Unit 1: Basics of Software Testing and Testing Methods
Software testing:
• Software testing is defined as performing Verification and Validation of the Software
Product for its correctness and accuracy of working.
• Software Testing is the process of executing a program with the intent of finding errors.
• A successful test is one that uncovers an as-yet-undiscovered error.
• Testing can show the presence of bugs but never their absence.
• Testing is a support function that helps developers look good by finding their mistakes
before anyone else does.
• Curiosity
• Think from users perspective
• Be a good judge of your product
Bug, Fault & Failure
• A person makes an Error
• That creates a fault in software
• That can cause a failure in operation
• Error: An error is a human action that produces the incorrect result that results in
a fault.
• Bug: The presence of error at the time of execution of the software.
• Fault: State of software caused by an error.
• Failure: Deviation of the software from its expected result. It is an event.
• Defect: A defect is an error or a bug, in the application which is created. A programmer
while designing and building the software can make mistakes or error. These mistakes or
errors mean that there are flaws in the software. These are called defects.
Sources of defects
Education
Page 3
Unit 1: Basics of Software Testing and Testing Methods
Transcription
Process
Test Plan
A test plan is a systematic approach to testing a system i.e. software. The plan typically contains
a detailed understanding of what the eventual testing workflow will be.
Test Case
A test case is a specific procedure of testing a particular requirement.
It will include:
Process model is a way to represent any given phase of software development that prevent and
minimize the delay between defect injection and defect detection/ correction.
Entry criteria, specifies when that phase can be started also included the inputs for the phase.
Tasks or steps that need to be carried out in that phase along with measurements that characterize
the tasks. Verification, which specifies methods of checking that tasks have been carried out
correctly. Clear entry criteria make sure that a given phase does not start prematurely. The
verification for each phase helps to prevent defects. At least defects can be minimized.
Exit criteria, which stipulate the conditions under which one can consider the phases as done and
included are the outputs for the phase.
Exit criteria may include:
Page 4
Unit 1: Basics of Software Testing and Testing Methods
ENTRY CRITERIA
Entry Criteria for QA testing is defined as “Specific conditions or on-going activities that mustbe
present before a process can begin”. In the Systems Development Life Cycle it also specifies which
entry criteria are required at each phase. Additionally, it is also important to define the time
interval or required amount of lead time that an entry criteria item is available to theprocess.
Input can be divided into two categories. The first is what we receive from development. The
second is what we produce that acts as input to later test process steps.
2. Design Document
3. Change Control
4. Turnover Document
2. Test Strategy
3. Test Plan
By referencing the Entry Exit Criteria matrix, we get the clarity of the deliverables expected
from each phase. The matrix should contain “date required” and should be modified to meet the
specific goals and requirements of each test effort based on size and complexity.
EXIT CRITERIA
Exit Criteria is often viewed as a single document concluding the end of a life cycle phase. Exit
Criteria is defined as “The specific conditions or on-going activities that must be present before a
life cycle phase can be considered complete. The life cycle specifies which exit criteria are required
at each phase”. This definition identifies the intermediate deliverables, and allows us to track them
as independent events.
1. Test Strategy
2. Test Plan
4. Test Logs
By identifying the specific Exit criteria, we are able to identify and plan how these steps and
processes fit into the life cycle. All of the Exit Criteria listed above, less the Test
Summary/Findings Report; act as Entry Criteria to alter process.
• Verification
• Verification will help to determine whether the software is of high quality, but it will not
ensure that the system is useful. Verification is concerned with whether the system is well-
engineered and error-free.
• Walkthrough
• Inspection
• Review
Page 6
Unit 1: Basics of Software Testing and Testing Methods
What is Validation?
Definition: The process of evaluating software during or at the end of the development
process to determine whether it satisfies specified requirements.
• Validation is the process of evaluating the final product to check whether the software
meets the customer expectations and requirements. It is a dynamic mechanism of validating
and testing the actual product.
• Testing
• End Users
Verification Validation
2. It does not involve executing the code. 2. It always involves executing the code.
4. Verification uses methods like inspections, 4. Validation uses methods like black box
reviews, walkthroughs, and Desk-checking etc. (functional) testing, gray box testing, and
white box (structural) testing etc.
6. It can catch errors that validation cannot 6. It can catch errors that verification cannot
catch. It is low level exercise. catch. It is High Level Exercise.
8. Verification is done by QA team to ensure that 8. Validation is carried out with the
the software is as per the specifications in the involvement of testing team.
SRS document.
Page 7
Unit 1: Basics of Software Testing and Testing Methods
Page 8
Unit 1: Basics of Software Testing and Testing Methods
Verification and validation model makes the V-model. It is sequential path of execution of
processes. Each phase must be completed before the next phase begins. Under V-model, the
corresponding testing phase of the development phase is planned in parallel. So there is verification
on one side of V & validation phase on the other side of V.
Verification Phase:
1. Overall Business Requirement: In this first phase of the development cycle, the product
requirements are understood from customer perspective. This phase involves detailed
communication with the customer to understand his expectations and exact requirements. The
acceptance test design planning is done at this stage as business requirements can be used as an
input for acceptance testing.
2. Software Requirement: Once the product requirements are clearly known, the system can be
designed. The system design comprises of understanding & detailing the complete hardware,
software & communication set up for the product under development. System test plan isdesigned
based on system design. Doing this at earlier stage leaves more time for actual test execution later.
3. High level design: High level specification are understood & designed in this phase. Usually
more than one technical approach is proposed & based on the technical & financial feasibility, the
final decision is taken. System design is broken down further into modules taking updifferent
functionality.
4. Low level design: In this phase the detailed integral design for all the system modules is
specified. It is important that the design is compatible with the other modules in the system & other
external system. Components tests can be designed at this stage based on the internal module
design,
5. Coding: The actual coding of the system modules designed in the design phase is taken up in
the coding phase. The base suitable programming language is decided base on requirements.
Coding is done based on the coding guidelines & standards.
Page 9
Unit 1: Basics of Software Testing and Testing Methods
Validation:
1. Unit Testing: Unit testing designed in coding are executed on the code during this validation
phase. This helps to eliminate bugs at an early stage.
2. Components testing: This is associated with module design helps to eliminate defects in
individual modules.
3. Integration Testing: It is associated with high level design phase & it is performed to test the
coexistence & communication of the internal modules within the system
5. System Testing: It is associated with system design phase. It checks the entire system
functionality & the communication of the system under development with external systems. Most
of the software & hardware compatibility issues can be uncovered using system test execution.
6. Acceptance Testing: It is associated with overall & involves testing the product in user
environment. These tests uncover the compatibility issues with the other systems available in the
user environment. It also uncovers the non-functional issues such as load & performance defects
in the actual user environment.
Quality Assurance:
i. It is Process oriented activities.
ii. A part of quality management focused on providing confidence that quality requirements will
be fulfilled.
iii. All the planned and systematic activities implemented within the quality system that can be
demonstrated to provide confidence that a product or service will fulfill requirements for quality
iv. Quality Assurance is fundamentally focused on planning and documenting those processes to
assure quality including things such as quality plans and inspection and test plans.
v. Quality Assurance is a system for evaluating performance, service, of the quality of a product
against a system, standard or specified requirement for customers.
vi. Quality Assurance is a complete system to assure the quality of products or services. It is not
only a process, but a complete system including also control. It is a way of management.
● Standards: Standards are the criteria’s to which the s/w product is compared.
● Documentations Standards: Specify form and Contents for planning, analysis and
product documentation and consistency throughout a project.
● Design Standards: Specify forms and contents of design product. They provide rules and
methods for translating the s/w requirements into the s/w design.
● Code Standards: Specify the language in which code is to written and define any
restrictions on use of language features.
● They define legal language structures, style conversions, rules for data structure and
interface.
● Procedure: Expected steps to be followed in carrying out a process.
Quality Control:
i. It is Product oriented activities.
ii. A part of quality management focused on fulfilling quality requirements.
iii. The operational techniques and activities used to fulfill requirements for quality.
iv. Quality Control on the other hand is the physical verification that the product conforms to
these planned arrangements by inspection, measurement etc.
Page 10
Unit 1: Basics of Software Testing and Testing Methods
v. Quality Control is the process involved within the system to ensure job management,
competence and performance during the manufacturing of the product or service to ensure it meets
the quality plan as designed.
vi. Quality Control just measures and determines the quality level of products or services.
Methods of testing:
1. Static Testing :
• Static testing is the testing of the software work products manually, or with a set of tools,
but they are not executed.
• It starts early in the Life cycle and so it is done during the verification process.
• It does not need computer as the testing of program is done without executing the
program. For example: reviewing, walk through, inspection, etc.
• Static testing consists of following methods
1) Walkthrough
2) Inspection
3) Technical Review
• Since static testing can start early in the life cycle, early feedback on quality issues can be
established.
• By detecting defects at an early stage, rework costs are most often relatively low.
• Since rework effort is substantially reduced, development productivity figures are likely
to increase.
• The evaluation by a team has the additional advantage that there is an exchange of
information between the participants.
• Static tests contribute to an increased awareness of quality issues.
2. Dynamic Testing
• Dynamic testing (or dynamic analysis) is a term used in software engineering to describe
the testing of the dynamic behavior of code.
• That is, dynamic analysis refers to the examination of the physical response from the
system to variables that are not constant and change with time.
• In dynamic testing the software must actually be compiled and run.
Page 11
Unit 1: Basics of Software Testing and Testing Methods
• It involves working with the software, giving input values and checking if the output is as
expected by executing specific test cases which can be done manually or with the use of
an automated process
• The process and function of dynamic testing in software development, dynamic testing can
be divided into unit testing, integration testing, system testing, acceptance testing and
finally regression testing.
• Unit testing is a test that focuses on the correctness of the basic components of software.
Unit testing falls into the category of white-box testing. In the entire quality inspection
system, unit testing needs to be completed by the product group, and then the software is
handed over to the testing department.
• Integration testing is used to detect if the interfaces between the various units are properly
connected during the integration process of the entire software.
• Testing a software system that has completed integration is called a system test, and the
purpose of the test is to verify that the correctness and performance of the software system
meet the requirements specified in its specifications. Testers should follow the established
test plan. When testing the robustness and ease of use of the software, its input, output, and
other dynamic operational behaviour should be compared to the software specifications. If
the software specification is incomplete, the system test is more dependent on the tester's
work experience and judgment, such a test is not sufficient. The system test is Black-box
testing.
• This is the final test before the software is put into use. It is the buyer's trial process of the
software. In the actual work of the company, it is usually implemented by asking the
customer to try or release the Beta version of the software. The acceptance test is Black-
box testing.
• The purpose of regression testing is to verify and modify the acceptance test results in
the software maintenance phase. In practical applications, the handling of customer
complaints is an embodiment of regression testing.
Advantages of Dynamic Testing
• Dynamic testing could identify the weak areas in the runtime environment.
• Dynamic testing supports application analysis even if the tester does not have an actual
code.
• Dynamic testing could identify some vulnerabilities that are difficult to find by static
testing.
• Dynamic testing also could verify the correctness of static testing results.
• Dynamic testing could be applied to any application.
• Automated tools may give the wrong security, such as check everything.
• Automated tools can generate false positives and false negatives.
• Finding trained dynamic test professionals is not easy.
• Dynamic testing is hard to track down the vulnerabilities in the code, and it takes longer
to fix the problem. Therefore, fixing bugs becomes expensive.
Page 12
Unit 1: Basics of Software Testing and Testing Methods
1) Walkthrough
• In walkthrough, author guides the review team via the document to fulfill the common
understanding and collecting the feedback.
• Walkthrough is not a formal process.
• In walkthrough, a review team does not require to do detailed study before meeting while
authors are already in the scope of preparation.
• Walkthrough is useful for higher-level documents i.e requirement specification and
architectural documents.
Goals of Walkthrough
• Make the document available for the stakeholders both outside and inside the software
discipline for collecting the information about the topic under documentation.
• Describe and evaluate the content of the document.
• Study and discuss the validity of possible alternatives and proposed solutions.
Page 13
Unit 1: Basics of Software Testing and Testing Methods
Saves time and money as defects are found and rectified very early in the lifecycle.
This provides value-added comments from reviewers with different technical
backgrounds and experience.
It notifies the project management team about the progress of the development process.
It creates awareness about different development or maintenance methodologies which
can provide a professional growth to participants.
2) Inspection
• The trained moderator guides the Inspection. It is most formal type of review.
• The reviewers are prepared and check the documents before the meeting.
• In Inspection, a separate preparation is achieved when the product is examined and
defects are found. These defects are documented in issue log.
• In Inspection, moderator performs a formal follow-up by applying exit criteria.
Goals of Inspection
• Assist the author to improve the quality of the document under inspection.
• Efficiently and rapidly remove the defects.
• Generating the documents with higher level of quality and it helps to improve the product
quality.
• It learns from the previous defects found and prohibits the occurrence of similar defects.
• Generate common understanding by interchanging information.
Inspection Walkthrough
Formal Informal
. Page 14
Unit 1: Basics of Software Testing and Testing Methods
Recorder records the defects Author makes a note of defects and suggestions
offered by team mate
Moderator has a role in making sure that the Informal, so there is no moderator
discussions proceed on the productive lines
3) Technical Review
• Technical review is a discussion meeting that focuses on technical content of the
document. It is a less formal review.
• It is guided by a trained moderator or a technical expert.
i. Code Functional Testing involves tracking a piece of data completely through the software.
ii. At the unit test level this would just be through an individual module or function.
iii. The same tracking could be done through several integrated modules or even through the
entire software product although it would be more time consuming to do so.
iv. During data flow, the check is made for the proper declaration of variables declared and
the loops used are declared and used properly.
For example
1. #include<stdio.h>
2. void main()
3. {
4. int i , fact= 1, n;
6. scan
7. for(i =1; i<=n; i++)
8. fact = fact * i;
9.printf(“\n Factorial of number is %d”,fact);
10. }
i. The logical approach is to divide the code just as you did in black-box testing into its data
and its states (or program flow).
ii. By looking at the software from the same perspective, you can more easily map the white-
box information you gain to the black-box case you have already written.
. Page 15
Unit 1: Basics of Software Testing and Testing Methods
iii. Consider the data first. Data includes all the variables, constants, arrays, data structures,
keyboard and mouse input, files and screen input and output, and I/O to other devices such as
modems, networks, and so on.
For example
1. #include<stdio.h>
2. void main()
3. {
4. int i , fact= 1, n;
5. printf(“Enter the number”);
6. scanf(“%d”,&n);
7. for(i =1; i<=n; i++)
8. fact = fact * i;
9.printf(“\n Factorial of number is %d”,fact);
10. }
The declaration of data is complete with the assignment statement and the variable
declaration statements. All the variable declared are properly utilized.
i. The most straightforward form of code coverage is called statement coverage or line
coverage.
ii. If you‘re monitoring statement coverage while you test your software, your goal is to
make sure that you execute every statement in the program at least once.
iii. With line coverage the tester tests the code line by line giving the relevant output.
For example
1. #include
2. void main()
3. {
4. int i , fact= 1, n;
5. printf(―enter the number ―);
6. scanf(―%d‖, &n);
7. for(i =1 ;i <=n; i++)
8. fact = fact * i;
9. printf(“\n Factorial of number is %d”,fact);
10. }
. Page 16
Unit 1: Basics of Software Testing and Testing Methods
v. Every branch (decision) taken each way, true and false. vi. It helps in validating all the
branches in the code making sure that no branch leads to abnormal behavior of the
application.
Tests are done from a user’s point of view and will help in exposing discrepancies in the
specifications.
Tester need not know programming languages or how the software has been
implemented.
. Page 17
Unit 1: Basics of Software Testing and Testing Methods
Tests can be conducted by a body independent from the developers, allowing for an
objective perspective and the avoidance of developer-bias.
Only a small number of possible inputs can be tested and many program paths will be left
untested.
Without clear specifications, which is the situation in many projects, test cases will be
difficult to design.
Tests can be redundant if the software designer/ developer has already run a test case.
Ever wondered why a soothsayer closes the eyes when foretelling events? So is almost
the case in Black Box Testing.
• Defining Test Completion Criteria - Testing is completed only when all the functional
and non-functional testing is complete.
• Design Test Cases - A Test case has five parameters namely the initial state or
precondition, data setup, the inputs, expected outcomes and actual outcomes.
• Execute Tests - Execute the test cases against the system under test and document the
results.
• Verify Test Results - Verify if the expected and actual results match each other.
• Verify Test Coverage - Verify if the tests cover both functional and non-functional
aspects of the requirement.
Page 18
Unit 1: Basics of Software Testing and Testing Methods
• Track and Manage Defects - Any defects detected during the testing process goes
through the defect life cycle and are tracked to resolution. Defect Statistics are
maintained which will give us the overall status of the project.
• For the most part, errors are observed in the extreme ends of the input values, so these
extreme values like start/end or lower/upper values are called Boundary values and
analysis of these Boundary values is called “Boundary value analysis”. It is also
sometimes known as ‘range checking’.
• Boundary value analysis is used to find the errors at boundaries of input domain rather
than finding those errors in the center of input.
• This is one of the software testing technique in which the test cases are designed to
include values at the boundary. If the input data is used within the boundary value limits,
then it is said to be Positive Testing. If the input data is picked outside the boundary value
limits, then it is said to be Negative Testing.
• Boundary value analysis is another black box test design technique and it is used to find
the errors at boundaries of input domain rather than finding those errors in the center of
input.
• Each boundary has a valid boundary value and an invalid boundary value. Test cases are
designed based on the both valid and invalid boundary values. Typically, we choose one
test case from each boundary.
Boundary value analysis is a black box testing and is also applies to white box testing.
Internal data structures like arrays, stacks and queues need to be checked for boundary or
limit conditions; when there are linked lists used as internal structures, the behavior of the
list at the beginning and end have to be tested thoroughly.
• Boundary value analysis help identify the test cases that are most likely to uncover
defects
For example : Suppose you have very important tool at office, accepts valid User Name
and Password field to work on that tool, and accepts minimum 8 characters and
maximum 12 characters. Valid range 8-12, Invalid range 7 or less than 7 and Invalid
range 13 or more than 13.
19 | P a g e
Unit 1: Basics of Software Testing and Testing Methods
Test cases for the application whose input box accepts numbers between 1-1000. Valid range 1-
1000, Invalid range 0 and Invalid range 1001 or more.
• Test Cases 1: Consider test data exactly as the input boundaries of input domain i.e.
values 1 and 1000.
• Test Cases 2: Consider test data with values just below the extreme edges of input
domains i.e. values 0 and 999.
• Test Cases 3: Consider test data with values just above the extreme edges of input
domain i.e. values 2 and 1001.
3) Equivalence Partitioning
• This reduces the number of permutation & combination of input, output values used for
testing, thereby increasing the coverage and reducing the effort involved in testing.
• The set of input values that generate one single expected output is called a partition.
• When the behavior of the software is the same for a set of values, then the set is termed as
equivalence class or partition.
• Example: An insurance company that has the following premium rates based on the age
group. A life insurance company has base premium of $0.50 for all ages. Based on the
20 | P a g e
Unit 1: Basics of Software Testing and Testing Methods
age group, an additional monthly premium has to pay that is as listed in the table below.
For example, a person aged 34 has to pay a premium=$0.50 +$ 1.65=$2.15
• Based on the equivalence portioning technique, the equivalence partitions that are based
on age are given below: