0% found this document useful (0 votes)
8 views3 pages

Environment Clearance Technical FAQ

The document provides a technical FAQ regarding Environmental Clearance (EC) and Terms of Reference (ToR) related to projects categorized under the EIA Notification, 2006. It explains the definitions of Category A and B projects, the process for checking proposal statuses, and details on submitting various forms and compliance reports. The last update was made on March 14, 2023.

Uploaded by

wipali8732
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views3 pages

Environment Clearance Technical FAQ

The document provides a technical FAQ regarding Environmental Clearance (EC) and Terms of Reference (ToR) related to projects categorized under the EIA Notification, 2006. It explains the definitions of Category A and B projects, the process for checking proposal statuses, and details on submitting various forms and compliance reports. The last update was made on March 14, 2023.

Uploaded by

wipali8732
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

FC

EC Technical
Technical FAQ
FAQ

Last
Last update
update on
on 14/03/2023
14/03/2023

EC Technical FAQ

Q1. What does Cat A and Cat B mean?

Ans: Category "A" means projects or activities as listed in column (3) of the Schedule to EIA Notification,
2006, read with subsequent amendments made therein from time to time.

Q2. What does "Category ‘B’ projects/activities" mean?

Ans. Category ‘A’ means projects or activities as listed in column (4) of the Schedule to EIA Notification,
2006, read with subsequent amendments made therein from time to time.

Q3. What does "Terms of Reference" mean?


Ans. "Terms of Reference" (referred to as ‘ToR’)" means the detailed scope prescribed by the Regulatory
Authority for the project for the preparation of the EIA Report.

Q4. What does "Prior Environment Clearance" mean?

Ans. "Prior Environment Clearance (referred to as ‘prior-EC’)" means the clearance or consent of the
Regulatory Authority on the recommendation of the Appraisal Committee for the Category ‘A’; Category
'B1', and Category ‘B2’ projects that are required to be placed before the Appraisal Committee as
specified in the Schedule to the EIA Notification, 2006, read with subsequent amendments made therein
from time to time.

Q5. How to check the status of the submitted TOR/EC proposals ?

Ans: Go to “parivesh.nic.in” then click on “Track your proposal”-> Environmental Clearance-> For Cat A
proposals click on “Search Proposals( received upto 3rd July 2014)” or “Search Proposals( received on or
after 4th July 2014)” , for cat B proposals click on “Search State Proposals”.

Q6. What are different types of TOR/EC?

Ans. 1. Fresh TOR -> Form 1(Part A & Part B)

2. Fresh EC -> Form 1(Part C)

3. Amendment TOR -> Form 3

4. Amendment EC -> Form 4

5. Extension of Validity of TOR -> Form 5

6. Extension of Validity of EC -> Form 6

7. Transfer of EC -> Form 7

8. Transfer of TOR -> Form 8

9. Corrigendum of TOR -> Form 9

10. Corrigendum of EC -> Form 10

Q7. How to submit the EDS reply of fresh/ expansion TOR/EC proposals ?
Ans: Firstly login to parivesh, after login go to “EDS proposals” and submit the eds reply.

Q8. How to submit the Essential Details Sought (EDS) reply of Modification TOR/EC proposals ?

Ans: After login Go to "Approvals" ->"update/modify details of existing proposal" ->"My proposal
Environment clearance"->cat A/ cat B-> update request for modification.

Q9. How to submit the Additional Details Sought (ADS) reply for TOR/EC proposals ?

Ans: After login Go to "Approvals" ->"update/modify details of existing proposal" ->"My proposal
Environment clearance"->cat A/ cat B-> Additional details sought by Member Secretary.

Q10. How to reopen the delisted proposals?

Ans: After login Go to "Approvals" ->"update/modify details of existing proposal" ->"My proposal
Environment clearance"->cat A/ cat B-> Reopening Delisted proposals.

Q11. How to submit the Compliance report of granted EC ?

Ans: For Cat A proposals:

 After login, click on “Approvals”->”EC Conditions Upload”. After submitting the EC conditions go
to “E-KYC” and submit the form. After completion of E-KYC, go to “Upload compliance report”
and submit the compliance report.

For Cat B proposals:


 After login Go to "Approvals" ->"update/modify details of existing proposal" ->"My proposal
Environment clearance"-> Cat B-> upload compliance report.

You might also like