0% found this document useful (0 votes)
12 views25 pages

Untitled

The document contains detailed notes and diagrams related to the construction and layout of a facility, including various areas, water tanks, and utilities. It outlines specific measurements, areas, and equipment placements, as well as engineering approvals needed for the project. Additionally, it includes references to existing structures and future planning considerations.

Uploaded by

ruheni githinji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views25 pages

Untitled

The document contains detailed notes and diagrams related to the construction and layout of a facility, including various areas, water tanks, and utilities. It outlines specific measurements, areas, and equipment placements, as well as engineering approvals needed for the project. Additionally, it includes references to existing structures and future planning considerations.

Uploaded by

ruheni githinji
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

HEAL CLINIC &

TU
NOTES:
POLICE STATION

RS
1. Setting out to be approved by the Engineer

19/7 2. Invert levels are in meters

KE

G LI G
3

AR N
H1

A
G LI G
G
EN

AR N
WATER TANK

DE ME Y S
R

A
ER
SM

DE ME

N
PL
AT

CI
N NT
O

TY
N
R

CI
AY

T
BR2 RM Hrc7

SE
2 Hrc8

W
4 H1 LEGEND:

TO

ER
E
SM 7

RO
MH

RM
WATER TANK

ID
C1 AREA = 1.79Ha C

W
5 11

UN

AT
H MH

ER
M Approx. S 2
c1

D
B8a AREA = 0.823Ha Hr

D
PO

40
80
Spirit
Water 65
RO
65
80

A
W

Red.
80x40
Approx.

(B.F.)
Ecc.
LL

4
Filler

Pump
to

Filter
40

Feed
ER
0
E
H1

O
MAXIST HS
NH ING
OL E
SM LR NO 5986/10

R
E
H7
SM

3
G1

c5
M

H
LR NO 10119/9

Hr
H9

5
SM H6

TRANSPORT
DIRECTION
340

1
Hrc6
CM

2
G1
H
M
M BOREHOLE

Hardsand next to
5
1

GE
STORA
200T
No. 2

tusker house
SILO

No.1
Grain
c' Spent

No.2
ometri s
AREA =1.23 Ha

'Chron Lorrie
GE
STORA
200T
No. 1

3 No. rgers to
SILO

Discha

No.3
EXISTING

G1
(Approx. +2.1
0
New concret
access
ramp
e

H
UP
prof RAMP

M
ile 6(b)

(i) (ii) (iii)

S
TANK
No.2 6(a)
profile

AGE
OIL
(xv)

OIL STOR
FUEL GE TANK
STORA

No.3
(xiv)

FUEL
No.1
(xiii)
up
1500 KVA (xii)

TRUCK PARKING LOT


KVA

Tx 6
1500 ER
WAT
HOT TANKS

Tx 4
(New) NEW E
RAG
(Old)
STO

RS1

RMU

HV4
HV3
KVA

HV2
HV1
1500

/
Utilities
3.3KV
pipe drain
1500 KVA
(xi)

Tx 7
∅mm Upvc
RS2

Tx 8
Training
Induction KPLC

(x)
Room

Entry PFC Banks


425 KVAR
-1
UT Tx

old logistics
gate.
needs
Special 180 degrees IN
Framed

Tripod
Turnstile
(ix)
Exit
Tripod
Turnstile
(viii)
(vii)

old logistics

HL.)
IN
OUT

. ( 5,016
(vi)

)
. ( BSP
weigh bridge

00 GAL
(v)

C.L.T

110,0
(iv)

1
2
3
5

4
6
7 = 2,850
17 x 168

(iii) 8
9
10

17
16
15
11

14
12
13
(ii)
NGUMBA ROAD (i)
Pumps
P.W.

OSED
PROP STAND
HARD
profile 3(b)

ROOM
MEETING
1
2

up
)
( Barm
GFE Sterile
Tanks
AGE Beer
GFE STOR 2
AGE TANK
STOR 1
profile 5(b)

te
Flowpla
TANK
drainage

profile 4b)

up
PLANT
FOR FUTURE
AVAILABLE

(i) (ii) (iii) (iv)


SPACE

(i) (ii) (iii) (iv) (v)

RS2
Brewi RMU
Chille

ng /
(iii) (iv) (v) (vi) (vii) (viii) (ix) (x)

3.3 KV
(ii)

RS1
up

up

up
(i)
profile 4(a)
profile 5(a)
profile 3(a) Dn. to

up
84.10
Lev.

up
1(a)
profile g LV
Brewin board
Switch
LV1
LV2
LV3
up LV4

up
³

³
D.B.

Carbonator
³

PILOT BOARD
-
VALVES
SWITCH
GFE Tank
Storage
Control
Panel der
Tri-Blen
GFE Mixing

up
up

Control
Panel
up
down
Ramp G
ESSIN
KEG PROC

up
dn.
T ROOM
PLAN
PFC
425 KVARTx 1

1:10
LV S/Boar
PK
Bank

down
Bank
ing / PAK Tx-2

Main

Ramp
Packag RMU
3.3 KV

PFC
ging

Litres
425 KVARTx 2

dn.
RS1

Tank
Packa

PK

10,000
RS2

F.O.
Tx-1

New
PAK

E
ENSAT

.22
COND ER
RECEIV

I.L.73
el 161
(xxiv)
5.963
ve ) - Lev

Duct
(xxiii)
No.3
( Abo

(xxii)
(xxi)

e)
( Abov
2
(xx) 4

ry No.2
(xix) 1

Gant
3

(xviii) FILTE
RS

Pipe
SAND

(xvii)

Hall
ing
(xvi) .72

Bottl
I.L.72

2(b ) (xv)
profile
(xiv)

7 (xiii) .22
I.L.72

(xii)
(xi) 2(a)
profile
(x)
(ix)

AREA =21.84 Ha (v)


(vi)
(vii)
(viii)
SLUD
GE TANK

(iv)

(Approx.

ENT) el - 70.58
(iii)
forklift run
ER TANK
WAT
RED
OVE

L
REC
(ii)

G HAL

(BASEM or Lev
(i)

Flo
TLIN
BOT
ER
CONTAIN

GATE

Pumps
Pumps

Caustic
c
Causti

Ø50 Fresh
c up
Causti Tank 3 up
Tank 2
c

up
Causti
c
Causti Tank 4
1
Tank

= 1.477Ha CHANGIN
G ROOM

G
CHANGIN ROOMS sh
ROOM WASH
GENTS
sh
WASH sh
LADIES wc
ROOMS wc
wc
urinal

16
AREA = 9.442 Ha Gate Valve

IL1590.33

Reparian Res. = 1.236Ha


DOWN

200
5R x 250 5
x
5G 4
UP

3
2
1
12
13
14
15
16

15
17
18
DOWN

Net Area = 8.207Ha


11

x 183
10

18R x 233
9

18G
8
7
UP

6
5
4
3
2
1

AREA = 3.304 Ha
E R LAYOUT
Reparian Res. = 0.488Ha V
Net Area = 2.817Ha RI Designed by: RR Drawn by: RR

T HE Checked by:

Scale:
IW

AS SHOWN
Approved by: KM

Date: JULY, 2023

OF Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

N E DRG No. IEL-04-01

LI
NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

weigh bridge
NGUMBA ROAD

drainage

profile 5(b)

drainage
(iii) (iv) (v) (vi) (vii) (viii) (ix) (x)
(ii)
(i)

profile 5(a)

WEIGH BRIDGE LAYOUT

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

Scale: AS SHOWN Date: JULY, 2023

Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-02


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

PROFILE 5(a) & 5(b)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

Scale: AS SHOWN Date: JULY, 2023

Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-03


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 5(i) profile 5(ii) profile 5(iii) profile 5(iv)


scale 1:100 scale 1:100 scale 1:100 scale 1:100

PROFILE 5(i) and 5(viii)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM


profile 5(v) profile 5(vi) profile 5(vii) profile 5(viii) Scale: AS SHOWN Date: JULY, 2023

scale 1:100 scale 1:100 scale 1:100 scale 1:100 Project No: IEL-CVL-O4-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-04


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 5(ix) profile 5(x)


scale 1:100 scale 1:100

drainage
scale 1:100

PROFILE (ix) & (x)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

Scale: AS SHOWN Date: JULY, 2023

Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-05


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

old logistic LEGEND:

profile 4b)
(i) (ii) (iii) (iv) (v)

profile 4(a)

OLD LOGISTIC (I)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

Scale: AS SHOWN Date: JULY, 2023

Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-06


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 4(a)
scale 1:100

PROFILE 4(a) & 4(b)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

Scale: AS SHOWN Date: JULY, 2023

profile 4(b) Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

scale 1:100 DRG No. IEL-04-07


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 4(i) profile 4(ii) profile 4(iii) profile 4(iv)


scale 1:100 scale 1:100 scale 1:100 scale 1:100

PROFILE 4(i) - 4(v)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM


profile 4(v) Scale: AS SHOWN Date: JULY, 2023

scale 1:100 Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-08


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 3(b)

(i) (ii) (iii) (iv)

profile 3(a)

PROFILE 3(a) & 3(b)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

Scale: AS SHOWN Date: JULY, 2023

Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-09


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 3(a) profile 3(b)


scale 1:100 scale 1:100

PROFILE 3(i) - 3(iv)

Designed by: RR Drawn by: RR

profile 3(i) profile 3(ii) profile 3(iii) profile 3(iv) Checked by:

Scale:
IW

AS SHOWN
Approved by: KM

Date: JULY, 2023

scale 1:100 scale 1:100 scale 1:100 scale 1:100 Project No: IEL-CVL-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-10


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

(xxiv)
(xxiii)
(xxii)
(xxi)
(xx)
(xix)
(xviii)
(xvii)
(xvi)
2(b) (xv)
profile
(xiv)
(xiii)
(xii)
(xi) 2(a)
profile
(x)
(ix)
(viii)
(vii)
(vi)
(v)
(iv)
(iii)

(i)
(ii)
forklift run

16
AREA = 9.442 Ha
Reparian Res. = 1.236Ha Designed by: RR
FORKLIFT RUN

Drawn by: RR

Net Area = 8.207Ha Checked by:

Scale:
IW

AS SHOWN
Approved by: KM

Date: JULY, 2023

Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-11


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 2(a)
scale 1:100

PROFILE 2(a) & 2(b)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM


profile 2(b) Scale: AS SHOWN Date: JULY, 2023

scale 1:100 Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-12


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 2(i) profile 2(ii) profile 2(iii) profile 2(iv)


scale 1:100 scale 1:100 scale 1:100 scale 1:100

PROFILE 2(i) - (2viii)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM


profile 2(v) profile 2(vi) profile 2(vii) profile 2(viii) Scale: AS SHOWN Date: JULY, 2023

scale 1:100 scale 1:100 scale 1:100 scale 1:100 Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-13


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 2(ix) profile 2(x) profile 2(xi) profile 2(xii)


scale 1:100 scale 1:100 scale 1:100 scale 1:100

PROFILE 2(ix) - (xvi)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM


profile 2(xiii) profile 2(xiv) profile 2(xv) profile 2(xvi) Scale: AS SHOWN Date: JULY, 2023

scale 1:100 scale 1:100 scale 1:100 scale 1:100 Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-14


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 2(xvii) profile 2(xviii) profile 2(xix) profile 2(xx)


scale 1:100 scale 1:100 scale 1:100 scale 1:100

PROFILE 2(xvii) - (xxiv)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM


profile 2(xxi) profile 2(xxii) profile 2(xxiii) profile 2(xxiv) Scale: AS SHOWN Date: JULY, 2023

scale 1:100 scale 1:100 scale 1:100 scale 1:100 Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-15


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

hou s e pro

us ke r file
6(b
)

x t to t (i) (ii) (iii)

n d n e (a)

ta o f il e6

s p r
(xv)

H a r d (xiii)
(xiv)

(xii)

(xi)
(x)
(ix)
(viii)
(vii)
(vi)
(v)
(iv)
(iii)
(ii)
(i)

O S ED
P
PRO STAND
D
HAR

l e 1(a)
pr of i

TUSKER HOUSE

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

Scale: AS SHOWN Date: JULY, 2023

Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-16


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 1(a)
scale 1:100

PROFILE 1(a) - 1(b)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM


profile 1(b) Scale: AS SHOWN Date: JULY, 2023

scale 1:100 Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-08-17


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 1(i) profile 1(ii)


scale 1:100 scale 1:100

PROFILE 1 (i) - (iv)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

profile 1(iii) profile 1(iv) Scale: AS SHOWN Date: JULY, 2023

scale 1:100 scale 1:100 Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-18


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 1(v) profile 1(vi)


scale 1:100 scale 1:100

PROFILE 1 (v) - (viii)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

profile 1(vii) profile 1(viii) Scale: AS SHOWN Date: JULY, 2023

scale 1:100 scale 1:100 Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-19


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 1(ix) profile 1(x)


scale 1:100 scale 1:100

PROFILE 1 (ix) - (xii)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

profile 1(xi) profile 1(xii) Scale: AS SHOWN Date: JULY, 2023

scale 1:100 scale 1:100 Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-20


NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 1(xiii) profile 1(xiv)


scale 1:100 scale 1:100

PROFILE 1 (xiii) - (xv)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

profile 1(xv) Scale: AS SHOWN Date: JULY, 2023

Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0


scale 1:100 DRG No. IEL-04-21
NOTES:
1. Setting out to be approved by the Engineer

2. Invert levels are in meters

LEGEND:

profile 6(a) profile 6(b) profile 6(i)


scale 1:100 scale 1:100 scale 1:100

PROFILE 6 (a,b,i,ii,iii)

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

profile 6(ii) profile 6(iii) Scale: AS SHOWN Date: JULY, 2023

Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0


scale 1:100 scale 1:100 DRG No. IEL-04-22
NOTES:
1. Setting out to be approved by the Engineer

6000 2. Invert levels are in meters

LEGEND:

10

250
250

HARDSTAND SECTION, EXPANSION


AND CONTRACTION JOINT

Designed by: RR Drawn by: RR

Checked by: IW Approved by: KM

Scale: AS SHOWN Date: JULY, 2023

Project No: IEL-CVL-04-2023 Sheet: A1 Rev: R0

DRG No. IEL-04-23


G

0.35
0.15

0.05
0.15

H
0.30 A 0.30

B
E

0.30 0.15
0.30
B

0.15
0.13 K G K

0.45
0.10
5.20

0.15 L
6.00
0.30
40
FRONT ELEVATION.
SECTION A - A.

0.25 D 0.25

0.15
0.25
40

0.13
0.15 A B

E
1.67

F
SECTION C - C.
N
M

4.00
6.00

K
C

SECTION B - B.
0.09
0.09

0.13

6.00
0.15
P
C

20.00
0.09

0.13

NOTES.
1. A193 Fabric mesh reinforcement to B.S. 4483 to be placed as shown.
2. Level and slope of the pipe shall be as instructed by the Engineer on site.
3. All dimensions are in metres unless otherwise stated.
5

4. Min. concrete surround for pipe


1.2mwill be 200mm and for slab 150mm
0.1

and not 150mm and 100mm as shown in section B-B.


5. 600mm culverts to be used only at intersections with township roads
and minor accesses.
PLAN. 6. Cover to BRC mesh to be 40mm.
7. PCC pipes to be manufactured in compliance with Section 17 of Standard
Specification for the Road and Bridge Construction - 1986.
0.13

8. All excavations for foundation to be approved by the Engineer on site


before commencement of concrete work for each foundation.

RR RR
INTERCONSULT ENGINEERS LTD PROPOSED TUSKER MICROBREWERY- PROJECT MILELE ON PLOT LR 101119
IW KM 1. All setting out to be confirmed and approve by the Civil Engineer
Consulting Engineers
Jadala Place, 4th Floor, Ngong Lane AS SHOWN JULY 2023 RUARAKA, NAIROBI- KENYA
P.O BOX 30161-00100
Tel. 4441648/4441651
P.O. Box 55176-00200, Nairobi IEL-CVL-04-2023 NAIROBI
TYPICAL CULVERT DETAILS
Q:\Standard Docs\STANDARD LOGOS\SGS logo.png

D IEL-04-24 0

You might also like