DPR Unique
DPR Unique
10
5
0
1.00
15.00
12.00
0.50 24.98 7.80
Shyam Steel 5.00 145.37 59.57
Shyam Steel C/ T001000649 24.95 1.00 24.95 45.95
1001/21/000505
1
Shyam Steel C/ T001000651 24.92 24.92 24.92
1001/21/000505
0 C/
1001/21/000504
9
Shyam Steel C/ T001000646 29.97 29.97 29.97
1001/21/000504
8
14.75 21.05
Master Polyheed 4886.7
Orai - 1680.00 503.00
Jhansi - 902.00 289.00
Jhansi - 654.00 100.00
ASHTECH 29.50 119.60 61.08
8242.00 0.00
Make / MTC No. Week no /Batch Today Received Today Consume This month Cumu- Balance Q
Brand/Source no./Challan No. Qty Qty lative Received Qty
0.00
M25
M10
M40
M50 No Concrete due 1674.40
to Non-Availability
of Cement at site
Grade of Concrete Today Qty (in This month Cumulative Qty (In cum) Remark
Cum)
MT
15.00
12.00
24.98 7.80 MT
145.37 59.57 MT
24.95 45.95 MT
24.92 24.92 MT
29.97 29.97 MT
14.75 21.05 MT
4886.76 Ltr
1680.00 503.00 MT
902.00 289.00 MT Other Material
654.00 100.00 MT Total
119.60 61.08 MT
8242.00 0.00 Bags
sume This month Cumu- Balance Qty Unit
lative Received Qty
cum) Remarks
Daily Concrete Production Report
Project Name: Kanpur Dehat Date: 29.11.2021
M50
No Concrete due
M40 to Non-
M10 Availability of 1674.40
Cement at site
M25
Total 0.00
Daily Received Construction Material Report
This month
Material Make Week no /Batch Today Today Consume
MTC No. Cumulative Received Balance Qty Unit
Description/Make /Brand/Source no./Challan No. Received Qty Qty
Qty
Cement 8242 0 Bags
Fly ash ASHTECH 29.5 119.6 61.08 MT
CA 10MM Jhansi - 654 100 MT
CA 20MM Jhansi - 902 289 MT
Fine Aggregate Orai - 1680 503 MT
Admixture Master Polyheed 4886.76 Ltr
Reinforcement 8MM 14.75 21.05 MT
Reinforcement 10MM Shyam Steel C/1001/21/0005048 T001000646 29.97 29.97 29.97 MT
C/1001/21/0005050
Reinforcement 12MM Shyam Steel T001000651 24.92 24.92 24.92 MT
C/1001/21/0005049
Reinforcement 16MM Shyam Steel C/1001/21/0005051 T001000649 24.95 1 24.95 45.95 MT
Reinforcement 20MM Shyam Steel 5 145.37 59.57 MT
Reinforcement 25MM 0.5 24.98 7.8 MT
Reinforcement 32MM 1 15 12 MT
Other Material
Total
Daily Concrete Production Report
Project Name: Kanpur Dehat Date: 01.12.2021