 2, A 4, D 1, A 2, D ∞

Step 3: Add E (Smallest Cost)


Next smallest cost is E (2).

Add E to N.

Update paths through E:

1. A to B:

D(B) = min(2, 2 + c(E, B)) = min(2, ∞) = 2.


No change for B.

2. A to C:

D(C) = min(4, 2 + c(E, C)) = min(4, 3) = 3.


Update D(C) = 3, P (C) = E .
3. A to F:

D(F ) = min(∞, 2 + c(E, F )) = min(∞, 4) = 4.


Update D(F ) = 4, P (F ) = E .

Step N D(B), P(B) D(C), P(C) D(D), P(D) D(E), P(E) D(F), P(F)

3 ADE 2, A 3, E 1, A 2, D 4, E

Step 4: Add B (Smallest Cost)


Next smallest cost is B (2).

Add B to N.

Update paths through B:

1. A to C:

D(C) = min(3, 2 + c(B, C)) = min(3, 5) = 3.


No change for C.

2. A to F:

D(F ) = min(4, 2 + c(B, F )) = min(4, ∞) = 4.


No change for F.

Step N D(B), P(B) D(C), P(C) D(D), P(D) D(E), P(E) D(F), P(F)

4 ADEB 2, A 3, E 1, A 2, D 4, E

Step 5: Add C (Smallest Cost)


https://chatgpt.com/c/6744b085-18c0-8007-8a5f-50d8de109e88 2/4
11/25/24, 10:58 PM ChatGPT

Next smallest cost is C (3).

Add C to N.

Update paths through C:

1. A to F:

D(F ) = min(4, 3 + c(C, F )) = min(4, 8) = 4.


No change for F.

Step N D(B), P(B) D(C), P(C) D(D), P(D) D(E), P(E) D(F), P(F)

5 ADEBC 2, A 3, E 1, A 2, D 4, E

Step 6: Add F (Smallest Cost)


Finally, F is added to N.

Step N D(B), P(B) D(C), P(C) D(D), P(D) D(E), P(E) D(F), P(F)

6 ADEBCF 2, A 3, E 1, A 2, D 4, E

Result
The shortest paths from A to all other vertices:

A to B: Cost = 2, Path = A → B

A to C: Cost = 3, Path = A → E → C

A to D: Cost = 1, Path = A → D

A to E: Cost = 2, Path = A → D → E

A to F: Cost = 4, Path = A → E → F

Disadvantage
Flooding (excessive traffic) can occur, causing delays or infinite loops.
This can be resolved using a Time-To-Live (TTL) field.

2/2

https://chatgpt.com/c/6744b085-18c0-8007-8a5f-50d8de109e88 3/4
11/25/24, 10:58 PM ChatGPT

The graph shows nodes (A, B, C, D, E, F) connected by weighted edges. The weights represent the
cost between nodes.