0% found this document useful (0 votes)
15 views11 pages

Cost Segregation Techniques

Uploaded by

gabrielevan242
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views11 pages

Cost Segregation Techniques

Uploaded by

gabrielevan242
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

Cost Segregation

Technique
AGENA MARIE SAN PABLO
HIGH-LOW POINT
T he f ixed and variableMETHOD
por tions of the mixed costs are
computed from 2 sampled data points -- the highest
and lowest points based on activity or cost driver.
T he chief f inance of ficer of ABC Corporation is analyzing the relationship of its
electricity costs and the number of batches produce. T he following data are
assembled for this purpose:
MonthNo. of Batches Electricity Costs
Janua 4 P22,000
Februa 7 30,000
March5 25,000
April 2 15,000
May 3 21,500
June 6 29,000
July 8 36,000
Using the
1.2. Variablehigh-low
cost per point
unit method,3. determine
Monthly the
cost following:
function
Annual xed cost 4.10Estimated cost assuming
batches next month. they will produce
LEAST-SQUARES METHOD
A statistical technique that investigates the
association between dependent and independent
variable.
T he chief f inance of ficer of ABC Corporation is analyzing the relationship of its
electricity costs and the number of batches produce. T he following data are
assembled for this purpose:
MonthNo. of Batches Electricity Costs
Janua 4 P22,000
Februa 7 30,000
March5 25,000
April 2 15,000
May 3 21,500
June 6 29,000
July 8 36,000
Determine the total
least-squares method. f i
x ed cost and variable cost rate of electricity using the
SCATTER GRAPH METHOD
All obser ve d costs at dif fe rent activity levels are
plotted on a graph.
is method is based on sound judgment.
A regression line is then f itted to the plotted points to
represent the line function.
Assignment
XYZ Company s manufacturing overhead costs at various level of activity are
presentend below: ’

Month
March Machine
500 hours P 970 Total Overhead Costs
April
May 600 400
1,089 851
June 700 1,208
Tis ashe break down
follows: of the overhead costs in April at 400 machine-hour level of activity
Supplies
Salaries (Variable)
(Fixed) P260 300
Utilities
Total P851 (Mixed) 291
Required:
1.2. How much of June ’s overhead cost of 1,208 consisted utilities cost?
Using, least-squares method, determine the cost function for total overhead
costs?
3. What would be the total overhead costs if operating level is at 200 machine hours?
Assignment
XYZ Company s manufacturing overhead costs at various level of activity are
presentend below: ’

Month
March Machine
500 hours P 970 Total Overhead Costs
April
May 600 400
1,089 851
June 700 1,208
Tis ashe break down
follows: of the overhead costs in April at 400 machine-hour level of activity
Supplies
Salaries (Variable)
(Fixed) P260 300
Utilities
Total P851 (Mixed) 291
Required:
1.2. How much of June ’s overhead cost of 1,208 consisted utilities cost?
Using, least-squares method, determine the cost function for total overhead
costs?
3. What would be the total overhead costs if operating level is at 200 machine hours?
Assignment
XYZ Company s manufacturing overhead costs at various level of activity are
presentend below: ’

Month
March Machine
500 hours P 970 Total Overhead Costs
April
May 600 400
1,089 851
June 700 1,208
Tis ashe break down
follows: of the overhead costs in April at 400 machine-hour level of activity
Supplies
Salaries (Variable)
(Fixed) P260 300
Utilities
Total P851 (Mixed) 291
Required:
1.2. How much of June ’s overhead cost of 1,208 consisted utilities cost?
Using, least-squares method, determine the cost function for total overhead
costs?
3. What would be the total overhead costs if operating level is at 200 machine hours?
Assignment
XYZ Company s manufacturing overhead costs at various level of activity are
presentend below: ’

Month
March Machine
500 hours P 970 Total Overhead Costs
April
May 600 400
1,089 851
June 700 1,208
Tis ashe break down
follows: of the overhead costs in April at 400 machine-hour level of activity
Supplies
Salaries (Variable)
(Fixed) P260 300
Utilities
Total P851 (Mixed) 291
Required:
1.2. How much of June ’s overhead cost of 1,208 consisted utilities cost?
Using, least-squares method, determine the cost function for total overhead
costs?
3. What would be the total overhead costs if operating level is at 200 machine hours?

You might also like