Training Material On API Pumps
Training Material On API Pumps
1
23/12/2020
IPD - PIMPRI
PUMP MODELS TYPE MANUFACTURING STANDARD
RPH ( OH2) SINGLE STAGE OVERHUNG END SUCTION API 610 - 11th Edition
RPHb ( BB2) TWO STAGE BETWEEN BEARING API 610 - 11th Edition
WKTR ( VS6 ) VERTICAL BARREL API 610 - 11th Edition
WKB ( VS1) VERTICAL WITH OUT BARREL (Tank/ Pit Mounted) API 610 - 11th Edition
2
23/12/2020
5 Rohit Deo
3
23/12/2020
Chennai Petroleum
Corporation Ltd.
4
23/12/2020
5
23/12/2020
6
23/12/2020
13
7
23/12/2020
15
16
8
23/12/2020
17
18
9
23/12/2020
Mechanical Seal
19
- Applications served
WKTR/WKB ( VS6/VS1)
Applications Special Requirements
Ammonia, Ethylene,Butene1,LPG etc Low Temperature Application
Condensate extraction from steam turbines, High Temperature Applications
Process liquids for refinery High Temperature Applications
Petrochemical applications High suction pressure
Slops Drain, HC Drain &Amine Drain Tank mounted
10
23/12/2020
21
22
11
23/12/2020
Special Application
WKTR (VS6)
Special Application
WKTR (VS6)
12
23/12/2020
Special Application
WKTR (VS6)
25
Special Application
WKTR (VS6)
26
13
23/12/2020
Special Application
WKB( VS1)
27
Special Application
WKB( VS1)
28
14
23/12/2020
29
WKTR Pumps
30
15
23/12/2020
31
16
23/12/2020
Design Features:
Double Suction impeller minimizes site investments
1. In order to minimize the NPSH value of the pump it is
possible beside the normal hydraulics - to provide
single-suction or double-suction impellers.This reduces
plant construction costs.
34
17
23/12/2020
35
3
6
18
23/12/2020
Finite Element Analysis CAD Model of Barrel Finite Element Meshed Model of Barrel
19
23/12/2020
C-6 Chrome Steel + Chrome Steel D-2 Super Duplex + Super Duplex
40
40 40
20
23/12/2020
- Applications served
CHTR Pumps ( BB5)
Applications Special Requirements
Boiler Feed VFD/VMS/ LOS
Pipe line projects ( LPG/ Crude ) VFD/VMS/ UCD/LCP/LOS
Reactor Feed Pump High speed Pump
Lean Amine NACE Requirement
C2/C3/C4/C5 Liquid Low temperature application
Vacuum Residue High Temperature application
Low flow high head Vane Island impellers
Side suction Special Customer Requirement
41 4
1
42 4
2
21
23/12/2020
44 4
4
22
23/12/2020
Project :IOCL-DHDT
Client :IOCL
Scope :CHTR6/5+1B
Qty:- 2 Nos.
Scope :- Pumps, M. Seals , Plan
52, Lube oil system ,Motor( EX.p)
Driven , FF JB & VMS .
Pump Machine Train is designed
to suit the existing space.(Existing
foundation of CHTR 5 of KSB
India) .
Application :- Hydrocarbon (VGO)
Year of Supply :-2018
Pump Temp Q H
API Pump Qty Driver Power (KW)
Model ( Deg C) (m3/hr) (m)
BB5 CHTR6/5+1B 2 190 420 1335 2100 45
Reference List
• RECENT EXECUTED PROJECT PHOTOS
Reliance Jamnagar 3 Program (CPP’s)
HPCL-Uran-Chakan-shikrapur, LPG Pipeline Project.
CPCL-Residue Upgradation Project
CPCL SRU Punj Lloyd
Sasol Chemicals(USA) LCC.
Bharat Petroleum Corporation Ltd.
Reliance J3 Program Off sites & Utilities
JGC ,HASSI R' MEL Boosting Phase 3 Project, Algeria
IOCL-DHDT-Baroda
46 4
6
23
23/12/2020
Reliance BFP’s
Project : Reliance Jamnagar 3
Program (CPP’s)
Client : Reliance Power &
Utilities Pvt. Ltd.
Scope : CHTR (5/1+8) – 4 Nos.
CHTR (6/1+7) – 1 No.
RPH 100-360 – 2 Nos.
RPH 100-360 – 2 Nos.
(Pump, Motor, Lube Oil
System & Strainer)
Application :- Boiler Feed Water
Year of Supply :- 2015
47
Hindustan Petroleum
Corporation Ltd.
Project : Uran-Chakan-
shikrapur, LPG
Pipeline Project
Client : HPCL
Scope : WKTR – 2 Nos.
CHTR – 2 Nos. Pumps,
Electric Motors, Variable
Frequency drives,
Control panels, Lube oil
systems, Vibration
monitoring, systems,
etc.
Application :- LPG Transfer
Pump
Year of Supply :- 2014
48
24
23/12/2020
Chennai Petroleum
Corporation Ltd.
Project : Residue Upgradation
Project
Client : CPCL
Scope : CHTR – 2 Nos. Pumps,
Electric Motors,
Machine Monitoring
Systems,
Lube oil systems, Gear
Box, etc.
49
Chennai Petroleum
Corporation Ltd.
Project : CPCL SRU Punj Lloyd
Client : Punj Lloyd
Scope : CHTR (3/5) – 2 Nos.
(Pumps, Motor, Lube
Oil systems, Vibration
monitoring systems.
Steam Turbine
50
25
23/12/2020
Sasol Chemicals(USA)
LCC
Project :Lake Charles
Chemicals and Facilities
Client :Sasol Chemicals
Scope :CHTR (4/1+8+1B)- 5 Nos.
(Pumps, Lube Oil systems,
Vibration monitoring systems &
Motor Driven /Steam Turbine)
Performance testing in India
witnessed by Fluor. Unitization in
USA
Application :Boiler Feed Water
Year of Supply :- 2015
51
Bharat Petroleum
Corporation Ltd
Project :
Client :Bharat Petroleum
Corporation Ltd.
Scope :CHTR 2/8- 2 Nos.
(Pumps , M. Seals & Motor
Driven )
Pump supplied in material of
construction in Duplex .
Application :Water
Year of Supply :- 2016
Temp Q H Driver Power
API Pump Pump Qty
( Deg C) (m3/hr) (m) (KW)
BB5 CHTR2/8 2 20 20.2 553 90
52
26
23/12/2020
Reliance Industries
Project :Reliance J3
Program Off sites & Utilities
Client :Reliance Industries
Scope :CHTR 5/1+2- 2 Nos.
(Pumps , M. Seals , Plan 53B &
Motor Driven )
Pump supplied with side
suction.
Application :Orthoxylene
Year of Supply :- 2016
Temp Q H
Pump Type Qty Driver Power (KW)
( Deg C) (m3/hr) (m)
CHTR5/1+2 2 65 343 336.61 450
53
Seal Systems:-Plan53B(with
forced draft/ Natural draft) , Plan
75/72 & 11/62
No of Pumps:- 54Nos
( OH2 :- 33 no's & BB5 :- 21 no's)
Year of Supply: 2018
Material of Construction:-
Pump
Type S5 S6 A8 D1 Total
RPH 6 15 12 33
CHTR 6 6 9 21
54
27
23/12/2020
Project :IOCL-DHDT
Client :IOCL
Scope :CHTR6/5+1B
Qty:- 2 Nos.
Scope :- Pumps,M.
Seals , Plan 52, Lube
oil system ,Motor(
EX.p) Driven , FF JB &
VMS .
Pump Machine Train is
designed to suit the
existing space
(Existing foundation) .
Application:
Hydrocarbon (VGO)
Pump Temp Q H
API Pump
Model
Qty
( Deg C) (m3/hr) (m)
Driver Power (KW) Year of Supply :- 2018
BB5 CHTR6/5+1B 2 190 420 1335 2100 55
1 9972153885 RAS LAFFANS - QATAR CHTR2/8 WASH WATER 12.1 603.1 2013
PROCESS
3 9972454579 SK.Engg.-IRPC UHV Pl CHTR2/6 24.2 367 2014
CONDENSAT
CHARGE
5 9972671853 APS PROJECT P-1464 CHTR 2 /13 21 1161 2015
PUMP
DIESEL HDS
6 9972752830 BITUROX BBU CHTR 2/5 16 335 2015
UNIT
BOILER
7 9972847794 CPC CORPORATION TALIN REFINERY CHTR2/6 WATER 17.7 602.2 2015
PUMPS
BHARAT PETROLEUM CORPORATION
8 9973094893 CHTR2/8 WATER 20.2 553 2016
LTD
28
23/12/2020
Thank You.
29