Costing Hydrographic Survey Projects
Costing Hydrographic Survey Projects
9 Gyroscope DR 3 50,000
13 Magnetometer DR 3 120,000
TOTAL
Operational - Personnel & Equipment
1 Snr. Hydrographic Surveyor/Party Chief DR 250,000
40.8
2 Surveyor DR 40.8 200,000
250,000
400,000
400,000
400,000
400,000
150,000
100,000
2,100,000
100,000
50,000
100,000
150,000
250,000
120,000
7,500,000
300,000
8,570,000
750,000
1,200,000
1,200,000
1,200,000
1,200,000
450,000
300,000
300,000 100m
150,000
300,000
450,000
750,000
360,000
22,500,000
900,000
32,010,000
20k
m
20k
10,200,000
m
16,320,000
16,320,000
16,320,000
16,320,000
6,120,000
4,080,000
4,080,000
2,040,000
4,080,000
6,120,000 20km
10,200,000
4,896,000
306,000,000
12,240,000
435,336,000
2,550,000 StandyTime due to weather is estimated at 25%-30% of Operational Time (depends on the season of the year and the geographical area)
4,080,000
4,080,000
4,080,000
4,080,000
1,530,000
1,020,000
1,020,000
510,000
1,020,000
1,530,000
2,550,000
1,224,000
76,500,000
3,060,000
108,834,000
450,000
30,200,000
24,000,000
30,650,000
24,450,000
606,830,000
600,630,000
809,107 750=$1
800,840 750=$1
121,366,000
180,189,000
728,196,000
787,019,000
970,928 750=$1
1,049,359 750=$1
NGN 1,967,548
$2,623.4
NGN 10,670,000
$14,226.7
Survey Line Plan Hydrographic Survey Line
S/No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
200m