0% found this document useful (0 votes)
24 views3 pages

Work Schema

The document outlines a work schema for completing a networking assignment over one week, detailing tasks assigned to team members for various branches including Malacca, Ipoh, Kedah, and Perlis. Each branch requires a logical topology design, justification of the topology, and a VLSM IP addressing scheme, while additional tasks include creating a cover page, work breakdown structure, configuration techniques, and a Cisco Packet Tracer diagram. The project aims to provide a comprehensive network solution for NeuroByte, with all references compiled in APA format.

Uploaded by

RIVALS〆toxic
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views3 pages

Work Schema

The document outlines a work schema for completing a networking assignment over one week, detailing tasks assigned to team members for various branches including Malacca, Ipoh, Kedah, and Perlis. Each branch requires a logical topology design, justification of the topology, and a VLSM IP addressing scheme, while additional tasks include creating a cover page, work breakdown structure, configuration techniques, and a Cisco Packet Tracer diagram. The project aims to provide a comprehensive network solution for NeuroByte, with all references compiled in APA format.

Uploaded by

RIVALS〆toxic
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Work Schema for Completing the Networking Assignment (1

Week)

1. Cover Page and Table of Contents

 Sushank (Team Leader)

o Create the cover page with team member names and TP


numbers.

o Generate the table of contents.

2. Work Breakdown Structure (WBS)

 Sushank

o Develop the WBS and ensure it is digitally signed by all team


members.

3. Malacca Branch (Sushank)

 Logical Topology Design

o Design the logical topology for the Malacca branch.

o Include routers, switches, and end devices.

o Ensure connectivity to IoT devices and separate server rooms


for different services.

 Justification of the Topology

o Provide a detailed justification for the chosen topology.

o Explain how it meets the requirements of the scenario.

 VLSM IP Addressing Scheme

o Develop a VLSM IP addressing scheme for the Malacca branch.

o Use the 172.16.10.0/23 IP address range.

o Ensure efficient use of IP addresses with subnetting.

4. Ipoh Branch (Bibek)

 Logical Topology Design

o Design the logical topology for the Ipoh branch.

o Include routers, switches, and end devices.

o Ensure connectivity to IoT devices and separate server rooms


for different services.
 Justification of the Topology

o Provide a detailed justification for the chosen topology.

o Explain how it meets the requirements of the scenario.

 VLSM IP Addressing Scheme

o Develop a VLSM IP addressing scheme for the Ipoh branch.

o Use the 172.16.10.0/23 IP address range.

o Ensure efficient use of IP addresses with subnetting.

5. Kedah Branch (Sandip)

 Logical Topology Design

o Design the logical topology for the Kedah branch.

o Include routers, switches, and end devices.

o Ensure connectivity to IoT devices and separate server rooms


for different services.

 Justification of the Topology

o Provide a detailed justification for the chosen topology.

o Explain how it meets the requirements of the scenario.

 VLSM IP Addressing Scheme

o Develop a VLSM IP addressing scheme for the Kedah branch.

o Use the 172.16.10.0/23 IP address range.

o Ensure efficient use of IP addresses with subnetting.

6. Perlis Branch (Sushant)

 Logical Topology Design

o Design the logical topology for the Perlis branch.

o Include routers, switches, and end devices.

o Ensure connectivity to IoT devices and separate server rooms


for different services.

 Justification of the Topology

o Provide a detailed justification for the chosen topology.

o Explain how it meets the requirements of the scenario.


 VLSM IP Addressing Scheme

o Develop a VLSM IP addressing scheme for the Perlis branch.

o Use the 172.16.10.0/23 IP address range.

o Ensure efficient use of IP addresses with subnetting.

7. Justification of Configuration Techniques

 Sushank

o Provide a brief explanation of the configuration techniques


used for different network devices.

o Include screenshots as evidence of the configurations.

o Ensure all configurations are documented and justified.

8. Conclusion

 Sushank

o Summarize the key findings and outcomes of the project.

o Highlight the benefits of the proposed network solution for


NeuroByte.

9. References

 Sushank

o Compile all references in APA format.

o Ensure all external sources are properly cited.

10. Cisco Packet Tracer Diagram

 Sushank

o Integrate all branch designs into a single Cisco Packet Tracer


diagram.

o Ensure the diagram accurately reflects the proposed network


solution.

o Submit the configuration file in Moodle.

You might also like