1. Objective: -
2. Requirement Analysis :-
3. Project Approach :-
3.1.1 Planning
3.2.1 Designing
This part contains how the project will be designed. Mainly it is based upon
the requirements of the user, the programmer have to do as the client says.
What kind of things he need in the project, what kind of appearance he needs.
3.2.2 Implementation
Implementation contains all the coding part of the project. If it’s a large
project, a team is required to accomplish it otherwise a single person can also
complete the project according to the need of client.
3.2.3 Testing
This phase contains the testing of the project before handling it to the client.
All the aspects of the project are check, whether the project is working fine or
there is any error, if any then it can be removed before handling the project to
the client.
Installation contains all the steps like the installation of all the needs of the
software as required by the project. We have to provide everything to the user
even the software and also teach them how to use the project and what to
enter where.
3.3.2 Documentation
Documentation contains all the documents of the project, how to use it, what
are the software and hardware requirements to run the project. Even the
introduction to project and the build team.
3.3.3 Training
In this the client is trained on how to use the project and what to enter where.
4. Maintenance :-
4.1 Updates
We will provide all the updates for the project to fix all the issues and bugs etc.
All the new things will be added to the product with the update.
The update can be optional as well as mandatory. The Updates will contain all the
new things added to product and fix any problem.
In this the bugs in the project are fixed, they can either be fixed with update or either
with the help of any software developer.
Mainly the updates fix all the bugs, because they are released to fix all the bugs and
problems of the product.
5. Rules And Responsibility :-
6. Cost Estimate :-
• The statistics used in preparing the estimates are accurate within a given percent.
• The cost estimate will depend upon the work of project and the staff.
7. Project Constraints :-
The project should have been modified a bit more, like all details should be shown
somewhere about the doctors, patients and other details.
The details of the doctor should be displayed on the screen when diagnosing the patient.