0% found this document useful (0 votes)
48 views41 pages

TESLA ELEC CALC Rev00.xlsm

The document outlines the design and calculations for the Zeyad Park project, focusing on low voltage systems and various electrical calculations such as load, generator sizing, short circuit current, and cable sizing. It includes a personal note from the designer, Aly Abu Alazm, expressing gratitude and inviting feedback. The project is set to span 24 months, starting from October 7, 2021.

Uploaded by

AbouZakaria
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views41 pages

TESLA ELEC CALC Rev00.xlsm

The document outlines the design and calculations for the Zeyad Park project, focusing on low voltage systems and various electrical calculations such as load, generator sizing, short circuit current, and cable sizing. It includes a personal note from the designer, Aly Abu Alazm, expressing gratitude and inviting feedback. The project is set to span 24 months, starting from October 7, 2021.

Uploaded by

AbouZakaria
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 41

‫‪Introduction‬‬

‫السلام عليكم ورحمه الله وبركاته‬


‫الاخوه الاعزاء‬
‫‪،‬تحيه طيبه و بعد‬
‫المطلوبه فى م جال الانشاءات ليكون عونا لنا فى التصميم و اعداد مخططات ‪ Low Volt‬على كل حسابات ‪ TESLA‬بفضل الله وحده تم الانتهاء من هذا العمل حيث حاولت جاهدا ان يحتوى برنامج‬
‫التنفيذ وإحقاقا للحق بعض شيتات هذا البرنامج مقتبسه من الانترنت بعد إضافه او تصحيح بعض المعادلات و اعاده اخراجها بشكل يسهل التعامل معها(من وجهه نظرى) اما الغالبيه العظمى من هذه‬
‫‪.‬الشيتات فهى من تصميمى بفضل الله تعالى و عونه‬
‫و اتمنى من كل ش خص يستفيد من هذا البرنامج الدعاء لى و لوالدى و لعائلتى و لكل من ساهم فى هذا العمل بالمغفره و الرحمه و ان يتصدق باى مبلغ لوجه الله تعالى فهذا العمل صدقه جاريه عنى و‬
‫‪.‬عن اهلى و عن كل من شارك فيه‬

‫حتى يتسنى لى عمل التعديل المطلوب و من ثم اعاده نشر اصدار جديد لتعم المنفعه ‪ [email protected]‬و لأى استفسار او ملاحظات على البرنامج يرجى التواصل على الايميل التالى‬
‫‪.‬على الجميع‬
‫تحياتى‬
‫م على ابو العزم‬
‫شركه الاتحاد الهندسى السعودى خطيب و علمى‬

‫‪Index‬‬
‫‪Project Data‬‬ ‫‪Conduit Sizing‬‬

‫‪Load Calculation Based on Area‬‬ ‫‪Max No of Homerun @ Cable Trunk as per NEC‬‬

‫‪Gen sizing‬‬ ‫‪Cable Trunk Sizing as per IEEE‬‬

‫‪Short Circuit Calc‬‬ ‫‪Cable Trunk Sizing as per NEC‬‬

‫‪Cable Sizing‬‬ ‫‪Cable Tray Sizing‬‬

‫‪Summary of Cable Sizing‬‬ ‫‪Lighting Protection Calc as per IS-2309‬‬

‫‪Cable Sizing For Intial Desig only‬‬ ‫‪Lighting Protection Calc as per IEC-620305‬‬

‫‪Cable Protection Device Selection‬‬ ‫‪Total PF & Capacitor Bank Calc‬‬

‫‪Earthing Conductor Size Calc‬‬ ‫‪Lighting Pole Foundation Calc‬‬

‫‪Earthing Resistance Calc‬‬ ‫‪Fire Alarm Battary Calc‬‬

‫‪Low current Earth Resis. Calc‬‬ ‫‪UPS Calc‬‬

‫‪Single Rod Earth Resis. Calc‬‬ ‫‪Panel Schedule‬‬


Index

Project Data

Project Zeyad Park

Designer Aly Abu Alazm

Dated 07.10.2021

Project Period 24 Month


Load Calculation Based on Area

Project Zeyad Park


Designer Aly Abu Alazm Index
Dated 07.10.2021 N
u
Project Period 24 Month m
Clear Data b
Table (12) DPS-01
e rev rev 02
SEC:Table (7,11,12) DPS-01 rev 02 Table (7) DPS-01 02
r

o
Total Total Grand Total
Total Built Area Addational No of Diveristy Total Diveristy f
No Customer Category VA/m2 Connected DF Demand of
Load KVA Meter Factor Load
Load KVA Load KVA Load KVA
M
e
t
e
0 0 0.00 0 0 0 0 ###
r
s
###
###
Summary ###
N
###
Total Diveristy
Transformer Type Future load factor Reqired Power Capacity ###
Load
Oil Transformer 10% ###

0 20% 0 0 KVA ###

###
###
GENERATOR CALCULATION

Project Zeyad Park

Designer Aly Abu Alazm Index


Dated 07.10.2021

Project Period 24 Month


Clear Data

Static load + Small Motors

No Load Desc. Load qty KW Effiency Vph PH PF DF KW KVA


- -

- -

- -

- -

- -

- -

- -

- -

Static load + Small Motors - -

Dynamic load (Big Motors Only)

Starting
No Load Desc. Load Type
Current Factor
Load qty KW o/p PH PF DF Efficiency Vph

- ###

- ###

- ###

- ###

- ###

- ###

- ###

Total Dynamic load ###


Grand Total load ###
Total KVA for all load = -
Derating Temp = -

Derating Hight = -

Derating Power Factor = -

Gen Size With Derating KVA case 1 = - KVA

Biggest Motor Starting KVA = - `

Biggest Motor KVA i/p = -


Gen Size With Starting Motor KVA case 2 = - KVA

Biggest value case 1 or 2 = - KVA


Summary

Stand By GEN = - KVA

Prime GEN Limited = - KVA

Prime GEN un Limited = - KVA

No Ckecked item Check case

1 Check load distribution per phase

2 no load case should not less than 30 % of max load Up


3 Load bank reqirment
Short Circuit Current Calculation

Project Zeyad Park Index


Designer Aly Abu Alazm
Dated 07.10.2021
Project Period 24 Month
Clear Data
RT
Uo / ( √3 * √ ( R2T +X2T))
Step 1: ###
MV Network ###
Psc of MV Network MVA =
Short Cuircuit @ MV Network 0.0 KA KA
###
Step 2:
###
Transformer
Primary (KV)
Vo (V) ###
###
P(KVA) ###
Usc (%) ###
Short Cuircuit @ Transformer 0.0 KA KA
Step 3: ###
###
Step3-1 ###
Cable Size
No of Cable / phase
Total Cable Size / Phase 0
Cable Length: L
Main C.B Amp
###
###

Step3-2 ###
Bus Bars

Short Cuircuit @ - 0.0 KA


Step 4:

Cable
Cable Size
No of Cable / phase ###
Total Cable Size / Phase 0
Cable Length: L
Short Cuircuit @ - 0.0 KA
Step 5:
Cable
Cable Size
No of Cable / phase ###
Total Cable Size / Phase 0
Cable Length: L
Short Cuircuit @ - 0.0 KA
Step 6:

Cable
Cable / Wire Size ###
Cable Length: L
Short Cuircuit @ - 0.0 KA

Summary
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

Up
Cable Sizing & Voltage Drop Calculation

Project : X Park
Designer : Aly Abu Alazm
Dated : 07.10.2021 Index
Project Period : 24 Month Summary of Cable sizing
Step 1: Cable Sizing Clear Data
Cable Routting

Demand Route Length Safety


NO From to No OF Phase Phase Volt Insulation Cable Metal Tolerance
Load KVA Meter Factor

1
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0

Derating Factor

Installation in Ground Installation on Cable Tray Total Derating


NO Ground temp Air temp Depth of Laying Soil Resis
trefoil / flat trefoil / flat Factor

1 1
2 1
3 1
4 1
5 1
6 1
7 1
8 1
9 1
10 1
Summary

Current After Select


NO
Derating Factor
No Of Core
Cable Size No of Cable /Phase
Cable Current Capacity Summary
1 - -
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -

Step 2:Allawable
Voltage Drop Check Step 2: Voltage Drop
Voltage
Drop

Cable Size mVolt/Amp Previous Voltage Total Voltage


NO
CSA
Route Length
/Meter Drop If Any Drop Summary
1 - 0 0.00% -
2 - 0 0.00% -
3 - 0 0.00% -
4 - 0 0.00% -
5 - 0 0.00% -
6 - 0 0.00% -
7 - 0 0.00% -
8 - 0 0.00% -
9 - 0 0.00% -
10 - 0 0.00% -

Step 2: Short Circuit Current Check Check Step 2: Voltage Drop


1.1 According to BS 7430

I t
A 
K

Short Circuit Safety


NO Current KA Fault Time
Factor Summary Cable Size

1 -
2 0% -
3 0% -
4 0% -
5 0% -
6 0% -
7 0% -
8 0% -
9 0% -
10 0% -
Step 3: Circuit Breaker Slection Check

Load Amp Trip Circuit Breaker Selected I sc of CB


NO Load Type Factor
Factor Calculated
NO of Pole
Current (Amp Trip) KA Summary Cable Size

1 0.00 - 0 - MCCB current Raiting

2 0.00 - 0 -
3 0.00 - 0 -
4 0.00 - 0 -
5 0.00 - 0 -
6 0.00 - 0 -
7 0.00 - 0 -
8 0.00 - 0 -
9 0.00 - 0 -
10 0.00 - 0 -

Step 4: Over Load Protection or Disconnect Switch (if any)

Load Current Amp Rating


Factor
Amp Calculated

1.15 -
1.15 -
1.15 -
1.15 -
1.15 -
1.15 -

Up
Summary of Cable sizing
Cable Sizing

Index
Project Zeyad Park Cable Sizing
Designer Aly Abu Alazm

Dated 07.10.2021

Project Period 24 Month

Final Summary

IEC 60364-5-54

Circuit Breaker
Route Load
Demand Safety Voltage
NO Load Description Length Current Cable Data Armouring Remarks
Load KVA Factor Drop
Meter Amp No Of Pole Amp Trip Isc KA

1 - - - - 0.0% - - - - - - - - - - - - - - - - - Unarmoured 0.00% 0 0 0

2 - - - - 0.0% - - - - - - - - - - - - - - - - - Unarmoured 0.00% 0 0 0

3 - - - - 0.0% - - - - - - - - - - - - - - - - - Unarmoured 0.00% 0 0 0

4 - - - - 0.0% - - - - - - - - - - - - - - - - - Unarmoured 0.00% 0 0 0

5 - - - - 0.0% - - - - - - - - - - - - - - - - - Unarmoured 0.00% 0 0 0

6 - - - - 0.0% - - - - - - - - - - - - - - - - - Unarmoured 0.00% 0 0 0

7 - - - - 0.0% - - - - - - - - - - - - - - - - - Unarmoured 0.00% 0 0 0

8 - - - - 0.0% - - - - - - - - - - - - - - - - - Unarmoured 0.00% 0 0 0

9 - - - - 0.0% - - - - - - - - - - - - - - - - - Unarmoured 0.00% 0 0 0

10 - - - - 0.0% - - - - - - - - - - - - - - - - - Unarmoured 0.00% 0 0 0


Cable Protection Device Calc

Project : Zeyad Park

Designer : Aly Abu Alazm Index


Dated : 07.10.2021

Project Period : 24 Month

Clear Data
Final Summary

Load
Load Type
Current

- - Amp
- - Amp
- - Amp
- - Amp
- - Amp
-
Amp of Protection Device should Be >= - Amp
- - Amp
- - - Amp
- - - Amp
- - - Amp
Cable Sizing & Voltage Drop
Calculation

Project Zeyad Park Index


Designer Aly Abu Alazm
Dated 07.10.2021
Project Period 24 Month

Step 1: Cable Sizing


Input Data system 3 phase

( Uo ) No Load Voltage = 400 V

( P.F ) Power Factor = 1.00

( Vn ) Rated Voltage = 380 V

Ampient Temperature = cº
Max.conductor Temperature = 90 cº
(L) Route length of Cable. = 75 m
( PL ) Load Power = 100 KW

( IL ) Rated Load Current = PL / ( √3 x Vn x PF ) = 152 A

No of Cable or Wire

Cable selection is 1 x ( 4 x 95 mm² )


Current Ampacity of Selected Cable Iz = 258 A

INSTALLATION METHOD INSTALLATION DETAILS

Insaultated Conductor

In Accessible Building Void

Construction cavities and closed cable trenchs

Calculation & formula

Safety factor = 1.00

Tolerance = 2%

De-rated current of cable > Rated Current ( I L ) x O.C.F

160.33 A > 151.93 A (1)

Cable Slection Approved


Step 2:Voltage Drop
( V D % ) total previous voltage drop

1.23 % < 3.0 % (2)

Voltage Drop Approved


Step 3:Short Circuit Check
1.1 According to BS 7430
I t = 56 61
A  10 % safety factor
K (mm2)
where :-
I fault current (KA) 20
t duration of fault current (seconds) 0.20

Cable Can Carry Short Circuit Current


Step 4:Circuit Breaker Slection
Three pole 3 Pole
Isc 25 KA
C.B Current 250 A
Selection of CB Approved

Up

This is initial calculation, This sheet no accurate, where Calculations should be redo with actual derating factors and data as per
material approval brand
where factors different from brand to other
Earthing Conductor Sizing

Project Zeyad Park Index


Designer Aly Abu Alazm
Dated 07.10.2021
Clear Data
Project Period 24 Month

Transformer KVA = KVA

I rated = 0 A

Z impedance = ohm

Short C. Current = - KA

1- CALCULATION OF MAIN EARTHING CONDUCTOR

1.1 According to BS 7430


I Short Cuircuit Current KA
t Fault Time S
T1 Ambient temperature of conductor ( 30 upto 60 ) c
CF + SF Corrotion & Saferty Factor (15% to 20%)
Tolerance

I t
A  = 0 Corrotion & Saferty Factor 0 (mm2)
K

Summary

Standard Cross Section Area of Conductor (CU) 0 mm2


1- CALCULATION OF MAIN EARTHING CONDUCTOR

1.1 According to BS 7430

I t 10 % corrosion tolerance
A  = 59.95 65.94 (mm2)
K
where :-
A cross section area of the main earthing conductor (mm2)
I fault current (ampere) 10000
t duration of fault current (seconds) 1.00
K material coefficient of the main earth conductor (A.sqrt(sec.)/mm2)

K = α * SQRT { LOGe ( ( T2+β ) / (T1+β) ) } 166.81


(for copper)
where :-
T2 maximum permitted final temperature of the conductor ( c ) 240
T1 ambient temperature of the conductor ( c ) 52

SELECTED CROSS SECTION AREA FOR THE MAIN COPPER CONDUCTOR (mm2) = 70.00 (mm2)

NOTE: Metal α β
Copper 226 234.5
EARTH RESISTANCE
CALCULATIONS

Project Zeyad Park Index


Designer Aly Abu Alazm

Dated 07.10.2021
Clear Data
Project Period 24 Month

1 - RESISTANCE OF EARTH FOR SUM OF ROD.


According to BS 7430
The Resistance of a backfilled electrod Rb in Ohms calculated from:

RT 0.00 ohm
ρ Soil resistivity soil (ohm. m)
s Avarage spacing between rod
d Earth rod diameter (m)
L Length of the Rod in metres (m)
n No of Earth Rods
2- RESISTANCE OF THREE RODS OF EQUILATERAL TRIANGLE
According to BS 7430
The Resistance of a backfilled electrod Rb in Ohms calculated from:

1    8L  2 L  
Re  .
 
 Ln  d   1  S  
Rtr = 0.00 ohm
3 2 L    Total of Rtr= 0.00 ohm
ρ Soil resistivity soil (ohm. m)
L Length of the Rod in metres (m)
d Earth rod diameter (m)
S Length of One side of the Equilateral triangle
n No of Earth Rods
N No of Triangle
3- CALCULATION OF EARTH RESISTANCE FOR ROUND CONDUCTOR Conductor Size in mm2
According to BS 7430

Rr = 0.00 ohm
ρ Rho Soil resistivity soil ohm. m
L Total length of conductor meter
h Depth of burial in metres meter
d Cross sectional area of the strip mm2 - meter
4- THE COMBINED EARTH RESISTANCE OF THE RODS & CONDUCTOR (LOOP) AS FOLLOWS

1/R = 1/Rs + 1/Rc +1/TotalRtr

RT = Combined system earth resistance (ohm)


Reqired Rsistance Value ohm

1/RT = 0.00 + 0.00 + 0.00

RT = Complete Data Entry

Summary

Complete Data Entry

Up
LOW CURRENT EARTH RESISTANCE
CALCULATIONS

Project Zeyad Park Index


Designer Aly Abu Alazm

Dated 07.10.2021 Clear Data

Project Period24 Month

3- RESISTANCE OF THREE RODS OF EQUILATERAL TRIANGLE


1     8L  2 L  

According to BS 7430
Re  .  Ln  1
3 2L    d 
The Resistance of a backfilled electrod Rb in Ohms calculated from:
 S  

ρ Soil resistivity soil (ohm. m)


L Length of the Rod in metres (m)
d Earth rod diameter (m)
S Length of One side of the Equilateral triangle
n No of Earth Rods
N No of Triangle
R rquired Reqired earth resistance value

RT = Warning Complete Data Entry ohm

Summary
Enter Required Earth Resistance Value & Complete Data Entry

Up
SINGLE ROD EARTH RESISTANCE
CALCULATIONS

Project Zeyad Park Index


Designer Aly Abu Alazm

Dated 07.10.2021
Clear Data
Project Period
24 Month

1 - CALCULATION OF SINGLE EARTHING ROD RESISTANCE


According to BS 7430

   8L  
Rr  ln   1 0.00
2L   d 
ohm
where :- 
ρ Rho Soil resistivity soil (ohm. m)
L Length of the earth rod (m)
D Earth rod diameter (m)

Summary

Earth Resistance Enter Required Data Ohm


Calculate Conduit Size for Wires / Cables as
per NEC

Project Zeyad Park Index


Designer Aly Abu Alazm
Dated 07.10.2021
Clear Data
Project Period 24 Month

Size Of Cable/Wire Outer Dia of Cable Total Area


No Routting NO Remarks
(Sq.mm) (mm) (Sq.mm)
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
- 0

Select Conduit Size mm

Wall Thickness of Conduit mm


Filling Ratio as per NEC 40%
Acutual Filling Ratio 0% Sq.mm
Summary

Size of Conduit: 0 mm Enter Required Data


TRUNK CALCULATION as per IEEE

Project : Zeyad Park Index


Designer :Aly Abu Alazm
Dated : 07.10.2021 Clear Data
Project Period :24 Month

Wire Data
Out AREA Reqired
No of Future
no CSA/mm2 DIAMETER AREA of WIRE +
Homerun Factor
mm Future Factor
1 - - 0
2 - - 0
3 - - 0
4 - - 0
5 - - 0
6 - - 0
7 - - 0
8 - - 0
Total 0 0 0

Summary

Cable Trunk Size 0 mm

Cable Trunk Thickness 1 mm


Cable Trunk Length mm
Max No of Homerun @ Trunk as
per NEC

Project Zeyad Park Index


Designer Aly Abu Alazm
Dated 07.10.2021
Project Period 24 Month Clear Data

WIRE / CABLE CABLE TRUNK


FILLING
CSA/mm2 DIAMETER/mm AREA / WIRE W H AREA FILLING RATIO
AREA
10 7.0 38 50 50 2500 0.40 1000

Summary

No of Homerun 9
TRUNK CALCULATION as per NEC

Project Zeyad Park Index


Designer Aly Abu Alazm
Dated 07.10.2021
Clear Data
Project Period 24 Month

Wire Data CABLE TRUNK


Out AREA of WIRE Max
No of Wide Height Future Actual
no CSA/mm2 DIAMETER AREA of WIRE + Area Ratio Filling
Homerun mm mm Factor Filling Ratio
mm Future Factor Area
1 - - 0 40% 0 0%
2 - -
3 - -
4 - - Warning slection not match with NEC
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -
15 - -
Total 0 0 0

Summary

Calculation Approved

Cable Trunk Width 0 mm

Cable Trunk Height 0 mm

Cable Trunk Thickness 1 mm

Cable Trunk Length 0.0 Meter


Cable Tray Calculation

Project Zeyad Park

Designer Aly Abu Alazm Index


Dated 07.10.2021
Project Period 24 Month
Clear Data
Cable routting Cable Data

Out NO Weight
Future Tolerance
No From To CSA of Cable/mm2 DIAMETER of /
Factor Factor
mm Cable Metre

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

MIN Width 0 mm
Summary Manual Selection

Cable Tray Width - mm P Cable Tray Width mm

Cable Tray Height 50.0 mm R Cable Tray Height mm

No of Layer - O No of Layer

Cable Tray Weight Cable Tray Weight


Capacity - KG P
Capacity
KG

Cable Tray Type Perforated type O Cable Tray Type

Cable Tray Length Meter S Cable Tray Length Meter


D
` Up
Lighting Protection Calc as per IS-
2309

Project Zeyad Park Index


Designer Aly Abu Alazm

Dated 07.10.2021 Clear Data

Project Period 24 Month

Calculations As per IS-2309 Jignesh.N.Parmar, www.electricalnotes.wordpress.com


Area of Building / Structure:
Length of the Building : (L) Meter
Width of the Building :(W) Meter
Height of the Building: (H) Meter
Lightning Flash Density:
Number of Thunderstorm: (N or Td) Days/Year
Lightning Flash Density : (Ng) 0 km2/Year
Application of Structure :(A) 0
Type of Constructions :(B) 0
Conteats or Consequential Effects: (C) 0
Degree of Isolations: (D) 0
Type of Country: (E) 0
Maximum Acceptable Overall Risk Factor 0.000001 <
Summary

Reqirment Lightning Protection is not Required.

Approxmitly Distance Between Down Conductor 0 Meter

No of Down Conductor 0

Down conductor CSA 0

Network dimention 0 Meter


Lighting Protection Calc as per IEC-
620305

Project Zeyad Park Index


Designer Aly Abu Alazm

Dated 07.10.2021 Clear Data

Project Period 24 Month

Calculations As per IEC 620305


Area of Building / Structure:
Length of the Building : (L) Meter
Width of the Building :(W) Meter
Height of the Building: (H) Meter
Lightning Flash Density:
Number of Thunderstorm: (N) Days/Year
Lightning Flash Density : (Ng) 0 km2/Year

Structure location :(C1) 0

Structure Coffeient: (C3) 0


Structure contents: (C3) 0
Degree of Isolations: (C4) 0
Type of Country: (C5) 0
Coefficient value (E) 0% %
95 > E LEVEL 1 (A)
91 > E <= 95% LEVEL 2 (B)
81 > E <= 90% LEVEL 3 (C)
0 > E <= 80% LEVEL 4 (D)
Summary

LEVEL Not required protection

Air terminal distance each other Not required Meter

Network Dimention Not required Meter

Approxmitly Distance Between Down Conductor Not required Meter

Down Conductor CSA 0 mm2

No of Down Conductor 0
Total of Power Factor Calculation

Project Zeyad Park Index


Designer Aly Abu Alazm
Dated 07.10.2021
Project Period 24 Month Clear Data

Input Power
NO Eqipment name Eq. O/P Power KW Qty Total O/P Power PF Efficiancy
KW old KVAR old KVA old
1 - 0 0 0
2 - 0 0 0
3 - 0 0 0
4 - 0 0 0
5 - 0 0 0
6 - 0 0 0
7 - 0 0 0
8 - 0 0 0
9 - 0 0 0 ###
10 - 0 0 0
11 - 0 0 0
12 - 0 0 0
13 - 0 0 0
14 - 0 0 0
15 - 0 0 0
16 - 0 0 0
17 - 0 0 0
18 - 0 0 0
19 - 0 0 0
20 - 0 0 0
TOTAL 0.00 0.00 0.00 Volt
Equivalent PF 1.000 = 0.00 degree ###

Target PF = 0.00 degree ###

Volt L v

Frequancy hz

KVA old 0.00

KVA new 0.00

KVAR new 0.00

Capacitor Bank Capacity 0.000 KVAR

Capacitance / phase #DIV/0! Farad OR #DIV/0! Micro Farad

` Up
Pole Foundation Sizing

Project Zeyad Park Index


Designer Aly Abu Alazm

Dated 07.10.2021

Project Period 24 Month Clear Data

Jignesh.Parmar ,www.electricalnotes.wordpress.com

Referance: IS 802 PART-1

Pole Detail

1st Part Height: Meter

1st Part Diameter: mm

2nd Part Height: Meter

2nd Part Diameter: mm

3rd Part Height: Meter

3rd Part Diameter: mm

Total Height of Pole: Meter

Self Wieght of Pole: Kg

Other Weights on Pole: Kg

Safety Factor from 1.5 to 2

Foundation Detail

Length: Meter

Width: Meter

Depth: Meter 0.1 fom pole length

Foundation Concreate Weight: Kg/M3

Total Weight (Pole +Foundation) 0 Kg

Stabilizing Moment: 0.00 Kg/Meter

Wind Load Calculation

Wind Zone: 3

Basic Wind Speed (Vb): 44.44 Meter/Second 160 KM/Hr

Co-efficient Factor (K0) 1.375

Risk Co-efficient (K1) 1 Select From Table 1.2

Terrain category (K2) 1 Select From Table 1.3

Calcualted Safety Factor: 0.00


Calculated Safety Factor<Safety Factor
Design is not OK
Up
FIRE ALARM CALCULATION

BATTAERY SIZE OF FIRE ALARM

Project Zeyad Park Index


Designer Aly Abu Alazm
Dated 07.10.2021
Project Period 24 Month
Clear Data

item description standby current QTY TOATAL STANDBY ALARM CURRENT TOTAL ALARM CURRENT

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

TOTAL 0 0

TIME stand by (HOUR) I stand by TOTAL(T1) TALARM (HOUR) I ALARM TOTAL (T2)

24 0.0000 0 0.5 0 0

BATTARY SIZE= 1.25X((T alarmx I alarm)+(T sbyx Isby))

BATTARY SIZE = 0.0 AH

UP
FIRE ALARM CALCULATION
UPS Calculation

Project Zeyad Park Index


Designer Aly Abu Alazm
Dated 07.10.2021
Project Period 24 Month
Clear Data

UPS Slection

NO Eqipment name Eq. Watt Qty Total Watt PF Total VA

- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
TOTAL Load VA 0
Safety Factor
Future Load
Grand Total UPS VA 0

Battary Slection
One Bank AH
No of Bank in Parallel
Bank Volt
Battary Eff
Inverter Eff
Total Backup 0 AH

Backup Time (in hours) = Battery Capacity (in Ah) X Input voltage (V) / Total Load (in VA)
Backup Time (in hours) = 0.00 Minit

Up
`
PANEL BOARD SCHEDULE
DB-GU Index

Project Name : Zeyad Park No O f Way 42 Location GF

Feeder Entrance : Top/Buttom Mounting Flush Nutral SOLID


SUB C.B : MCB Main CB 160 Ground Bar YES

CONDUIT CIRCUIT WIRE CB CB LOAD VA CKT A B C CKT LOAD VA CB CB WIRE


CIRCUIT CONDUIT
DESC. DESC.
SIZE NO mm2 PH AMP A B C NO NO A B C AMP PH mm2 NO SIZE

20mm LI LIGHTING 3*4 1 16 750 1 * 2 450 16 1 3*4 LIGHTING L2 20mm


20mm L3 LIGHTING 3*4 1 16 750 3 * 4 450 16 1 3*4 LIGHTING L4 20mm
20mm L5 LIGHTING 3*4 1 16 850 5 * 6 750 16 1 3*4 LIGHTING L6 20mm
20mm L7 LIGHTING 3*4 1 16 850 7 * 8 750 16 1 3*4 LIGHTING L8 20mm
20mm L9 LIGHTING 3*4 1 16 450 9 * 10 700 16 1 3*4 LIGHTING L10 20mm
20mm L11 LIGHTING 3*4 1 16 450 11 * 12 700 16 1 3*4 LIGHTING L12 20mm
20mm L13 LIGHTING 3*4 1 16 450 13 * 14 750 16 1 3*4 LIGHTING L14 20mm
20mm L15 LIGHTING 3*4 1 16 450 15 * 16 750 16 1 3*4 LIGHTING L16 20mm
20mm L17 LIGHTING 3*4 1 16 850 17 * 18 450 16 1 3*4 LIGHTING L18 20mm
20mm L19 LIGHTING 3*4 1 16 500 19 * 20 450 16 1 3*4 LIGHTING L20 20mm
20mm L21 LIGHTING 3*4 1 16 750 21 * 22 360 16 1 3*4 LIGHTING L22 20mm
20mm L23 LIGHTING 3*4 1 16 750 23 * 24 360 16 1 3*4 LIGHTING L24 20mm
20mm L25 LIGHTING 3*4 1 16 800 25 * 26 800 16 1 3*4 LIGHTING L26 20mm
20mm L27 LIGHTING 3*4 1 16 800 27 * 28 800 16 1 3*4 LIGHTING L28 20mm
20mm L29 LIGHTING 3*4 1 16 625 29 * 30 825 16 1 3*4 LIGHTING L30 20mm
20mm L31 LIGHTING 3*4 1 16 625 31 * 32 825 16 1 3*4 LIGHTING L32 20mm
20mm L33 LIGHTING 3*4 1 16 875 33 * 34 575 16 1 3*4 LIGHTING L34 20mm
20mm L35 LIGHTING 3*4 1 16 875 35 * 36 575 16 1 3*4 LIGHTING L36 20mm
20mm L37 LIGHTING 3*4 1 16 450 37 * 38 800 20 1 3*4 SOCKET S2 20mm
20mm L39 LIGHTING 3*4 1 16 450 39 * 40 800 20 1 3*4 SOCKET S4 20mm
20mm SI SOCKET 3*4 1 20 700 41 * 42 700 20 1 3*4 SOCKET S6 20mm
20mm S3 SOCKET 3*4 1 20 7000 43 * 44 700 20 1 3*4 SOCKET S8 20mm
20mm S5 SOCKET 3*4 1 20 7000 45 * 46 750 20 1 3*4 kitchen sock. K1 20mm
20mm S7 SOCKET 3*4 1 20 5000 47 * 48 750 20 1 3*4 kitchen sock. K2 20mm
1 16 10000 49 * 50 750 20 1 ###
SPARE 1 16 10000 51 * 52 750 20 1 SPARE ###
1 16 10000 53 * 54 20 1 ###
55 * 56
Spare 1 16 57 * 58 20 1 Spare
59 * 60
61 * 62
Spare 1 16 63 * 64 20 1 Spare
65 * 66
67 * 68
Space 69 * 70 Space
71 * 72
SUB TOTAL 21425 21525 20100 6275 5935 5110
A B C Volt 380 V
Connected Load /Phase
27700 27460 25210 Frequancy 60 HZ
Total Connected Load KVA 80.37 MCB SC current 10 KA
DF 1 Main Breaker Current 152 AMP
Total Demand Load KVA 80
Avaliable Circuit Breaker Rating 160 AMP
Phase Balance Ratio 10% Phases Ballnce
Current 122 Feeder 4*70mm2CU
Feeder insulation XLPE/PVC
Circuit Breaker I SC KA 25 Earth Conductor 16mm2
Referance Table As per BS EN 620305

Thunder Storm Days / Year Lightning Flash Density (Flashes to Ground /km2/year) Lightning Flash Density (Flashes to Ground /km2/year) As per
IS:2309
5 0.3 0.2
10 0.71 0.5
15 1.18
20 1.69 1.1
25 2.24
30 2.81 1.9
35 3.41
40 4.02 2.8
45 4.66
50 5.32 3.7
55 5.99
60 6.68 4.7
65 7.38
70 8.1
75 8.83
80 9.57 6.9
85 10.32
90 11.09
95 11.86
100 12.65 9.2
spcial qty 6.9 Variable
Referance Table As per IS:2309
Application of Structure Factor
Houses & Buildings 0.3
Houses & Buildings with outside aerial 0.7
Factories / workshop/ Laboratories 1
Office blocks / Hotel 1.2
Block of Flats / Residences Building 1.2
Churches/ Hall / Theatres / Museums, Exhibitions 1.3
Departmental stores / Post Offices 1.3
Stations / Airports / Stadium 1.3
Schools / Hospitals / Children's Home 1.7
Others 1.2

Type of Constructions Factor


Steel framed encased without Metal Roof 0.2
Reinforced concrete without Metal Roof 0.4
Steel framed encased with Metal Roof 0.8
Reinforced concrete with Metal Roof 1
Brick / Plain concrete or masonry without Metal Roof 1.4
Timber framed or clad without Metal Roof 1.7
Brick / Plain concrete or masonry with Metal Roof 2
Timber framed or clad with Metal Roof

Conteats or Consequential Effects Factor


Domestic / Office Buildings 0.3
Factories / Workshop 0.3
Industrial & Agricultural Buildings 0.8
Power stations / Gas works 1
Telephone exchange / Radio Station 1
Industrial key plants, Ancient monuments 1.3
Historic Buildings / Museums / Art Gallaries 1.3
Schools / hoapitals / Childern Homes 1.7

Degree of Isolations Factor


Structure in a large area having greater height 0.4
Structure located in a area of the same height 1
Structure completely Isolated 2

Type of Country Factor


Flat country at any level 0.3
Hill country 1
Mountain country between 300m and 900m 1.3
Mountain country above 900m 1.7
Referance Table Referance Table As per BS EN 62305 & NFPA 2011

C1 Structure location‫مكان المنشأة‬ Factor


Structure surrounded by other structures or trees of comparable height or higher
0.25
Structure surrounded by lower structures
0.5
At distance of 3H from Structure no Structure exists
1
Single Structure on elevation or headland (point)
2

C2 STRUCTURE COFFIENT Factor


Metal building with metal roof 0.5
Metal building with common roof 1
Metal building with flemable roof 2
common building with metal roof 1
common building with common roof 1
common building with flemable roof 2.5
flemable building with metal roof 2
flemable building with common roof 2.5
flemable building with flemable roof 3

C3 Structure contents‫المادة المصنع منها المنشأة‬ Factor

No value and no flammable 0.5


Standard value and normally flammable 1
High value and particular flammable 2
Exception value, irrepaceable and highly flammable, explosive 3

C4 Structure occupancy‫درجة اشغال المنشأة‬ Factor


Unoccupied 0.5
Normally occupied 1
Difficult evacuation or risk of panic 3

C5 Lightning stroke consequences ‫العواقب الناتجة بعد حدوث الصواعق‬ Factor

Service continuity not required and no consequences


1
on environment. ‫ال يتطلب صيانة مستمرة وكذلك ال تؤثر على البيئة‬
Service continuity required ,and no consequences
5
on environment‫تتطلب صيانة مستمرة وال تؤثر على البيئة‬
Consequences on environment ‫تؤثر على البيئة‬ 10

Air terminal to each other


LEVEL METER
LEVEL 1 (A) 10
LEVEL 2 (B) 10
LEVEL 3 (C) 10
LEVEL 4 (D) 10

Distance between down conductor (min 2 down conductor)


LEVEL METER
LEVEL 1 (A) 10
LEVEL 2 (B) 10
LEVEL 3 (C) 15
LEVEL 4 (D) 20
Thunder Storm Days / Lightning Flash Density (Flashes to
Year Ground /km2/year)
5 0.3
10 0.71
15 1.18
20 1.69
25 2.24
30 2.81
35 3.41
40 4.02
45 4.66
50 5.32
55 5.99
60 6.68
65 7.38
70 8.1
75 8.83
80 9.57

85 10.32
90 11.09
95 11.86
100 12.65
spcial qty 16 veriable

Network dimention

LEVEL METER

LEVEL 1 (A) 5*5

LEVEL 2 (B) 10*10


LEVEL 3 (C) 15*15
LEVEL 4 (D) 20*20

E = 1-NC/ND

Ac = LW+6H(L+W)+3.14*9*H*H
Nc = 5.5*10e-3/(C2*C3*C4*C5)
Nd = Ng*Ac*C1*10E-6

You might also like