Index Format
Index Format
vi
3.6.4 Group Dependencies
3.7 Project/Internship Scheduling (Gantt Chart/Network Chart)
Chapter 4 System Analysis
4.1 Study of Current System
4.2 Problem and Weaknesses of Current System
4.3 Requirements of New System
4.4 System Feasibility
Does the system contribute to the overall objectives of
4.6.1
the organization?
Can the system be implemented using the current
4.6.2 technology and within the given cost and schedule
constraints
Can the system be integrated with other systems which
4.6.3
are already in place?
4.5 Activity / Process in New System / Proposed System
4.6 Features of New System / Proposed System
List Main Modules / Components / Processes / Techniques of
4.7
New System / Proposed System
Selection of Hardware / Software / Algorithms / Methodology
4.8
/ Techniques / Approaches and Justification
Chapter 6 Implementation
6.1 Implementation Platform / Environment
6.2 Process / Program / Technology / Modules Specification(s)
vii
6.3 Finding / Results / Outcomes
6.4 Result Analysis / Comparison / Deliberations
Chapter 7 Testing
7.1 Testing Plan / Strategy
7.2 Test Results and Analysis
Test Cases (test ID, test condition, expected output,
7.2.1
actual output, remark)
viii