CHAPTER 2 PREVIEW
• Distinguish among predictive, iterative, incremental, and agile project life cycles as
well as hybrid approaches.
• Discover how to split projects into phases to enable incremental value delivery using
any type of project life cycle.
• Explore what is done during the overlapping Process Groups of Initiating, Planning,
Executing, Monitoring and Controlling, and Closing.
• Understand the Agile Manifesto and the principles that underly agile project
management methodologies.
• Discover the benefits of learning about unfamiliar project methodologies.
This chapter addresses the basics of the project life cycles, project phases, and Process
Groups. Topic 1 introduces project life cycles and phases. The second and third topics
address life cycles in more detail. Topic 2 presents core concepts of predictive projects,
including introducing the Process Groups, while Topic 3 presents the core concepts of
agile and hybrid projects.
Note that this chapter is intended to give you just enough information to put the
discussions in this and the next module into a project management context. The more
detailed discussions of project management processes are reserved for Modules 3
through 6.
Most projects, even those with just one phase, are typically planned and executed using
what is called progressive elaboration.
Progressive Elaboration
The PMBOK® Guide—Seventh Edition defines progressive elaboration as “the
iterative process of increasing the level of detail in a project management plan as
greater amounts of information and more accurate estimates become available.”
You need to start planning somewhere even though you know information from
other planning areas will influence the part of the plan you are working on. For
example, when you are working on the initial schedule and cost estimates, you
haven’t yet worked on the quality plan or the risk register. Quality control activities
and risk responses take time and money, which will either directly impact the
schedule and budget or take the form of reserves. Therefore, you will go back and
revise these initial plans as you go through the various planning steps.
You will not start out with perfect estimates. As the relevant events get closer or
earlier phases are completed, a more detailed level of information will be available
and estimates will be more precise. Since the phases of agile projects are typically
very short, the progressive elaboration in this case is meant to occur between each
phase. (Changes to plans during a phase are actively discouraged.) As projects
progress, project managers will conduct a project review, which the PMBOK®
Guide—Seventh Edition defines as “an event at the end of a phase or project to
assess the status, evaluate the value delivered, and determine if the project is ready
to move to the next phase or transition to operations.”
Project managers view plan refinement as a natural part of planning that allows
more precise baseline specification, measurement, and management as the project
evolves.
• Cost and staffing curve. In general, costs and staffing for a predictive project
life cycle are low during the earlier Process Groups—Initiating and the first
pass at Planning—because few team members are on board and the project is
using fewer resources. Costs increase quickly during the later Process Groups
of Executing and Monitoring and Controlling, when most of the project work is
being done. Costs begin to decrease at the end of Executing and Monitoring and
Controlling as deliverables are completed and resources are released. Costs
decrease more quickly during the final Process Group, Closing. On an agile or
hybrid project, early phases may likewise have lower costs if teams start small,
and costs could ramp up if the work shows promise and additional resources are
devoted to the project. Teams may also be kept the same size, in which case the
cost and staffing curve will be more flat and, as a side benefit, predictable.
Stable teams could be small or large (e.g., to represent many cross-functional
interests).
• Cost of changes curve. For a predictive project, the least expensive time to
change scope or product characteristics is early on, before work has been done
and resources spent. As the project work progresses, the ability to make
changes without significantly affecting cost and schedule (and possibly other
measures such as quality and project team motivation and engagement)
decreases. Changing course may mean that investments made as a result of
earlier decisions have been wasted. Work based on a mistake or incorporating a
flawed element has to be redone. Changes may have a “ripple effect” on work
that has already been completed. A team working on new manufacturing
equipment could handle this issue by proving their design concepts through a
prototype test before proceeding to building the equipment. (Prototyping is an
example of an agile mindset.) This would decrease the risk of later changes to
project baselines. Agile, by design, works to keep the cost of changes lower
throughout a project so that changes can be accommodated even late in the
project.
The way in which the cost of change increases as a project progresses through
various phases is shown in Exhibit 1-4. Note that the phase names used in this
graphic may be different from the phase names used elsewhere in these materials or
those you will encounter in the field. Organizations may use many different names
to describe product phases.
Exhibit 1-4: Risk and Uncertainty Decrease, but Cost of Changes Increases as Project Progresses
Source: Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK®
Guide)—Sixth Edition, Project Management Institute, Inc., 2017, Figure 1-3, Page 549. Material from this publication
has been reproduced with the permission of PMI.
Not all projects are alike, however. In some projects, costs are front-loaded or rise
quickly—for example, when a project requires very expensive architectural planning up
front. In some projects, uncertainty is very difficult to manage. For example, a new
building may include features that have never been built before or materials that have
never been used in construction of this type. To apply heightened levels of managerial
oversight, organizations can divide complex predictive projects into more phases, or they
can use iterative, incremental, or agile life cycle types.
Cadence Choices
The PMBOK® Guide—Sixth Edition discusses how cadence choices refer to the timing
and frequency expected for project deliverables. These choices are broken down into four
delivery options:
• Single delivery. These projects have a single delivery of any and all intended
deliverables at the end of the project.
• Multiple delivery. These projects have multiple deliveries throughout the course of the
project, though they may not be on a fixed schedule. Deliveries may be developed
sequentially or as separate parts of the product.
• Periodic delivery. These projects have multiple deliveries, but the schedule is fixed,
such as biweekly or monthly.
Source: Project Management Institute, Agile Practice Guide, Project Management Institute, Inc., 2017, Table 3-1,
Page 18. Material from this publication has been reproduced with the permission of PMI.
Each of these project life cycles may manage uncertainty by using rolling wave
planning. The PMBOK® Guide—Seventh Edition describes this as “an iterative
planning method in which the work to be accomplished in the near term is planned in
detail, while the work in the future is planned at a higher level.” The first wave of
project work appears on the horizon, and the team busily prepares to manage it.
While that wave dissipates, the team turns its attention to planning its response to the
next wave. It can see this wave more clearly now, and it may understand how to
manage it better because of the experience and deliverables generated during the
previous wave. Agile projects in particular rely on rolling wave planning between
phases.
Note that the four project life cycle types work on a continuum, so the iterative and
incremental types tend to overlap with other life cycle types, as shown in Exhibit 1-6.
Source: Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK®
Guide)—Sixth Edition, Project Management Institute, Inc., 2017, Figure X3-1, Page 666. Material from this publication
has been reproduced with the permission of PMI.
Predictive
The PMBOK® Guide—Seventh Edition describes the predictive approach, also called the
fully plan-driven approach, as “a development approach in which the project scope, time,
and cost are determined in the early phases of the life cycle.” A predictive cycle can also
be called a waterfall cycle, because each step flows down to the next without repeating
prior steps. (However, progressive elaboration will still occur during planning.) The
ability to develop detailed plans in advance of execution allows the project manager to
predict an unfolding sequence of activities that will take place in each phase, therefore
avoiding risk and reducing costs. One can associate predictive life cycles with the image
of a falling line of dominoes. If you’ve seen a falling dominoes display, you know that
individual dominoes are first carefully laid out in an exact pattern. The “domino master”
(or project manager, for our purposes) tips the first domino. Unless there has been a fault
in planning or some unexpected and uncontrollable external force intervenes (imagine the
effect of an earthquake), the dominoes will fall in the anticipated order and produce a
satisfying result. (Clearly, a project manager needs to stay more involved than this, but it
is just an analogy.) Similarly, in a predictive project life cycle, the phases unfold and
develop in the anticipated manner. Complex domino displays and projects with predictive
life cycles can also unfold in sequential and overlapping phases.
Each phase focuses on work that is essentially different from that in the preceding phase
and may involve different team members. The deliverable is not in a form acceptable to
the customer until the end of the project.
Although the scope is well-defined at the beginning, planning for later phases may not be
as detailed. As the project life cycle proceeds, rolling wave planning may be used to plan
the next phase in detail. Scope changes are controlled carefully, however. Changes in
requirements that occur in late phases can create significant changes to a project’s
schedule and budget. As a result, any changes to the project scope are carefully managed.
Predictive life cycles are best suited to projects that have easily defined, well understood
deliverables. Think about the manufacturing of a new school bus model. Although the
project may include some new engine or dashboard technology and new kinds of seats or
seating configurations, the customers know the requirements for a school bus and the
suppliers know what it takes to manufacture one.
Source: Project Management Institute, Agile Practice Guide, Project Management Institute, Inc., 2017, Figure 3-2,
Page 21. Material from this publication has been reproduced with the permission of PMI.
the project scope is generally determined early in the project life cycle, but time and
cost estimates are routinely modified as the project team’s understanding of the
product increases. Iterations develop the product through a series of repeated cycles,
while increments successively add to the functionality of the product.
The reason this life cycle is called iterative is that repeating the cycles is the key element
used to drive value by ensuring that this is the correct solution. While there are increments,
the increments are not distinct deliverables but rather features or refinements of a single
deliverable per phase. (The PMBOK® Guide—Seventh Edition defines a feature as “a set
of related requirements or functionalities that provides value to an organization.”)
Repetition (or iteration) of one or more project activities deepens the project team’s (and
an adaptive project life cycle in which the deliverable is produced through a series of
iterations that successively add functionality within a predetermined time frame. The
deliverable contains the necessary and sufficient capability to be complete only after
the final iteration.
In an incremental project, the deliverable (product, service, or other result) is run through
a series of predictive or waterfall iterations (one iteration per phase), each of which
produces a feature, component, or unit of the overall deliverable. While this method uses
iterations to produce each partial deliverable, it is the increments that are the most
important, because each increment can be used to gather early customer feedback or to
fast-track other phases/projects. The increment might also be released to operations. Speed
of delivery is enhanced by planning each increment one at a time. Unlike a predictive
project, this allows requirements to be dynamic for the parts of the project that have yet to
be planned and executed. Note that the overall deliverable will be considered
finished—i.e., it contains all agreed-upon capabilities, qualities, or features—only after
the last iteration. For example, an incremental townhome complex project completes a
block of similar units at a time. The first few units are used to demonstrate various options
to potential buyers, who can select customizations for the units that are yet to be built.
Some units are sold and people move into them before the final units are even started.
Exhibit 1-8 shows an example of a life cycle featuring an incremental development
approach.
Source: Project Management Institute, PMBOK Guide®—Seventh Edition, Project Management Institute, Inc., 2021,
Figure 2-10, Page 44. Material from this publication has been reproduced with the permission of PMI.
• The project is too complex to plan from the start and feedback or lessons learned
can be used to improve later phases.
• The scope and objectives are subject to change as stakeholders learn more.
Another advantage of iterative or incremental life cycles is that the project manager
can plan the next phase while the project team executes the current phase. In this way,
only a high-level vision of the scope of work needs to be determined initially.
Elements of the plan may be only tentatively assigned to a particular iteration.
However, once work begins on an iteration, scope changes to that iteration are subject
to integrated change control.
A project can be iterative or incremental and still be closer to the predictive end of the
spectrum. This might be the case if the project phases are long and each phase
involves detailed planning based on feedback gained from the prior phase, including
the client’s reaction to the partial deliverables received so far. When a project is
iterative and incremental and has other features like very short phases, then it is likely
an agile project.
Agile (Adaptive)
The PMBOK® Guide—Seventh Edition defines agile as “a term used to describe a
mindset of values and principles as set forth in the Agile Manifesto.” An agile life
cycle is also known as the change-driven or adaptive approach. According to the
PMBOK® Guide—Seventh Edition, the adaptive approach is “a development
approach in which the requirements are subject to a high level of uncertainty and
volatility and are likely to change throughout the project.” While an iterative life cycle
is a little incremental and an incremental life cycle is a little iterative, an agile life cycle
is equally iterative and incremental. Both are vital to success. The increment to
produce is approved before the start of a given iteration. The iteration is used to
minimize requirements uncertainty and the potential for plans to get rapidly out of date
by planning for only the upcoming iteration in detail. Agile life cycles differ from
iterative and incremental life cycles that are closer to the predictive end of the spectrum
in that iterations are very rapid (usually two to four weeks in length), which allows this
approach to address risk and costs as issues emerge. The agile approach is intended to
facilitate projects that expect a high amount of change. This requires a high degree of
ongoing stakeholder involvement. Exhibit 1-9 shows a sample life cycle with an
adaptive development approach.
Source: Project Management Institute, PMBOK Guide®—Seventh Edition, Project Management Institute, Inc., 2021,
Figure 2-11, Page 45. Material from this publication has been reproduced with the permission of PMI.
Planning for a single iteration means that planning is a regular event rather than being
addressed up front. When the team meets in its iteration planning session, they
determine how many of the highest-priority requirements can be completed in the
current iteration. Projects with agile life cycles collect ideas for improvements and new
features and feed them continually into the next iteration. Predictive projects with some
degree of iteration will collect these ideas throughout the project but hold the most
disruptive of them for a new, subsequent project—version 2.0.
Exhibit 1-10 compares a waterfall (predictive) project, on the left, with an agile project
that includes features of both iterative and incremental life cycles, on the right. The
path of the agile project is like a series of loops, so it is iterative. Iterative projects can
be thought of as a spiral that starts with a central idea at its core that gets broader and
more complex each time it loops around through the Planning, Executing, and
Monitoring and Controlling Process Groups. For example, testing conducted during
Executing and interpreted during Monitoring and Controlling can influence the next
round of Planning. The project also produces valuable deliverables or results in
increments after each phase. Because iterations are brief and feedback is gathered
continuously, the agile life cycle can handle change even late in the project in a cost-
effective manner.
Exhibit 1-10: Waterfall (Predictive) Life Cycle versus Agile Life Cycle
The exhibit shows how project phases intentionally iterate or repeat certain activities
as the project team develops a deeper and deeper understanding of the product while
incrementally releasing better and better deliverables or new deliverables per phase.
An example could be a billing system for a large utility company. The first phase
could provide the company with a system with core deliverables such as the
framework plus basic functionality. Subsequent phases could make the system more
user-friendly or decrease transaction times or increase the number of interactions that
end users (the company’s customers) can perform. Note that the example shows just
one Initiating and one Closing Process Group, but these could also be repeated in each
phase.
The agile cycle is best for situations when scope and requirements cannot be
determined or must remain flexible to adapt to changing enterprise environmental
factors such as competitor actions. Agile projects use a product backlog to control
scope and prioritize activities to be performed in a given iteration.
There are two very different approaches that agile frameworks can take:
phase). The iteration is done at the end of the set time period, meaning that while
the plan is to start and complete all work (by selecting just enough work to likely
fill the iteration), some planned tasks may not get done and will need to be
completed in the next iteration.
• Flow-based agile. In flow-based agile (such as the Kanban Method), the process
is still iterative, but work is not restricted to a particular iteration cycle. It is called
flow-based because there is a continuous flow of work as features are started/
completed on demand rather than new work being added only at the start of an
iteration cycle. The primary control is instead a strict limit on how much work-in-
process (WIP) can exist at any time. The limit is typically fairly low to help
identify issues quickly. As a task or feature is completed, new capacity is created
for the team to add another task/feature. The team convenes whenever there is
available capacity to discuss what to add next. The plan is to always refill the WIP
limit to its maximum as long as there is work to be done. For example, if a team is
working on three features at a certain point and one feature (including testing) is
completed, then the team meets to select and add another feature to fill up the
queue even though the other two features are still being worked on.
Exhibit 1-11 illustrates an iteration-based agile life cycle. The example shows Scrum,
an agile framework. After the project is initiated, the team meets regularly in a series of
sprints, which are often as short as two or three weeks. The team plans and estimates
for just that period and then implements that plan. The first half of the regular Scrum
meeting for a sprint is dedicated to replenishment (a retrospective of the prior sprint).
The second half of the meeting is devoted to planning and estimating for the upcoming
sprint. The plan is executed between meetings, and the process is repeated until the
final deliverable is ready for release. Each sprint results in a more developed product
with more features or better functionality.
Hybrid
A hybrid life cycle is a combination of adaptive and predictive approaches. Instead
of being assigned to the whole project, predictive and adaptive processes are
assigned to different elements within the project, based on the element’s qualities
and requirements. It is up to the project management team to determine which is the
appropriate life cycle for a project and to ensure that it has the requisite flexibility to
encompass all project elements. The hybrid approach may be best applied when
there is uncertainty around project requirements or when deliveries can be
modularized.
Project Phases
Projects can be divided into phases to control the work and to integrate the project’s
final product, service, or result into the ongoing operations of the organization for
which the project is being performed. With the exception of iterations for agile
projects, a phase is usually a major subdivision of a project.
One or more project phases comprise the project’s life cycle. Simple predictive
projects often have only one phase. In a predictive project with multiple phases, the
phases could each occupy a fairly long duration, such as several months, but each
Phases are always appropriate for an agile project. When are phases appropriate for a
non-agile project? Apply the following criteria to decide:
• There is a distinct goal or objective to meet in the phase that can impact later
phases.
• The work to be done in a phase is mostly or fully completed in that phase, resulting
in a distinct deliverable.
• Deliverables are produced and turned over to customers before completion of the
entire project.
• One of the deliverables has a different delivery date than the others.
• The people, organizations, or resources for the phase differ from that for other
phases. (When the work required in each phase differs significantly, a good
portion of the project team will also differ from phase to phase. For example, one
phase may involve architects while another may involve electricians and structural
engineers.)
• Unique processes or controls are needed in each phase.
Each phase has its own full or partial set of Process Groups. For example, during a
feasibility phase, there would be an Initiating phase to authorize the feasibility study,
Planning to determine feasibility scope and so on, and then Executing, Monitoring
and Controlling, and Closing, resulting in a completed feasibility study. If the results
look promising, then the next phase would begin. Other phases could include concept
development, milestone reviews, or examination of lessons learned.
Phases can be identified using a variety of attributes. For example, a simple name or
number (Phase A, Phase 1, Sprint 1), a duration (Week 1, Month 1), or a resource
requirement (which building it will take place in, specific equipment that is needed)
can be used. Entrance and exit criteria can also be used to identify project phases,
such as the completion of certain deliverables, including any required documentation
and successful quality or integration test results.
made to continue to the next phase, to continue with modification, or to end a project
or program.” The project manager and the team will assess their work and progress.
Sponsors or product owners will analyze accomplishments, the ratio of benefits to
costs, and changes in risks or the organization’s own strategic priorities. The decision
will be made to continue with or cancel the project. If necessary, remedial or
corrective action can be taken before beginning the next phase in the life cycle.
Different organizations call this point by different names, for example, milestone, kill
point, stage gate, or phase review.
What are the phases of the project life cycle? The answer is, it depends. There is no
consensus in the project management profession or even in a given industry.
Organizations select or develop their own life cycles and phases and may choose
different ones for different types of projects. (From this perspective, an
organization’s guidelines about how to structure a project are an example of an
organizational process asset, or OPA.)
• The degree to which the phases are predictive, iterative and incremental, or agile.
With sequential phases, the next phase begins only after the prior phase is
complete—deliverables are accepted and the phase has been closed. Sequential
phases can be used when a deliverable is needed as an input to a later phase, when
additional staff or resources are unavailable, or when risks need to be minimized.
When using sequential phases, there are fewer opportunities to compress the
schedule.
With overlapping phases, work in one phase may overlap another phase or be done
simultaneously. This is possible if the teams, resources, and deliverables are
independent of one another or only partly dependent on one another. Overlapping
allows project managers to use schedule compression tools such as fast tracking
(simultaneous activities). Overlapping may require increasing the size of the project
team and resources. It increases some risks, primarily the risk that progressive
elaboration in an earlier phase will lead to rework in a later phase. Another risk is
added complexity due to the need for greater integration of the work.
An agile project with a fixed project team will typically use sequential phases
because all the team is occupied on the same iteration. This makes sense, because
when a project is subject to high degrees of uncertainty and possible change, the end
of a sequential iteration presents a point at which adjustments can be made, before the
project moves to the next phase. Agile projects can use overlapping phases, but this
will generally be possible only on larger agile projects with multiple small project
teams. Each subteam will perform tasks on its own, and the overall work will need to
be integrated. This maximizes the amount of time spent on execution and reduces
management overhead. An overall integration team can then focus on overall
improvements as opposed to just those defined by the scope of an individual iteration.
CASE STUDY
Quanta Pharmaceuticals is initiating a project to develop a new anti-scarring agent
currently called B71, a drug for use in hospitals and private practices such as for
plastic surgery. Later parts of this case study will discuss the rationale for the project
and how the project fits into the strategy of the organization, but here we will just
discuss the project’s phases and life cycle choices. This project will have a number of
distinct phases. Pharmaceutical development is extremely complicated, so we’ve
simplified it somewhat and condensed Quanta’s project into eight generally
overlapping phases:
• Preclinical investigation and testing
• Submission
• Creation of product profile
• Formulation and packaging
• Clinical investigation
• Construction of manufacturing facility
• Preparing for launch
• Launch
Because of the nature of drug development and the need to fulfill specific regulatory
requirements at stage points, a predictive project life cycle will be used for the
majority of these phases. A few of the phases, however, will use an agile life cycle. In
our case study in this Learning System, we will focus on two of these phases,
preclinical investigation, which will use an agile life cycle, and testing and construction
of the manufacturing facility, which will use a predictive life cycle to illustrate the
predictive project Process Groups, from Initiating to Closing.
The Gantt chart in Exhibit 1-12 shows the phases proposed to management along
with their associated milestones. Note that the chart hides the activities within each
phase and focuses primarily on the phases and their relationships.
Predictive projects include a large number of distinct processes. For example, one process
is Identify Stakeholders. (Note how the process name starts with an action verb; this plus
the capitalization helps distinguish it as an official PMBOK® Guide process.) While the full
discussion of these processes is reserved for the Process modules in this Learning System,
it is important at this point to realize that the processes are organized into what are called
Process Groups. Agile projects also use the Process Groups and many of the processes, but
they do so much more loosely and in miniature—that is, repeating many of the groups
during each iteration. However, the discussion that follows is primarily written from the
perspective of predictive projects, in accordance with the PMBOK® Guide—Sixth Edition.
a logical grouping of project management inputs, tools and techniques, and outputs. The
Project Management Process Groups include Initiating processes, Planning processes,
Executing processes, Monitoring and Controlling processes, and Closing processes.