0% found this document useful (0 votes)
327 views3 pages

NAHB Cost Codes

The document outlines various cost categories and corresponding cost codes related to construction, including preparation, excavation, rough structure, full enclosure, finishing trades, and completion. Additionally, it details variance categories and codes that may affect project costs, such as plans, estimating, purchasing, weather, site conditions, trade contractor/vendor issues, field supervision, and sales & marketing. This structured information serves as a reference for managing construction costs and potential variances.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
327 views3 pages

NAHB Cost Codes

The document outlines various cost categories and corresponding cost codes related to construction, including preparation, excavation, rough structure, full enclosure, finishing trades, and completion. Additionally, it details variance categories and codes that may affect project costs, such as plans, estimating, purchasing, weather, site conditions, trade contractor/vendor issues, field supervision, and sales & marketing. This structured information serves as a reference for managing construction costs and potential variances.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

CostCategory CostCode

1000 - 1999 Preparation Preliminaries 1010 - Building permits


1000 - 1999 Preparation Preliminaries 1020 - HBA assessments
1000 - 1999 Preparation Preliminaries 1030 - Warranty fees
1000 - 1999 Preparation Preliminaries 1110 - Blueprints
1000 - 1999 Preparation Preliminaries 1120 - Surveys
1000 - 1999 Preparation Preliminaries 1210 - Lot clearing
1000 - 1999 Preparation Preliminaries 1220 - Fill dirt and material
1000 - 1999 Preparation Preliminaries 1300 - Demolition
1000 - 1999 Preparation Preliminaries 1400 - Temporary electric
1000 - 1999 Preparation Preliminaries 1420 - Individual wells
1000 - 1999 Preparation Preliminaries 1430 - Water service
1000 - 1999 Preparation Preliminaries 1440 - Septic system
1000 - 1999 Preparation Preliminaries 1450 - Sewer system
1000 - 1999 Preparation Preliminaries 1460 - Gas service
1000 - 1999 Preparation Preliminaries 1470 - Electric service
1000 - 1999 Preparation Preliminaries 1480 - Telephone service
1000 - 1999 Preparation Preliminaries 1490 - Other utility connections
2000 - 2999 Excavation and Foundation 2000 - Excavation and backfill
2000 - 2999 Excavation and Foundation 2010 - Plumbing—ground
2000 - 2999 Excavation and Foundation 2100 - Footings and foundation
2000 - 2999 Excavation and Foundation 2105 - Rebar and reinforcing steel
2000 - 2999 Excavation and Foundation 2110 - Concrete block
2000 - 2999 Excavation and Foundation 2120 - Rough grading
2000 - 2999 Excavation and Foundation 2130 - Window wells
2000 - 2999 Excavation and Foundation 2200 - Waterproofing
2000 - 2999 Excavation and Foundation 2300 - Termite protection
3000 - 3999 Rough Structure 3100 - Structural steel
3000 - 3999 Rough Structure 3110 - Lumber—1st package
3000 - 3999 Rough Structure 3120 - Lumber—2nd package
3000 - 3999 Rough Structure 3130 - Lumber—3rd package
3000 - 3999 Rough Structure 3140 - Trusses
3000 - 3999 Rough Structure 3150 - Miscellaneous lumber
3000 - 3999 Rough Structure 3210 - Framing labor—draw #1
3000 - 3999 Rough Structure 3220 - Framing labor—draw #2
3000 - 3999 Rough Structure 3230 - Framing labor—draw #3
3000 - 3999 Rough Structure 3300 - Windows
3000 - 3999 Rough Structure 3350 - Skylights
3000 - 3999 Rough Structure 3400 - Exterior siding
3000 - 3999 Rough Structure 3410 - Exterior trim labor
3000 - 3999 Rough Structure 3500 - Flatwork material
3000 - 3999 Rough Structure 3550 - Flatwork labor
3000 - 3999 Rough Structure 3610 - HVAC—rough
3000 - 3999 Rough Structure 3720 - Plumbing—rough
3000 - 3999 Rough Structure 3810 - Electrical—rough
3000 - 3999 Rough Structure 3910 - Gutters and downspouts
4000 - 4999 Full Enclosure 4100 - Roofing material
4000 - 4999 Full Enclosure 4150 - Roofing labor
4000 - 4999 Full Enclosure 4200 - Masonry material
4000 - 4999 Full Enclosure 4250 - Masonry labor
4000 - 4999 Full Enclosure 4300 - Exterior doors
4000 - 4999 Full Enclosure 4350 - Garage door
4000 - 4999 Full Enclosure 4400 - Insulation
4000 - 4999 Full Enclosure 4500 - Fireplaces
4000 - 4999 Full Enclosure 4600 - Painting—exterior
5000 - 5999 Finishing Trades 5100 - Drywall
5000 - 5999 Finishing Trades 5200 - Interior trim material
5000 - 5999 Finishing Trades 5250 - Interior trim labor
5000 - 5999 Finishing Trades 5300 - Painting—interior
5000 - 5999 Finishing Trades 5400 - Cabinets and vanities
5000 - 5999 Finishing Trades 5450 - Countertops
5000 - 5999 Finishing Trades 5510 - Ceramic tile
5000 - 5999 Finishing Trades 5520 - Special flooring
5000 - 5999 Finishing Trades 5530 - Vinyl
5000 - 5999 Finishing Trades 5540 - Carpet
5000 - 5999 Finishing Trades 5610 - Hardware
5000 - 5999 Finishing Trades 5620 - Shower doors and mirrors
5000 - 5999 Finishing Trades 5630 - Appliances
5000 - 5999 Finishing Trades 5700 - HVAC—final
5000 - 5999 Finishing Trades 5710 - Plumbing—final
5000 - 5999 Finishing Trades 5720 - Electrical fixtures
5000 - 5999 Finishing Trades 5730 - Electrical—final
5000 - 5999 Finishing Trades 5810 - Wall coverings
5000 - 5999 Finishing Trades 5890 - Special finishes
6000 - 6999 Completion and Inspection 6100 - Clean-up
6000 - 6999 Completion and Inspection 6200 - Final grade
6000 - 6999 Completion and Inspection 6300 - Driveways
6000 - 6999 Completion and Inspection 6400 - Patios, walks
6000 - 6999 Completion and Inspection 6450 - Decks
6000 - 6999 Completion and Inspection 6490 - Fences
6000 - 6999 Completion and Inspection 6500 - Ornamental iron
6000 - 6999 Completion and Inspection 6600 - Landscaping
6000 - 6999 Completion and Inspection 6700 - Pools
Buildertrend Default Buildertrend Flat Rate
VarianceCategory VarianceCodes
0 - 9 Plans 01 - Dimensioning Error
0 - 9 Plans 02 - Unclear detail
0 - 9 Plans 03 - Code violation
10 - 19 Estimating 11 - Omitted from estimate
10 - 19 Estimating 12 - Data entry error (typo)
10 - 19 Estimating 13 - Take-off error
10 - 19 Estimating 14 - Missed in EPO review
20 - 29 Purchasing 21 - Price change
20 - 29 Purchasing 22 - Vendor change
20 - 29 Purchasing 23 - Omitted in SOW
20 - 29 Purchasing 24 - Short-shipped
20 - 29 Purchasing 25 - Wrong material shipped
20 - 29 Purchasing 26 - Poor quality of material
20 - 29 Purchasing 27 - Tax-rate difference
30 - 39 Weather 31 - Wet weather
30 - 39 Weather 32 - Freezing conditions
30 - 39 Weather 33 - Wind/storm damage
30 - 39 Weather 34 - Weather precaution
40 - 49 Site Conditions 41 - Unanticipated sub-surface
40 - 49 Site Conditions 42 - Elevation varies from standard
40 - 49 Site Conditions 43 - Special sites cleaning
40 - 49 Site Conditions 44 - Streets not in
40 - 49 Site Conditions 45 - Dirt needed for grade
40 - 49 Site Conditions 46 - Dirt removal needed
40 - 49 Site Conditions 47 - Code Official Mandated
50 - 59 Trade Contractor/Vendor 51 - Error/damage by trade
50 - 59 Trade Contractor/Vendor 52 - Incorrect use of material
50 - 59 Trade Contractor/Vendor 53 - Failure to protect work
50 - 59 Trade Contractor/Vendor 54 - Replace inferior work
60 - 69 Field Supervision 61 - Superintendent error
60 - 69 Field Supervision 62 - Management concession
60 - 69 Field Supervision 63 - Theft
60 - 69 Field Supervision 64 - Vandalism
60 - 69 Field Supervision 65 - Transfer materials
70 - 79 Sales & Marketing 71 - Sales concession
70 - 79 Sales & Marketing 72 - Customer change order
70 - 79 Sales & Marketing 73 - Allowance change order