1.2 - Working

The document outlines a detailed quotation from ABI Electrical Solutions to Welspun Michigan for electrical equipment, including various components such as MCCBs, MCBs, and metering sections. The total cost for the project, which includes labor and transport, amounts to Rs. 280,912.15. The breakdown includes individual item costs, discounts, and quantities for each component required for the installation.

Uploaded by

Alok
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

1.2 - Working

The document outlines a detailed quotation from ABI Electrical Solutions to Welspun Michigan for electrical equipment, including various components such as MCCBs, MCBs, and metering sections. The total cost for the project, which includes labor and transport, amounts to Rs. 280,912.15. The breakdown includes individual item costs, discounts, and quantities for each component required for the installation.

Uploaded by

Alok
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MANUFACTURER- ABI ELECTRICAL SOLUTIONS

CLIENT- WELSPUN MICHIGAN

TITLE - MDB Qty. = 1 Nos.


Amount
Sr. no. Particulars Make Qty Unit MRP Discount Landed Cost
Rs.
A1 EB INCOMER- 1
1 400A,36kA,FP,MCCB- TH release - DN3B L&T 1 No. 41,600.00 58.0% 17,472.00 17,472.00

1.1 Extended Rotary Handle L&T 1 No. 3,830.00 58.0% 1,608.60 1,608.60

1.2 Spreader link (1 set=8No.) L&T 1 SET 5,200.00 58.0% 2,184.00 2,184.00
1.3 METERING SECTION L&T
1.4 Indicating Lamp RED (R PHASE) L&T 1 No. 98.00 0% 98.00 98.00
1.5 Indicating Lamp Yellow (Y PHASE) L&T 1 No. 98.00 0% 98.00 98.00
1.6 Indicating Lamp Blue (B PHASE) L&T 1 No. 98.00 0% 98.00 98.00
1.7
1.8 MULTIFUNCTIONAL METER SELEC/SECURE 1 No. 3,250.00 0% 3,250.00 3,250.00
1.9 CT's for Above meter reputed 3 No. 750.00 0% 750.00 2,250.00
2.0 6A,10KA,SP,MCB FOR CONTROL L&T 6 No. 269.00 55% 121.05 726.30
2.1 NEUTRAL LINK L&T 1 No. 75.00 0% 75.00 75.00

A2 400A, M-COS FOR SERVO / BYPASS 1

1 400A,MANUAL - CHANGE OVER SWITCH L&T 1 No. 21,100.00 35% 13,715.00 13,715.00

1.1 METERING SECTION L&T


1.2 Indicating Lamp RED (R PHASE) L&T 1 No. 98.00 0% 98.00 98.00
1.3 Indicating Lamp Yellow (Y PHASE) L&T 1 No. 98.00 0% 98.00 98.00
1.4 Indicating Lamp Blue (B PHASE) L&T 1 No. 98.00 0% 98.00 98.00

OUTGOING:- For Stabiliser , Bio Reactor # 02


A6
& spare.
6 400A,36kA,FP,MCCB- TH release - DN3B L&T 2 No. 41,600.00 58.0% 17,472.00 34,944.00
6.1 Extended Rotary Handle L&T 2 No. 3,830.00 58.0% 1,608.60 3,217.20
6.2 Spreader link (1 set=8No.) L&T 2 SET 5,200.00 58.0% 2,184.00 4,368.00
6.3 INDICATING LAMP RED (ON ) L&T 2 No. 185.00 0.0% 185.00 370.00
6.4 6A,10KA,SP,MCB FOR CONTROL L&T 2 No. 280.00 55.0% 126.00 252.00
6.5 NEUTRAL LINK L&T 2 No. 75.00 0.0% 75.00 150.00
For Spare. 4
7 160A,25kA,FP,MCCB WITH THERMAL RELEASE L&T 4 No. 20,500.00 58.0% 8,610.00 34,440.00
7.1 Extended Rotary Handle L&T 4 No. 1,940.00 58.0% 814.80 3,259.20
7.2 Spreader link (1 set=8No.) L&T 4 SET 2,480.00 58.0% 1,041.60 4,166.40
7.3 INDICATING LAMP RED (ON ) L&T 4 No. 185.00 0.0% 185.00 740.00
7.4 6A,10KA,SP,MCB FOR CONTROL L&T 16 No. 280.00 55.0% 126.00 2,016.00
7.5 NEUTRAL LINK L&T 4 No. 75.00 0.0% 75.00 300.00
A3 TOTAL OF SECTION NO. 01 130,091.70
SECTION No.02
CUBICLE: FABRICATION USING 1.6mm CRCA SHEET. 1 No.
FABRICATION & POWDER COATING. 328 kG. 158.00 51,824.00
PANEL SIZE : Width In Meter Height In Meter
2.1 1.8
POWDER COATING, RAL-7035.SEVEN TANK PRE-TREATMENT
1 Lot
PROCESS
LIFTING ANGLE 0 158.00 0.00
BASE FRAME(ISMC: 75mm X 40mm.)
40 kG. 155.00 6,200.00
BUSBAR : ALUMINIUM 59 kG. 298.00 17,582.00
HARDWARE, GASKETS, WIRES, LUGS, LOCKS, SLEEVES. 1 Lot 16,261.46 16,261.46
TOTAL OF SEC.No.02 91,867.46
SUM (SECTION I+II) 221,959.16
LABOUR 19,475.00
SUBTOTAL 241,434.16
TRANSPORT. 4,980.00
Subtotal 246,414.16
Margin 14% 34,497.98
TOTAL 280,912.15