0% found this document useful (0 votes)
16 views20 pages

Finalreport ITR

Uploaded by

Shreya Chavan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views20 pages

Finalreport ITR

Uploaded by

Shreya Chavan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

AN INDUSTRIAL TRAINING REPORT

ON
Web Development

SUBMITTED BY
Ms. Jagtap Sanika Dhananjay

UNDER THE GUIDANCE OF

Miss. Shaha.N.R

DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING


ARVIND GAVALI COLLEGE OF ENGINEERING, SATATA

Academic Year 2024-2025


CERTIFICATE

This is to certify that,

Ms. Jagtap Sanika Dhananjay


Arvind Gavali College of Engineering, Satara has successfully completed this “Web

Development (Industrial Training)”. Under my guidance in Academic year 2024-2025.

Date-

Place- Satara

Name and designation Name and designation Head Of Department Principal

of the Mentor/faculty of the External Examiner


Abstract

All diploma students are required to undergo industrial training for 6 weeks as a part of
curriculum to complete that after 4th semester of diploma. Industrial training is an important phase
of a students life. Training is acquiring skills and increasing the knowledge to do a specific job.
The main object of all industrial training is to prepare people to perform efficiently their own
particular tasks or to do another job quality well. Training prepares an individual so that one can
accomplish his industrial task, efficiently and effectively.

Industrial Training provides required professional and practical skills to the students. so, it
is very important for the student. This is an essential part in the development of the practical and
professional skills required of an engineer and an aid to prospective employment. for this training,
I am joined company, Sunbeam Institute of Information Technology, Karad. There we learnt Web
Development and prepare project for it.

The industrial training enables students to go out and gain more practical knowledge of

what they have been taught in school and to acquire industry bases skills.
Acknowledgment

It is my great pleasure to acknowledge my guide Ms. Patil S.D at a Satara who introduced
me to a fascinating realm of Industrial Training. Her invaluable guidance, constant inspiration,
unending support helped us a lot to focus our views in proper perspective. Her tireless enthusiasm
has always been a source of inspiration for us. Our deepest personal regards are due for her forever.

It is great privilege for me us express our sincere thanks to Mr. Pharande V. A in-charge
principal Arvind Gavali College of Engineering, Satara for his valuable suggestions, and constant
encouragement for our project work.

We sincerely acknowledge the help and co-operation from teaching and non- teaching staff
of the department of Computer Science and Engginering. Arvind Gavali College of Engineering,
Satara.

Sr.no Er.no Student Name Sign

1 2216170020 Jagtap Sanika Dhananjay

Place: Satara

Date:
Contents

Chapter 1:-Organizational Structure of industry .......................................................................................... 6


Chapter2:-Introduction of Industry ...............................................................................................................7
Chapter 3:Type of major equipments used in Industry .................................................................................8
Chapter 4:- Developing Processes with production planning .................................................................. 10
Chapter 5:-Safety procedure followed .................................................................................................... 12
Chapter 6:-Particulars of practical Experiences ...................................................................................... 13
Chapter 7:-Project Report ...................................................................................................................... 14
1.0 Rationale: ........................................................................................................................... 14
2.0 Intended Code Outcomes Addressed :................................................................................. 14
3.0 Literature Review: ............................................................................................................ 15
4.0 Actual Methodology Followed: .......................................................................................... 16
5.0 Resources Required: ........................................................................................................... 17
6.0 Output of the code: ............................................................................................................. 18
7.0 Skill Developed / Learning out of this Micro-Project : ........................................................ 21
8.0 Applications of Micro-Project : .......................................................................................... 21
9.0 Area of future improvement : .............................................................................................. 21
Chapter 8:-Special Experiences encountered during training .................................................................. 22
Chapter 1
Organizational Structure of industry

For Industrial Training, we joined “Sunbeam Institute of Information Technology” at Karad.


Sunbeam Institute of Information Technology is dedicated to maintaining a competitive edge
in today's evolving professional world. They understand the significance of personal and
technical skills in providing effective solutions. With a successful track record, SIIT offers
training, solutions, and services.
They've evolved into a multi-technology, multi-location competency centre with a
dynamic management team. Sunbeam IT Park in Hinjawadi houses state-of-the-art
classrooms, well-designed labs, and an equipped library. It provides a conducive learning
environment and practical exposure. SIIT is committed to assisting professionals and
students in their career growth, understanding the evolving industry landscape, and
delivering high-quality training and solutions.
Chapter 2

Introduction of Industry

For Industrial Training of six week after completion of second year, we joined software
company “Sunbeam Institute of Information Technology” at Karad. At Sunbeam we believe
retaining a competitive edge is imperative for any individual in today's professional world.
Companies are restructuring their organizations & reengineering their business processes. Not only
have the challenges become more demanding, but also the rewards of staying at the forefront seem
to be promising.

In this scenario, technical & personal skills which provide effective solutions & time
critical support are of principal significance for the long term growth of professionals. Sunbeam's
expertise in effectively delivering training, solutions & services has made it a favored institution
to many students & professionals focused on an aggressive career growth strategy.

Delivering training & solutions has made it a favored associate to many establishments
focused on aggressive growth strategies. Since it's humble beginnings in the late 90's Sunbeam
Group has today, evolved into a multi-technology, multi-location competency center with IT
professionals capable of delivering high-end technological training & solutions in diverse modes.
Their expertise in various IT fields has made Sunbeam Group a premium turnkey solution provider.
Chapter 3
Type of major equipments used in Industry
In order to provide the training on open source software, the “Sunbeam Institute of Information
Technology ” was founded. In this company, total working is done with laptops and computers.
Also they are developing websites using Web Development. For this training, use dell computer
system their specifications are as follows:

Specifications:

DELL inspiron:

• Processor: Intel (R) core (TM) i5-2365m cpu @ 1.40 GHz-64bit OS.

• OS: Windows 10Ultimate. Memory (RAM) :4.00GB DDR3.

• Display: Intel R-HD Graphics.

• (1366x768)landscape HDD: SATA 1TB.

• USB port: USB 2.0

• Cost: near about Rs.30,000

This is the example of the specification of laptops and Computers used in Industry. Same
as this dell inspiron another system also have samiliar specifications. Also the developer and
trainers used their laptops for working. This equipments used in research, production, distribution,
marketing, banking, team management, business automation, data storage, employees management
and very helpful to increase the productivity in lower cost, less time with high quality. That's why
the use of the computer is important in business. Computers can be designed to do almost anything
with information. Computers are said to control large and small machines which in the past were
controlled by humans.
They also take routine Maintenance of that machine because routine maintenance for a computer

involves taking regular steps that make your computer faster, more secure.

The Routine Maintenance of computers done in industry are as following:

- Back up your data.


- Clean dust from computer.
- Clean up cabling, and everything else too.
- Organize installation disks.
- Run antivirus and spyware scans regularly.
- Clean up software.
- Update everything
Chapter 4
Developing Processes with production planning

Production planning and control is concerned with implementing the plans, i.e. the detailed
scheduling, assigning of workloads to machines (and people), and the actual flow of work through
the system. In industry, with proper developing process software will be develop.

Following are the main developing process:

1. communication:
The software development starts with the communication between developer and

user or customer.

2. Planning:

It consists of complete estimation , scheduling for project development.

3. Modeling:
Modeling consists of complete requirement analysis and the design of the project

like algorithm, flowchart etc.

4. Construction:

Construction consists of code generation part and testing part.

5. Deployment:
Deployment step consists of delivering the software to the customer and take

feedback from them.


Chapter 6
Safety procedure followed

In our Industry, overall working done using the computers and laptops. There are various health
problems associated with the regular use of computers. For this reason, employers must be aware
of the regulations surrounding computer health and safety. Hence, we have to take some
precautions for it. List of safety precautions taken in Industry are as following :

1) Turn off power and unplug equipment before performing services.

2) Cover the sharp edges inside the computer case with tape.

3) Never open a power supply and a CRT monitors 4) Keep food and drinks out of the

industry workspace.

5) Always backup files used in Industry.

6) Install protective software only for computer safety purpose.

7) Always use secure connections in Industry.

8) Use desktop firewalls.

9) Always disconnect a computer from AC power and from any powered peripherals

while working on it.


Chapter 7

Particulars of practical Experiences

Industrial raining is very helpful for us. I have wonderful experience in this training. Web
Development workshop has benefited me a lot. Concepts are easy to understand because of easy
explination by guidance of Prashant Lad (Center Coordinator) and Pratik Ninganur (Project
Guide). Explanation made by putting real time examples.
Now a days, In the jungle web development is most popular in Industry. PHP and HTML is useful
programming language. This programming language is often used for general purpose
programming. This Language is Gaining huge popularity, therefore; the need to understand and
know the language. Hence we give the preference to python language. And with learning this
language, we have wonderful experience about new language HTML , PHP and with this training
period all basic concepts cleared.
While doing the Industrial Training we learn proper time management and task
Management. Also increased our supreme Communication skill. In industry, we achieved quick
learning ability and Problem Solving ability is developed due to work on Project. Confidence
around a computer and industry created. I am glad that I’ve taken industrial training via Sunbeam
Institutes of Information Technology. We learnt a lot about HTML and PHP. This training gives
great learning experience.
Chapter 8

Project Report

Title of Project: Online Appointment System

1.0 Rationale:
This is an internet based system that overcomes the issue of managing and booking
appointments according to visitors (for e.g. patients, customers) choice or requirements. The task
sometimes becomes very tedious for the compounder or doctor himself in manually allotting
appointments for the visitors as per their availability. The Online Appointment System provides
the power of direct interaction between visitors and any person choice as and when required for
your small problems. It can also enable visitor to upload their results which can be viewed by
visitors referred respective person. It can also maintain available appointment time, book
appointment, cancel appointment, and view his appointment history

2.0 Intended Code Outcomes Addressed :


• Develop program using control statement.

• Develop programs by applying various object oriented concepts

• Use form controls with validation to collect user inputs.

• Perform various database operations in PHP.


3.0 Literature Review:
The title of the micro project is Online Appointment System this project for
making this project in our group members we will all collect the information about a project. we
will discuss on our project topic with all group members. The Online Doctor Appointment
System project is main purpose of the project is to his understand the basic concept of PHP. This
is the basic level Online Appointment System project in PHP for bigger the main purpose of the
project is to understand the concept of PHP and Html. An online appointment system is a
webbased system which is made up of independent components or web pages, working together
for a common purpose. Such systems are available on the internet for the users to accomplish
some purpose. We use reference book like:

• Programing with PHP Author by Rasmus Lerdorf.

• PHP and MySQL Author by McGrath, MIKE. website by using internet

• http://www.w3schools.com

• http//www.tutorialpoint.com
4.0 Actual Methodology Followed:
The title our project Online Appointment System. We use internet to Give
appointment. For making this project first we collect all the information of our project. We
discussed on our project topic with group member by this project we use different PHP
methods. Such as Array, Function, Control Statement, inheritance, Constructor, Destructor,
Database etc In PHP tag. We also use html tags for design form.

We design form tag with its form element such as textbox, text area, button,
filed set, radio button, checkbox etc. This form element design using input tag. In this
system we define following modules: 1. Registration:
In the registration module, visitors fill up a registration form and confirm
appointment with any one person.
2. Login module:
In the login module, visitor’s login with username and password
provided by system and confirms appointment.

3. Cancel appointment:
In this module, visitor’s login account and using cancel appointment
button they cancel their appointment.
5.0 Resources Required:
Name of Specification Quantity Remark
resources
1. Laptop • Processor: Intel (R) core 1
(TM) i5-2365m cpu@ 1.40
GHz-64 bit OS.

• OS : Windows 7 Ultimate.

• Memory(
RAM) :8.00GB DDR3.

• Display: Intel R-HD


Graphics.
(1366x768)landscape

HDD: SATA 1TB.

• USB port: USB 2.0

2. Reference Book 1)Programing with PHP Author by 1 each


Rasmus Lerdorf.
2) PHP and MySQL Author by
McGrath, MIKE.
.

3. Internet Website: -
1)http://www.w3schools.com/

2)http://www.tutorialpoint.com/
6.0 Output of the code:

• Home Page

Registration page
7.0 Skill Developed / Learning out of this Micro-Project :
Time and resource management:

Is able to maximize personal efficiency by setting priorities and effectively


schedule activities an allocate resources.

Project tracking:

Can efficient use methods to track project progress? In addition, these skills are
also important listening, problem solving, decision making, team building and presentation,
organizational effectiveness, analysis and conceptual thinking.

8.0 Applications of Micro-Project:


• The online appointment booking system sends a reminder through SMS or email to the
customers. This reminds them of the upcoming scheduled meeting.

• The online appointment system also provides the feature to confirm the appointments
through reminders.

• An online appointment system is a software that contain tools and features that help the
businesses in scheduling meetings and bookings with customers.

• The online appointment booking software, these tools aid businesses in automating the
process of scheduling meetings with customers to provide business services.

9.0 Area of future improvement:


• In future everyone is busy with their life schedules so people always look for methods to
get easy and instant appointments for their any problems at their specific location.

• In future the online appointment system is higher and for that there should be much more
reliable and user friendly interface and websites.
Chapter 9
Special challenging Experiences encountered during training

While doing training, we faced different things. We realized there, that we have some duties
and responsibilities for working in proper manner. Internship challenges do hit hard because it is
the first time that we are in such environment and also aren’t very familiar with work-life issues.
Reaching late for classes or another work may be tolerated by others but in professional
workspace it isn’t acceptable and hence managing time can be really difficult for you. A balance
between work, academics and personal life also seems to be a challenge. Hence, self management
can achieved. In this training, we learnt various things. The different tasks assign us to perform.
Hence, solving that tasks properly and completed in particular time is the challenge faced in
company.

You might also like