LAS1 4.peerformance - Task

This document outlines a performance task for Electrical Installation and Maintenance (EIM) students, focusing on the installation of electrical systems including the drawing of specific pipe bends and the installation of bulbs controlled by switches. It provides a detailed list of tools, equipment, materials, and personal protective equipment required for the task, along with a step-by-step procedure for installation. Additionally, it includes assessment criteria for both illustrations and written explanations related to the task.

Uploaded by

ronocete
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views4 pages

LAS1 4.peerformance - Task

This document outlines a performance task for Electrical Installation and Maintenance (EIM) students, focusing on the installation of electrical systems including the drawing of specific pipe bends and the installation of bulbs controlled by switches. It provides a detailed list of tools, equipment, materials, and personal protective equipment required for the task, along with a step-by-step procedure for installation. Additionally, it includes assessment criteria for both illustrations and written explanations related to the task.

Uploaded by

ronocete
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Republic of the Philippines

Department of Education
Caraga Administrative Region
Tabon M. Estrella National High School
Tabon, Bislig City

Electrical Installation and Maintenance (EIM) 9


LAS/MODULE 1-4 Performance Task
Alternative Method of Assessment

I- Illustration
Instruction: Draw the following; (5 points each)

1. Draw 90 degrees elbow bend.

2. Draw offset bend.

3. Reduced PVC pipe diameter defect.

Rubric for Illustration:

Criteria Score
1. Output represents correct illustration with complete details. 5
2. Output represents illustration with incomplete details. 3
3. Output represents incorrect illustration with incomplete details. 1

JOB SHEET 3.1


Install rigid non-metallic conduit
Install two bulbs, 1 bulb controlled by two (2) three-way switches and 1 bulb by SPST
switch with two duplex convenience outlet

TOOLS, EQUIPMENT AND MATERIALS

Equipment:
• Heat gun 1 unit

Materials:

• Pencil or chalk 1 pc.


• PVC pipe 3 pcs
• PVC adapter with lock nuts 18 pcs

1
• Utility box 5 pcs
• Junction box 4 pcs
• Lamp socket 2 pcs
• Safety switch 1 pc
• 3way switch 2 pcs
• SPST switch 1 pc
• 1 gang plate cover 3 pcs
• 2 gang plate cover 2 pcs
• Conduit clamps/straps 15 pcs
• Wood screws (1/4 x ½) 50 pcs
Tools:

• Steel meter stick/ straight edge 1 pc


• Try square 1 pc
• Pull push rule 1 pc
• Wet rug 1 pc
Personal Protective Equipment

• Respirator 1 pair
• Gloves 1 pc
Procedure:
Instruction: When you are ready to perform this task, ask your teacher to
observe the process and to rate your performance using the
assessment criteria.

1. Prepare the necessary tools, materials and equipment.


2. Wear appropriate PPE.
3. Mark on the wiring board the location of the safety switch, utility boxes, and junction boxes.
4. Fasten the safety switch and PVC boxes with wood screws at the desired locations.
5. Prepare the PVC conduit for installation.
a. Measure and cut each PVC pipe to desired length
b. Make an offset bend at each end of PVC conduit which will be connected to a box.
c. Bend 90º based on the diagram.
6. Install and connect ends of PVC pipe to the electrical boxes, safety switch.
7. Support the conduit with conduit clamps or straps.

8. Place the cover of junction box, utility box, and convenience outlet.
9. Perform good housekeeping.
10. Have your teacher check your work.

2
Note: Your teacher will determine the distance of each circuit.

Line diagram of the two bulbs, 1 bulb controlled by two (2) three-way switches and 1 bulb SPST
switch with two duplex convenience outlets in different location.
Instruction: When you are ready to perform this task, ask your teacher to observe the process
and to rate your performance using the assessment criteria.

Assessment Criteria

3
Alternative Method of Assessment

“Install two bulbs, 1 bulb controlled by two (2) three-way switches and 1 bulb SPST
switch with two duplex convenience outlet”
Instruction: Answer the following questions based on the circuit mentioned above. Write
answer in your answer sheet.

1. Name tools and PPE that are needed in the task.

Tools PPE
a. a.
b. b.
c.
d.
e.

2. Below is the line diagram of “two bulbs, 1 bulb controlled by two (2) three-way switches
and 1 bulb by SPST switch with two duplex convenience outlet”

Refer to the same diagram, draw the schematic diagram of the circuit.

Criteria Score
1. Output represents correct illustration with complete details. 5
2. Output represents illustration with incomplete details. 3
3. Output represents incorrect illustration with incomplete details. 1

3. Explain briefly the operation of “two bulbs controlled by two (2) three-way switches and
one (1) SPST switch with two convenience outlet”.

Rubric for Essay/Explanation Point


Complete and has the main thought and idea 5
Incomplete and has weak thought and idea 4
Incomplete and has limited thought and idea 3
Incomplete and has poor thought and idea 2
Answer is not relevant 1