0% found this document useful (0 votes)
8 views10 pages

Reinfrocment Bar For Conversion Re Bar Converted - 10

The document details the specifications and calculations for the Megenagna ST Estifanos Station project, including wall dimensions and reinforcement bar requirements. It outlines the number of bars, their dimensions, lengths, and total weight for various sections of the project. The total weight of materials required is calculated to be 1,493.85 kg.

Uploaded by

esk.adm2020
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views10 pages

Reinfrocment Bar For Conversion Re Bar Converted - 10

The document details the specifications and calculations for the Megenagna ST Estifanos Station project, including wall dimensions and reinforcement bar requirements. It outlines the number of bars, their dimensions, lengths, and total weight for various sections of the project. The total weight of materials required is calculated to be 1,493.85 kg.

Uploaded by

esk.adm2020
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

1

Pad-1
Project: Megenagna ST Estifanos Station L W
Client: AACRA 0+000.00 0+001.49 1.49 2.60
Consultant:VALUE ENGINEERING
Diamension of wall F1 F2 S1 S2
H 3.19 L1 L2 L3 Total L1 L3 Total L1 L2 Total L1 L2 Total
T1 0.25 0.18 2.50 0.30 2.98 2.50 0.28 2.78 1.28 0.40 1.68 0.78 0.15 0.93
T2 0.40
T3 0.30
T5 0.40 a 1.28 S5 K S3 S4
T7 0.60 b 0.78 L1 Total L1 L3 Total L1 L2 Total L1 L2 Total
T8 0.35 H* 2.77 2.77 0.20 0.53 0.73 2.77 - 2.77 2.67 - 2.67
L1 2.20
L 2.60

No.of bars L E N G T H (m)


Dia. Length Span Spacing No. of Bars No.of Total
Sn. Description As per
(mm) (m) (m) (m) Calculated Elem. No.of bars 8 mm 10 mm 12 mm 14 mm 16 mm 20 mm 24 mm 32 mm
Design

BAR TYPE
1.00 F1 16 2.98 1.49 0.17 10 10 1 10 29.10
2.00 F2 16 2.78 1.49 0.30 6 6 1 6 16.59
3.00 K 12 0.73 1.49 0.25 7 7 1 7 5.08
4.00 S1 16 1.68 1.49 0.14 12 12 1 12 19.56
5.00 S2 12 0.93 1.49 0.30 6 6 1 6 5.55
6.00 S3 16 2.77 1.49 0.28 6 6 1 6 17.48
7.00 S4 16 2.67 1.49 0.28 6 6 1 6 16.85
8.00 S5 10 2.77 1.49 0.21 8 8 1 8 22.54
Total Length - 22.54 10.63 - 99.57 - - -
Unit wt/ml 0.395 0.617 0.888 1.208 1.578 2.466 3.551 6.315
Total Kg - 13.91 9.44 - 157.12 - - -

Total (kg) 180.47

Prepared by (Contractor) Checked by (Contractor) Checked by (Consultant)

____________________ __________________ ___________________


2

Pad-1
Project: Megenagna ST Estifanos Station L W
Client: AACRA 0+001.49 0+012.32 10.83 2.60
Consultant:VALUE ENGINEERING
Diamension of wall F1 F2 S1 S2
H 3.40 L1 L2 L3 Total L1 L3 Total L1 L2 Total L1 L2 Total
T1 0.25 0.18 2.50 0.30 2.98 2.50 0.28 2.78 1.28 0.40 1.68 0.78 0.15 0.93
T2 0.40
T3 0.30
T5 0.40 a 1.28 S5 K S3 S4
T7 0.60 b 0.78 L1 Total L1 L3 Total L1 L2 Total L1 L2 Total
T8 0.35 H* 2.98 2.98 0.20 0.53 0.73 2.98 - 2.98 2.88 - 2.88
L1 2.20
L 2.60

No.of bars L E N G T H (m)


Dia. Length Span Spacing No. of Bars No.of Total
Sn. Description As per
(mm) (m) (m) (m) Calculated Elem. No.of bars 8 mm 10 mm 12 mm 14 mm 16 mm 20 mm 24 mm 32 mm
Design

BAR TYPE
1.00 F1 16 2.98 10.83 0.17 65 65 1 65 192.82
2.00 F2 16 2.78 10.83 0.30 37 37 1 37 103.14
3.00 K 12 0.73 10.83 0.25 44 44 1 44 32.38
4.00 S1 16 1.68 10.83 0.14 78 78 1 78 131.64
5.00 S2 12 0.93 10.83 0.30 37 37 1 37 34.50
6.00 S3 16 2.98 10.83 0.28 40 40 1 40 118.04
7.00 S4 16 2.88 10.83 0.28 40 40 1 40 114.08
8.00 S5 10 2.98 10.83 0.21 53 53 1 53 157.63
9.00 Distn(Wall) F 10 12.00 3.00 0.30 11 11 1 11 132.00
10.00 Distn(Wall) B 10 12.00 3.00 0.30 11 11 1 11 132.00
11.00 Distn(pad) Tp 10 12.00 2.20 0.30 8 8 1 8 100.00
12.00 Distn(pad) BT 10 12.00 2.60 0.30 10 10 1 10 116.00

Total Length - 637.63 66.88 - 659.72 - - -


Unit wt/ml 0.395 0.617 0.888 1.208 1.578 2.466 3.551 6.315
Total Kg - 393.42 59.39 - 1,041.04 - - -

Total (kg) 1,493.85

Prepared by (Contractor) Checked by (Contractor) Checked by (Consultant)

____________________ __________________ ___________________


3

Pad-2
Project: Megenagna ST Estifanos Station L W
Client: AACRA 0+015.00 0+025.00 10.00 2.60
Consultant:VALUE ENGINEERING
Diamension of wall F1 F2 S1 S2
H 3.50 L1 L2 L3 Total L1 L3 Total L1 L2 Total L1 L2 Total
T1 0.25 0.18 2.50 0.30 2.98 2.50 0.28 2.78 1.28 0.40 1.68 0.78 0.15 0.93
T2 0.40
T3 0.30
T5 0.40 a 1.28 S5 K S3 S4
T7 0.60 b 0.78 L1 Total L1 L3 Total L1 L2 Total L1 L2 Total
T8 0.35 H* 3.08 3.08 0.20 0.53 0.73 3.08 - 3.08 2.98 - 2.98
L1 2.20
L 2.60
No.of bars
Dia. Length Span Spacing No. of Bars No.of Total L E N G T H (m)
Sn. Description As per
(mm) (m) (m) (m) Calculated Elem. No.of bars 8 mm 10 mm 12 mm 14 mm 16 mm 20 mm 24 mm 32 mm
Design
BAR TYPE
1.00 F1 16 2.98 10.00 0.17 60 60 1 60 178.27
2.00 F2 16 2.78 10.00 0.30 34 34 1 34 95.45
3.00 K 12 0.73 10.00 0.25 41 41 1 41 29.95
4.00 S1 16 1.68 10.00 0.14 72 72 1 72 121.68
5.00 S2 12 0.93 10.00 0.30 34 34 1 34 31.93
6.00 S3 16 3.08 10.00 0.28 37 37 1 37 112.90
7.00 S4 16 2.98 10.00 0.28 37 37 1 37 109.23
8.00 S5 10 3.08 10.00 0.21 49 49 1 49 150.68
9.00 Distn(Wall) F 10 9.51 3.10 0.25 1 1 1 1 9.51
10 9.61 3.10 0.25 1 1 1 1 9.61
10 9.71 3.10 0.25 1 1 1 1 9.71
10 9.81 3.10 0.25 1 1 1 1 9.81
10 9.91 3.10 0.25 1 1 1 1 9.91
10 10.00 3.10 0.25 1 1 1 1 10.00
10 10.10 3.10 0.25 1 1 1 1 10.10
10 10.10 3.10 0.25 1 1 1 1 10.10

Prepared by (Contractor) Checked by (Contractor) Checked by (Consultant)

____________________ __________________ ___________________


4

Pad-2
Project: Megenagna ST Estifanos Station L W
Client: AACRA 0+015.00 0+025.00 10.00 2.60
Consultant:VALUE ENGINEERING
Diamension of wall F1 F2 S1 S2
H 3.50 L1 L2 L3 Total L1 L3 Total L1 L2 Total L1 L2 Total
T1 0.25 0.18 2.50 0.30 2.98 2.50 0.28 2.78 1.28 0.40 1.68 0.78 0.15 0.93
T2 0.40
T3 0.30
T5 0.40 a 1.28 S5 K S3 S4
T7 0.60 b 0.78 L1 Total L1 L3 Total L1 L2 Total L1 L2 Total
T8 0.35 H* 3.08 3.08 0.20 0.53 0.73 3.08 - 3.08 2.98 - 2.98
L1 2.20
L 2.60
No.of bars
Dia. Length Span Spacing No. of Bars No.of Total L E N G T H (m)
Sn. Description As per
(mm) (m) (m) (m) Calculated Elem. No.of bars 8 mm 10 mm 12 mm 14 mm 16 mm 20 mm 24 mm 32 mm
Design
10 10.10 3.10 0.25 1 1 1 1 10.10
10 10.33 3.10 0.25 1 1 1 1 10.33

10.00 Distn(Wall) B 10 9.51 3.10 0.30 1 1 1 1 9.51


10 9.61 3.10 0.30 1 1 1 1 9.61
10 9.71 3.10 0.30 1 1 1 1 9.71
10 9.81 3.10 0.30 1 1 1 1 9.81
10 9.91 3.10 0.30 1 1 1 1 9.91
10 10.00 3.10 0.30 1 1 1 1 10.00
10 10.10 3.10 0.30 1 1 1 1 10.10
10 10.10 3.10 0.30 1 1 1 1 10.10
10 10.10 3.10 0.30 1 1 1 1 10.10
10 10.33 3.10 0.30 1 1 1 1 10.33

11.00 Distn(pad) Tp 10 9.51 2.20 0.30 1 1 1 1 9.51


0 9.61 2.20 0.30 1 1 1 1
10 9.71 2.20 0.30 1 1 1 1 9.71
10 9.81 2.20 0.30 1 1 1 1 9.81

Prepared by (Contractor) Checked by (Contractor) Checked by (Consultant)

____________________ __________________ ___________________


5

Pad-2
Project: Megenagna ST Estifanos Station L W
Client: AACRA 0+015.00 0+025.00 10.00 2.60
Consultant:VALUE ENGINEERING
Diamension of wall F1 F2 S1 S2
H 3.50 L1 L2 L3 Total L1 L3 Total L1 L2 Total L1 L2 Total
T1 0.25 0.18 2.50 0.30 2.98 2.50 0.28 2.78 1.28 0.40 1.68 0.78 0.15 0.93
T2 0.40
T3 0.30
T5 0.40 a 1.28 S5 K S3 S4
T7 0.60 b 0.78 L1 Total L1 L3 Total L1 L2 Total L1 L2 Total
T8 0.35 H* 3.08 3.08 0.20 0.53 0.73 3.08 - 3.08 2.98 - 2.98
L1 2.20
L 2.60
No.of bars
Dia. Length Span Spacing No. of Bars No.of Total L E N G T H (m)
Sn. Description As per
(mm) (m) (m) (m) Calculated Elem. No.of bars 8 mm 10 mm 12 mm 14 mm 16 mm 20 mm 24 mm 32 mm
Design
10 9.91 2.20 0.30 1 1 1 1 9.91
10 10.00 2.20 0.30 1 1 1 1 10.00
10 10.10 2.20 0.30 1 1 1 1 10.10
10 10.10 2.20 0.30 1 1 1 1 10.10
10 10.10 2.20 0.30 1 1 1 1 10.10
10 10.33 2.20 0.30 1 1 1 1 10.33

12.00 Distn(pad) BT 10 9.51 2.60 0.25 1 1 1 1 9.51


10 9.61 2.60 0.25 1 1 1 1 9.61
10 9.71 2.60 0.25 1 1 1 1 9.71
10 9.81 2.60 0.25 1 1 1 1 9.81
10 9.91 2.60 0.25 1 1 1 1 9.91
10 10.00 2.60 0.25 1 1 1 1 10.00
10 10.10 2.60 0.25 1 1 1 1 10.10
10 10.10 2.60 0.25 1 1 1 1 10.10
10 10.10 2.60 0.25 1 1 1 1 10.10
10 10.33 2.60 0.25 1 1 1 1 10.33

Total Length - 537.79 61.88 - 617.52 - - -


Unit wt/ml 0.395 0.617 0.888 1.208 1.578 2.466 3.551 6.315
Total Kg - 331.81 54.95 - 974.45 - - -

Total (kg) 1,361.22

Prepared by (Contractor) Checked by (Contractor) Checked by (Consultant)

____________________ __________________ ___________________


6

Pad-3
Project: Megenagna ST Estifanos Station L W
Client: AACRA 0+025.00 0+031.49 6.49 2.60
Consultant:VALUE ENGINEERING
Diamension of wall F1 F2 S1 S2
H 3.33 L1 L2 L3 Total L1 L3 Total L1 L2 Total L1 L2 Total
T1 0.25 0.18 2.50 0.30 2.98 2.50 0.28 2.78 1.28 0.40 1.68 0.78 0.15 0.93
T2 0.40
T3 0.30
T5 0.40 a 1.28 S5 K S3 S4
T7 0.60 b 0.78 L1 Total L1 L3 Total L1 L2 Total L1 L2 Total
T8 0.35 H* 2.91 2.91 0.20 0.53 0.73 2.91 - 2.91 2.81 - 2.81
L1 2.20
L 2.60

No.of bars L E N G T H (m)


Dia. Length Span Spacing No. of Bars No.of Total
Sn. Description As per
(mm) (m) (m) (m) Calculated Elem. No.of bars 8 mm 10 mm 12 mm 14 mm 16 mm 20 mm 24 mm 32 mm
Design

BAR TYPE
1.00 F1 16 2.98 6.49 0.17 39 39 1 39 116.75
2.00 F2 16 2.78 6.49 0.30 23 23 1 23 62.92
3.00 K 12 0.73 6.49 0.25 27 27 1 27 19.70
4.00 S1 16 1.68 6.49 0.14 47 47 1 47 79.56
5.00 S2 12 0.93 6.49 0.30 23 23 1 23 21.05
6.00 S3 16 2.91 6.49 0.28 24 24 1 24 70.24
7.00 S4 16 2.81 6.49 0.28 24 24 1 24 67.82
8.00 S5 10 2.91 6.49 0.21 32 32 1 32 92.68
Total Length - 92.68 40.75 - 397.29 - - -
Unit wt/ml 0.395 0.617 0.888 1.208 1.578 2.466 3.551 6.315
Total Kg - 57.19 36.18 - 626.92 - - -

Total (kg) 720.29

Prepared by (Contractor) Checked by (Contractor) Checked by (Consultant)

____________________ __________________ ___________________


7

Pad-3
Project: Megenagna ST Estifanos Station L W
Client: AACRA 0+031.49 0+040.00 8.51 2.60
Consultant:VALUE ENGINEERING
Diamension of wall F1 F2 S1 S2
H 3.12 L1 L2 L3 Total L1 L3 Total L1 L2 Total L1 L2 Total
T1 0.25 0.18 2.50 0.30 2.98 2.50 0.28 2.78 1.28 0.40 1.68 0.78 0.15 0.93
T2 0.40
T3 0.30
T5 0.40 a 1.28 S5 K S3 S4
T7 0.60 b 0.78 L1 Total L1 L3 Total L1 L2 Total L1 L2 Total
T8 0.35 H* 2.70 2.70 0.20 0.53 0.73 2.70 - 2.70 2.60 - 2.60
L1 2.20
L 2.60

No.of bars L E N G T H (m)


Dia. Length Span Spacing No. of Bars No.of Total
Sn. Description As per
(mm) (m) (m) (m) Calculated Elem. No.of bars 8 mm 10 mm 12 mm 14 mm 16 mm 20 mm 24 mm 32 mm
Design

BAR TYPE
1.00 F1 16 2.98 8.51 0.17 51 51 1 51 152.16
2.00 F2 16 2.78 8.51 0.30 29 29 1 29 81.64
3.00 K 12 0.73 8.51 0.25 35 35 1 35 25.60
4.00 S1 16 1.68 8.51 0.14 62 62 1 62 103.80
5.00 S2 12 0.93 8.51 0.30 29 29 1 29 27.31
6.00 S3 16 2.70 8.51 0.28 31 31 1 31 84.60
7.00 S4 16 2.60 8.51 0.28 31 31 1 31 81.46
8.00 S5 10 2.70 8.51 0.21 42 42 1 42 111.91
9.00 Distn(Wall) F 10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 4.90 2.72 0.30 1 1 1 1 4.90
10 5.00 2.72 0.30 1 1 1 1 5.00
10 5.09 2.72 0.30 1 1 1 1 5.09
10 5.19 2.72 0.30 1 1 1 1 5.19
10 5.29 2.72 0.30 1 1 1 1 5.29
10 5.39 2.72 0.30 1 1 1 1 5.39
10 5.49 2.72 0.30 1 1 1 1 5.49
10 6.30 2.72 0.30 1 1 1 1 6.30
10 5.69 2.72 0.30 1 1 1 1 5.69

Prepared by (Contractor) Checked by (Contractor) Checked by (Consultant)

____________________ __________________ ___________________


8

Pad-3
Project: Megenagna ST Estifanos Station L W
Client: AACRA 0+031.49 0+040.00 8.51 2.60
Consultant:VALUE ENGINEERING
Diamension of wall F1 F2 S1 S2
H 3.12 L1 L2 L3 Total L1 L3 Total L1 L2 Total L1 L2 Total
T1 0.25 0.18 2.50 0.30 2.98 2.50 0.28 2.78 1.28 0.40 1.68 0.78 0.15 0.93
T2 0.40
T3 0.30
T5 0.40 a 1.28 S5 K S3 S4
T7 0.60 b 0.78 L1 Total L1 L3 Total L1 L2 Total L1 L2 Total
T8 0.35 H* 2.70 2.70 0.20 0.53 0.73 2.70 - 2.70 2.60 - 2.60
L1 2.20
L 2.60

No.of bars L E N G T H (m)


Dia. Length Span Spacing No. of Bars No.of Total
Sn. Description As per
(mm) (m) (m) (m) Calculated Elem. No.of bars 8 mm 10 mm 12 mm 14 mm 16 mm 20 mm 24 mm 32 mm
Design
10 4.90 2.72 0.30 1 1 1 1 4.90
10 4.90 2.72 0.30 1 1 1 1 4.90
10.00 Distn(Wall) B 10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 12.00 2.72 0.30 1 1 1 1 12.00
10 4.90 2.72 0.30 1 1 1 1 4.90
10 5.00 2.72 0.30 1 1 1 1 5.00
10 5.09 2.72 0.30 1 1 1 1 5.09
10 5.19 2.72 0.30 1 1 1 1 5.19
10 5.29 2.72 0.30 1 1 1 1 5.29
10 5.39 2.72 0.30 1 1 1 1 5.39
10 5.49 2.72 0.30 1 1 1 1 5.49
10 6.30 2.72 0.30 1 1 1 1 6.30
10 5.69 2.72 0.30 1 1 1 1 5.69
10 4.90 2.72 0.30 1 1 1 1 4.90
10 4.90 2.72 0.30 1 1 1 1 4.90
11.00 Distn(pad) Tp 10 12.00 2.20 0.30 1 1 1 1 12.00
10 12.00 2.20 0.30 1 1 1 1 12.00
10 12.00 2.20 0.30 1 1 1 1 12.00
10 12.00 2.20 0.30 1 1 1 1 12.00
10 12.00 2.20 0.30 1 1 1 1 12.00
10 12.00 2.20 0.30 1 1 1 1 12.00

Prepared by (Contractor) Checked by (Contractor) Checked by (Consultant)

____________________ __________________ ___________________


9

Pad-3
Project: Megenagna ST Estifanos Station L W
Client: AACRA 0+031.49 0+040.00 8.51 2.60
Consultant:VALUE ENGINEERING
Diamension of wall F1 F2 S1 S2
H 3.12 L1 L2 L3 Total L1 L3 Total L1 L2 Total L1 L2 Total
T1 0.25 0.18 2.50 0.30 2.98 2.50 0.28 2.78 1.28 0.40 1.68 0.78 0.15 0.93
T2 0.40
T3 0.30
T5 0.40 a 1.28 S5 K S3 S4
T7 0.60 b 0.78 L1 Total L1 L3 Total L1 L2 Total L1 L2 Total
T8 0.35 H* 2.70 2.70 0.20 0.53 0.73 2.70 - 2.70 2.60 - 2.60
L1 2.20
L 2.60

No.of bars L E N G T H (m)


Dia. Length Span Spacing No. of Bars No.of Total
Sn. Description As per
(mm) (m) (m) (m) Calculated Elem. No.of bars 8 mm 10 mm 12 mm 14 mm 16 mm 20 mm 24 mm 32 mm
Design
10 12.00 2.20 0.30 1 1 1 1 12.00
10 12.00 2.20 0.30 1 1 1 1 12.00
10 12.00 2.20 0.30 1 1 1 1 12.00
10 12.00 2.20 0.30 1 1 1 1 12.00
10 12.00 2.20 0.30 1 1 1 1 12.00
10 4.90 2.20 0.30 1 1 1 1 4.90
10 5.00 2.20 0.30 1 1 1 1 5.00
10 5.09 2.20 0.30 1 1 1 1 5.09
10 5.19 2.20 0.30 1 1 1 1 5.19
10 5.29 2.20 0.30 1 1 1 1 5.29
10 5.39 2.20 0.30 1 1 1 1 5.39
10 5.49 2.20 0.30 1 1 1 1 5.49
10 6.30 2.20 0.30 1 1 1 1 6.30
10 5.69 2.20 0.30 1 1 1 1 5.69
10 4.90 2.20 0.30 1 1 1 1 4.90
10 4.90 2.20 0.30 1 1 1 1 4.90

12.00 Distn(pad) BT 10 12.00 2.60 0.25 1 1 1 1 12.00


10 12.00 2.20 0.25 1 1 1 1 12.00
10 12.00 2.60 0.25 1 1 1 1 12.00
10 12.00 2.60 0.25 1 1 1 1 12.00
10 12.00 2.60 0.25 1 1 1 1 12.00
10 12.00 2.60 0.25 1 1 1 1 12.00
10 12.00 2.60 0.25 1 1 1 1 12.00
10 12.00 2.60 0.25 1 1 1 1 12.00
10 12.00 2.60 0.25 1 1 1 1 12.00
10 12.00 2.60 0.25 1 1 1 1 12.00
10 12.00 2.60 0.25 1 1 1 1 12.00
10 4.90 2.60 0.25 1 1 1 1 4.90
10 5.00 2.60 0.25 1 1 1 1 5.00

Prepared by (Contractor) Checked by (Contractor) Checked by (Consultant)

____________________ __________________ ___________________


10

Pad-3
Project: Megenagna ST Estifanos Station L W
Client: AACRA 0+031.49 0+040.00 8.51 2.60
Consultant:VALUE ENGINEERING
Diamension of wall F1 F2 S1 S2
H 3.12 L1 L2 L3 Total L1 L3 Total L1 L2 Total L1 L2 Total
T1 0.25 0.18 2.50 0.30 2.98 2.50 0.28 2.78 1.28 0.40 1.68 0.78 0.15 0.93
T2 0.40
T3 0.30
T5 0.40 a 1.28 S5 K S3 S4
T7 0.60 b 0.78 L1 Total L1 L3 Total L1 L2 Total L1 L2 Total
T8 0.35 H* 2.70 2.70 0.20 0.53 0.73 2.70 - 2.70 2.60 - 2.60
L1 2.20
L 2.60

No.of bars L E N G T H (m)


Dia. Length Span Spacing No. of Bars No.of Total
Sn. Description As per
(mm) (m) (m) (m) Calculated Elem. No.of bars 8 mm 10 mm 12 mm 14 mm 16 mm 20 mm 24 mm 32 mm
Design
10 5.09 2.60 0.25 1 1 1 1 5.09
10 5.19 2.60 0.25 1 1 1 1 5.19
10 5.29 2.60 0.25 1 1 1 1 5.29
10 5.39 2.60 0.25 1 1 1 1 5.39
10 5.49 2.60 0.25 1 1 1 1 5.49
10 6.30 2.60 0.25 1 1 1 1 6.30
10 5.69 2.60 0.25 1 1 1 1 5.69
10 4.90 2.60 0.25 1 1 1 1 4.90
10 4.90 2.60 0.25 1 1 1 1 4.90

Total Length - 872.47 52.91 - 503.66 - - -


Unit wt/ml 0.395 0.617 0.888 1.208 1.578 2.466 3.551 6.315
Total Kg - 538.31 46.99 - 794.78 - - -

Total (kg) 1,380.08

Prepared by (Contractor) Checked by (Contractor) Checked by (Consultant)