Environment Clearance Technical FAQ
Environment Clearance Technical FAQ
EC Technical
Technical FAQ
FAQ
Last
Last update
update on
on 14/03/2023
14/03/2023
EC Technical FAQ
Ans: Category "A" means projects or activities as listed in column (3) of the Schedule to EIA Notification,
2006, read with subsequent amendments made therein from time to time.
Ans. Category ‘A’ means projects or activities as listed in column (4) of the Schedule to EIA Notification,
2006, read with subsequent amendments made therein from time to time.
Ans. "Prior Environment Clearance (referred to as ‘prior-EC’)" means the clearance or consent of the
Regulatory Authority on the recommendation of the Appraisal Committee for the Category ‘A’; Category
'B1', and Category ‘B2’ projects that are required to be placed before the Appraisal Committee as
specified in the Schedule to the EIA Notification, 2006, read with subsequent amendments made therein
from time to time.
Ans: Go to “parivesh.nic.in” then click on “Track your proposal”-> Environmental Clearance-> For Cat A
proposals click on “Search Proposals( received upto 3rd July 2014)” or “Search Proposals( received on or
after 4th July 2014)” , for cat B proposals click on “Search State Proposals”.
Q7. How to submit the EDS reply of fresh/ expansion TOR/EC proposals ?
Ans: Firstly login to parivesh, after login go to “EDS proposals” and submit the eds reply.
Q8. How to submit the Essential Details Sought (EDS) reply of Modification TOR/EC proposals ?
Ans: After login Go to "Approvals" ->"update/modify details of existing proposal" ->"My proposal
Environment clearance"->cat A/ cat B-> update request for modification.
Q9. How to submit the Additional Details Sought (ADS) reply for TOR/EC proposals ?
Ans: After login Go to "Approvals" ->"update/modify details of existing proposal" ->"My proposal
Environment clearance"->cat A/ cat B-> Additional details sought by Member Secretary.
Ans: After login Go to "Approvals" ->"update/modify details of existing proposal" ->"My proposal
Environment clearance"->cat A/ cat B-> Reopening Delisted proposals.
After login, click on “Approvals”->”EC Conditions Upload”. After submitting the EC conditions go
to “E-KYC” and submit the form. After completion of E-KYC, go to “Upload compliance report”
and submit the compliance report.