0% found this document useful (0 votes)
69 views35 pages

SW WS V6 Part 03 HMI

The document outlines the HMI (Human-Machine Interface) aspects of the Body Shop electric equipment SW-WS V6, detailing visualization conventions, the benefits of using SiVArc for automation planning, and the rules for generating screens. It includes descriptions of various screens such as main, overview, operation modes, and diagnostic screens, along with their functions and necessary adjustments. Additionally, it addresses the multilanguage capabilities and message interfaces for effective communication between PLC and HMI.

Uploaded by

amit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views35 pages

SW WS V6 Part 03 HMI

The document outlines the HMI (Human-Machine Interface) aspects of the Body Shop electric equipment SW-WS V6, detailing visualization conventions, the benefits of using SiVArc for automation planning, and the rules for generating screens. It includes descriptions of various screens such as main, overview, operation modes, and diagnostic screens, along with their functions and necessary adjustments. Additionally, it addresses the multilanguage capabilities and message interfaces for effective communication between PLC and HMI.

Uploaded by

amit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 35

PLC/HMI workshop for body shop electric

equipment - V6
Part 03 – HMI

India 2.5

SK216/6
Body Shop
26.01.2023
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Visualization convence

Meaning

Red Fault

Yellow Warning

Green Home position

Blue Work position

Light blue Manual preselection


SW_WS_V6_Part_03_HMI. pptx

Blinking Request active

Permanent light State activ

2 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

SiVArc Body Shop


26.01.2023

Basics of SiVArc (Siemens Visualisation Architect)


STEP 7
user program
PLC HMI
WinCC Advanced
Calling structure
projekt
Block description

Source data
SW_WS_V6_Part_03_HMI. pptx

Set of rules

3 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

SiVArc Body Shop


26.01.2023

Benefits of SiVArc generator


Objects in visualization automatically gains functional attributes of corresponding element and by
using rules are automatically placed.

▪ Decreasing of difficulty when projecting new production line or changes of actual


projection line
▪ Decreasing time during commisioning
▪ Elements are after programming immediately controlable.
▪ Elimination of faults during connection of visualization to program
▪ Standardized control enviroment for maintenance and adjusters
SW_WS_V6_Part_03_HMI. pptx

4 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

SiVArc Body Shop


26.01.2023

Rules for screens generating


Rules for generating SiVArc are saved in:
▪ Common data/SiVArc (rules for assignment of faceplates and HMI tags to
standart function blocks in V6/project library)
▪ Own faceplates (rules for connecting of HMI-UDT, assignment of events
and external texts)
▪ Templates of screens pfor detailed screens (rules for placement of objects
on the screen)
Actual rules are part of the global/project library (faceplates/copy able objects)

Note
SW_WS_V6_Part_03_HMI. pptx

for functional generating, all rules in the CPU column must be checked
(rules update is necessary to do)

HMI_19Z & HMI_19Z_Global & HMI_19Z_GBA: Generating rules for VASS V6 library
HMI_19Z_SKxxx: Generating rules for project specific library

5 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

SiVArc Body Shop


26.01.2023

Requests of SiVArc Generator


Correctly created symbolic name and symbolic comment of structure FC and instance DB to module FB

example FB125 and faceplate „Status_03“ belonging to FB125


SW_WS_V6_Part_03_HMI. pptx

Attention:
Rules for describtions are in the
attachment C of projecting guideline

6 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Generating process

Start Final PLC Project

1 Generating of visualization I1 (SiVArc)

Making of additional corrections on I1 in WinCC according to projecting


2 guideline

3 Complete compilation of the project


SW_WS_V6_Part_03_HMI. pptx

4 Running simulation HMI I1 and checking of runtime screens

Final project
Finish

7 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Structure of the visualization project


Screens generated by SiVArc are in WinCC RT
Advanced saved in subfolders according to
category
SW_WS_V6_Part_03_HMI. pptx

8 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Template and Template_Temp


Screen „Template“ Screen „Template_Temp“
SW_WS_V6_Part_03_HMI. pptx

Screen "Template" serves as a background screen for complete visualization

Additional corrections:

Cut out the bar for chosing of the station and status of the connection with CPU from the Template_Temp
and put it into the screen Template

9 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Main screen

Through navigation in
main menu on default
screen all other screens
of production line
control are available

Additional changes
SW_WS_V6_Part_03_HMI. pptx

Usually none

10 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Overview screen of production line

Additional changes:
SW_WS_V6_Part_03_HMI. pptx

On overview screen are displayed animations of all Organisation of graphics elements of


emergency stops buttons, safety devices, stations and overview screen to form according to
robots. Through symbols of robots you can be layout of production line. Generated
redirected to appropriate screen. elements are on the screen
„Anlagenübersicht_Temp“

11 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Pre-selections

Screen contains control


elements for choosing
general and specific pre-
selections for safety
circuits. Pre-selections for
safety circuit are
overhanded to appropriate
loading stations

Additional changes:

In case of large
SW_WS_V6_Part_03_HMI. pptx

ammount of elements
make grouping
according to individual
safety circuits.

12 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Operation modes

For each safety circuit


and loading area, its
own control bar for
choosing operational
modes is created.

Additional changes
SW_WS_V6_Part_03_HMI. pptx

Usually none

13 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Screens of manual control


On screens of manual
control are graphically
displayed feedbacks of
all devices movements.
If the device is in
manual mode, it is
possible to control
manually all functional
units of this device.

Additional changes:
SW_WS_V6_Part_03_HMI. pptx

Usually none

14 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Screens of clamps and sensors

2
As a main picture is used photo or
CAD drawing. Part check sensors
and position sensors are animated
and placed according to real
position.

1
2
Dodatečné úpravy:

▪1 Inserting photo/drawing of
SW_WS_V6_Part_03_HMI. pptx

corresponding device/fixture

2 Placing indicating visualization


objects on appropriate places

15 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Overview screen of robots and production fixtures

On overview screen are together


displayed all operational means of
corresponding line. It is possible to
control here central pre-selections,
e.g. Maintenance set.

Additional changes
SW_WS_V6_Part_03_HMI. pptx

If there is generated more screens


because of the number of systém,
Grouping of process devices on
more screens according to each
safety circle.

16 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Detailed screen of robots

On this screen all


control functions and
details of appropriate
production system are
displayed, including
informations about
PLC interface.

Additional changes
SW_WS_V6_Part_03_HMI. pptx

Usually none

17 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Screens of technological units


For technological
units, like Frequency
converters,
meassuring systems,
marking systém,
writing/reading places,
etc. Appropriate
technological screens
are made.

Additional changes
SW_WS_V6_Part_03_HMI. pptx

Usually none

18 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Statistics screen

Screen displays
statistics
informations, like
counting of parts,
tact times, usability,
or availability, which
are gained through
integrated PDE
packet.

Additional changes
SW_WS_V6_Part_03_HMI. pptx

Usually none

19 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Interface screen

Screen of interface
contains interface
signals in scope of
bits,bytes and words to
neighbor PLC.

Additional changes
SW_WS_V6_Part_03_HMI. pptx

Usually none

20 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Screen of operator call

On this screen, operator


can call in case of fault or
missing part for loading.

Additional changes
SW_WS_V6_Part_03_HMI. pptx

Usually none

21 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Diagnostic screen
SW_WS_V6_Part_03_HMI. pptx

Over integrated packet, informations about the state of each


PROFINET participants are available.

22 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Multilanguage Body Shop


26.01.2023

Switchable languages for visualization


FC11 Grundfunktionen Parametrizing of masking FB_Visu

Flags for language switch, logo of the plant and bar in the background:
Statisticaly generated over SiVArc
SW_WS_V6_Part_03_HMI. pptx

23 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Message interface Body Shop


26.01.2023

Message interface on HMI


PLC HMI
System of message control
ProDiag

FB Ventil
Runtime

Module block 1

Message system
FB Motor
Module blok 2
DB DB DB ProDiag DB
Module blok n DB DB
SW_WS_V6_Part_03_HMI. pptx

24 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Message screen

Display reports displays all


pending report. You can
find separate screens for
device messages and
system diagnostics.

Report archive contains all


archived reports.

Additional changes
SW_WS_V6_Part_03_HMI. pptx

Usually none

25 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Other screens
Projecting guideline

Other screens and necessity of


their additional corrections is
described in projecting guideline‘
SW_WS_V6_Part_03_HMI. pptx

26 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization Body Shop


26.01.2023

Navigation structure

Production line
Default screen overview

Operation modes

Pre-selections

Manual Manual Manual


Statistics Robot overview
Control 1 Control 2 Control n

Robot overview Tool 1 Tool 2 Tool n Robot detail

Operation fixtures
overview
SW_WS_V6_Part_03_HMI. pptx

Interface

Technology

Diagnostics Displaying report Report archive

27 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Beacons Body Shop


26.01.2023

Entry information beacon

Perm.
OFF light Blinking

Without function No jamming Possible jamming

Warning
Time of tact OK Exceeded 100%
(3s before 100%)

Working area Entry


permited Entry prohibited Fault
SW_WS_V6_Part_03_HMI. pptx

Protection area
Line OK Entry prohibited Entry permited Line not released

Note
Jamming display can optionally be placed on the employee information beacon

28 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Information indicators Body Shop


26.01.2023

Example of sequene of states of signalization


11 signalization 22 signalization 33 signalization

Releasing of
Work area Entry to working area Protecting device protecting
blocked permitted not released device
->
Back to state
▪ Device working ▪ Device requires ▪ Device requires 1
▪ Protecting device is interaction of interaction of
SW_WS_V6_Part_03_HMI. pptx

active. E.g.: Closed operator operator


protective door ▪ Protecting device is ▪ Protective device is
▪ No interaction from inactive. E.g.: opened inactive. E.g.: Opened
operator is protective door protective door
requuired ▪ loading / unloading ▪ Releasing of
of parts protective device

29 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Type signalization Body Shop


26.01.2023

Type signalization
Extension max Perm. Blinking
OFF
for 5 types Light 1Hz

Type 3 not loaded Type 3 loaded Request for type 3


Typ 3

Typ 2 Type 2 not loaded Type 2 loaded Request for type 2

Typ 1
SW_WS_V6_Part_03_HMI. pptx

Type 1 not loaded Type 1 loaded Request for type 1

Made with white beacons

30 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Type signalization and jamming in loading stations Body Shop


26.01.2023

Types and jamming signalization


Perm. Blinking
OFF
Light 2Hz

Typ 2 not loaded Type 2 loaded Request for type 2

Typ 1 not loaded Type 1 loaded Request for type 1

No function
SW_WS_V6_Part_03_HMI. pptx

No jamming Possible jamming

Extension max
for 4 types

31 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Other signalization Body Shop


26.01.2023

Signalization of decay status of proces device: (spot welding clamps, buckle heads, wire ammount)

Perm. Perm. Perm.


OFF light light light

--- OK Lifetime 90% Lifetime 98%

Visualization: concept of pallet Exchange – during automatic unload of part by robot

Perm. Blinking
OFF light 2Hz
SW_WS_V6_Part_03_HMI. pptx

Pallet Exchange
--- ---
denied

Pallet Exchange
--- ---
allowed

32 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Other signalization Body Shop


26.01.2023

Signalization of pallet exchange system


Blinking Perm.
OFF
2Hz light

--- Loading station


Loading station empty
occupied

--- Protecting device


Protecting device OK
Not released

--- Unloading station Unloading station


Pallet available No pallet
SW_WS_V6_Part_03_HMI. pptx

---
Possible jamming No jamming

33 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Visualization: empty pallet – during automatic unload Body Shop


26.01.2023

Example of sequene of states of during pallet exchange


1 signalization 2 signalization 3 signalization

Pallet Exchange Pallet Exchange Protecting device Releasing of


denied allowed Not released Protecting
device
->
Back to state
▪ Device working ▪ Device requires 1
▪ Device requires
▪ Protecting device is interaction of interaction of
SW_WS_V6_Part_03_HMI. pptx

active. E.g.: Closed operator operator


protective door ▪ Protecting device is ▪ Protective device is
inactive. E.g.: opened inactive. E.g.: Opened
▪ No interaction from protective door protective door
operator is requuired ▪ Pallet exchange ▪ Releasing of
protective device

34 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL
Body Shop electric equipment SW-WS V6 India 2.5

SK216/6

Signalization of protecting circle Body Shop


26.01.2023

Signalization of protecting circle

OFF Blinking Perm. light


No summary
Summary fault ---
fault

Emergency stop Emergency stop


---
OK Pressed

Protective circle Protective circle


---
OK NOT OK
SW_WS_V6_Part_03_HMI. pptx

Automatic
Automatic
--- operation not
operation active
active

Note
Implementing beacon of protecting circle only if no GBA is available!

35 PPF-K/6 – Automation Planning, 01.09.2022


INTERNAL

You might also like