Or 2025
Or 2025
8
23
PB2371 [Total No. of Pages : 5
ic -
[6263]-221
ta t
B.E. (Mechanical)
4s
OPERATION RESEARCH
0:3
02 91
(2019 Pattern) (Semester - VII) (Elective - IV) (402045D)
4:0
0
41
Time : 2½ Hours] 2/0 13 [Max. Marks : 70
Instructions to the candidates:
0
5/2
.23 GP
8
C
23
4) Assume suitable data, if necessary.
ic-
16
t
sta
Q1) a) Use simplex method to solve the following LPP. [10]
8.2
:34
Maximize Z = 2x1 + x2
.24
91
:00
49
Subject to constraints
14
30
4x1 + x2 < 8;
/20
GP
/05
4x1 – x2 < 8;
2
CE
x1, x2 > 0;
82
8
23
b) Discuss the following terms related to LPP. [7]
.23
ic-
16
i) Objective function
tat
8.2
4s
0:3
91
4:0
OR
01
02
5/2
Q2) a) One kind of cake requires 200g of flour and 25g of fat, and another kind
GP
of cake requires 100g of flour and 50g of fat. Find the maximum number
2/0
P.T.O.
Q3) a) Discuss the following related to the transportation model. [8]
8
23
i) Feasible solution
ic -
ta t
ii) Optimum solution
4s
iii) Non-degenerate basic feasible solution
0:3
02 91
iv) Degenerate basic feasible solution
4:0
0
41
b) Find out the initial feasible solution by Vogel’s Approximation Method
2/0 13
(VAM). [10]
0
5/2
.23 GP
Stores Availability
E
I II III IV
82
8
C
23
A 21 16 15 13 11
ic-
16
t
sta
Warehouse B 17 18 14 23 13
8.2
:34
C 32 27 18 41 19
.24
91
:00
49
Requirement 6 10 12 15
14
30
24
01
OR
/20
GP
/05
Q4) a) In a construction site there are four cranes. Each crane must be allocated
2
CE
82
8
to one job. The time required to set up each crane for each job is shown
23
in table. Find the best assignment of cranes to the jobs, so that the total
.23
tat
8.2
4s
Job
.24
0:3
I II III IV
91
49
4:0
30
Crane A 5 7 11 6
41
01
02
B 8 5 9 6
5/2
GP
C 4 7 10 7
2/0
CE
D 10 4 8 3
82
.23
[6263]-221 2
49
Q5) a) A bank has decided to modernize its office. The major elements of the
8
project are as follows.
23
ic -
Activity Description Predecessor Duration
ta t
Activity (Days)
4s
A Design New Premises --- 14
0:3
02 91
4:0
B Obtain tenders from contractors A 4
0
41
C 2/0 13
Select the contractor B 2
0
D Arrange details with selected contractor C 1
5/2
.23 GP
8
F Arrange storage of equipment E 3
C
23
ic-
G Arrange disposal of other equipment E 2
16
t
sta
H Order new equipment E 4
8.2
:34
.24
disposal D, F, G 4
/20
GP
/05
8
23
.23
tat
ii) Find out the critical path
8.2
4s
iii) For each non-critical activity find out the total, free and independent
.24
0:3
4:0
30
i) Gradual failure
02
5/2
GP
v) Random failure
8.2
OR
.24
[6263]-221 3
49
Q6) a) A truck owner finds from his past records that the maintenance cost per
8
year of a truck whose purchase price is Rs. 8,000 are as follows : [10]
23
ic -
Year 1 2 3 4 5 6 7 8
ta t
4s
Maintenance Cost (Rs.) 1000 1300 1700 2000 2900 3800 4800 6000
0:3
02 91
Resale price (Rs.) 4000 2000 1200 600 500 400 400 400
4:0
0
41
Determine at which time it is profitable to replace the truck.
2/0 13
b) Differentiate between CPM and PERT and also discuss various floats
0
5/2
.23 GP
8
C
23
Q7) a) A salesman located in a city A decided to travel to city B. He knew the
ic-
distances of alternative routes from city A to city B. He then drew a
16
t
sta
8.2
:34
city 1. The destination city B is city 10. Other cities through which the
.24
91
salesman will have to pass through are numbered 2 to 9. The arrow
:00
49
on each route. The salesman problem is to find the shortest route that
24
01
covers all the selected cities from A to B. The time for each activity is
/20
8
23
.23
ic-
16
tat
8.2
4s
.24
0:3
91
49
4:0
30
41
01
02
5/2
GP
2/0
CE
82
.23
16
8.2
.24
[6263]-221 4
49
Activity Duration Activity Duration
8
23
1-2 4 4-5 6
ic -
1-3 6 4-6 10
ta t
1-4 3 4-7 5
4s
2-5 7 5-8 4
0:3
2-6 10 5-9 8
02 91
4:0
2-7 5 6-8 3
0
41
3-5 2/0 13 3 6-9 7
3-6 8 7-8 8
0
5/2
.23 GP
3-7 4 7-9 4
8-10 7
E
82
8
9-10 9
C
23
ic-
b) Explain in brief methodology of Monto Carlo Simulation. [5]
16
t
sta
8.2
Q8) a) A company has five salesmen who have to be allocated to four marketing
:34
.24
zones. The return (profit) from each zone depends upon the numbers of
91
:00
49
salesman working in that zone. The expected return for different numbers
14
30
8
0 30 35 42
23
.23
ic-
1 45 45 54
16
tat
2 60 52 60
8.2
4s
3 70 64 70
.24
0:3
4 79 72 82
91
49
4:0
5 90 82 95
30
41
6 98 93 102
01
02
7 105 98 110
5/2
GP
9 90 100 110
CE
82
.24
[6263]-221 5
49