The document contains a series of daily concrete production reports for the Kanpur Dehat project from November 29 to December 6, 2021. It details the quantities of various concrete grades produced, construction materials received, and their consumption rates. The reports indicate a consistent supply of materials and highlight specific issues such as non-availability of cement at certain times.

Uploaded by

Ravi kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views9 pages

DPR Unique

The document contains a series of daily concrete production reports for the Kanpur Dehat project from November 29 to December 6, 2021. It details the quantities of various concrete grades produced, construction materials received, and their consumption rates. The reports indicate a consistent supply of materials and highlight specific issues such as non-availability of cement at certain times.

Uploaded by

Ravi kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

15

10
5
0

1.00

15.00

12.00
0.50 24.98 7.80
Shyam Steel 5.00 145.37 59.57
Shyam Steel C/ T001000649 24.95 1.00 24.95 45.95
1001/21/000505
1
Shyam Steel C/ T001000651 24.92 24.92 24.92
1001/21/000505
0 C/
1001/21/000504
9
Shyam Steel C/ T001000646 29.97 29.97 29.97
1001/21/000504
8
14.75 21.05
Master Polyheed 4886.7
Orai - 1680.00 503.00
Jhansi - 902.00 289.00
Jhansi - 654.00 100.00
ASHTECH 29.50 119.60 61.08
8242.00 0.00
Make / MTC No. Week no /Batch Today Received Today Consume This month Cumu- Balance Q
Brand/Source no./Challan No. Qty Qty lative Received Qty
0.00
M25
M10
M40
M50 No Concrete due 1674.40
to Non-Availability
of Cement at site
Grade of Concrete Today Qty (in This month Cumulative Qty (In cum) Remark
Cum)
MT
15.00

12.00
24.98 7.80 MT
145.37 59.57 MT
24.95 45.95 MT

24.92 24.92 MT

29.97 29.97 MT

14.75 21.05 MT
4886.76 Ltr
1680.00 503.00 MT
902.00 289.00 MT Other Material
654.00 100.00 MT Total
119.60 61.08 MT
8242.00 0.00 Bags
sume This month Cumu- Balance Qty Unit
lative Received Qty

cum) Remarks
Daily Concrete Production Report
Project Name: Kanpur Dehat Date: 29.11.2021

Today Qty (in This month Cumulative Qty (In


Location & structure Details Grade of Concrete Remarks
Cum) cum)

M50
No Concrete due
M40 to Non-
M10 Availability of 1674.40
Cement at site
M25
Total 0.00
Daily Received Construction Material Report
This month
Material Make Week no /Batch Today Today Consume
MTC No. Cumulative Received Balance Qty Unit
Description/Make /Brand/Source no./Challan No. Received Qty Qty
Qty
Cement 8242 0 Bags
Fly ash ASHTECH 29.5 119.6 61.08 MT
CA 10MM Jhansi - 654 100 MT
CA 20MM Jhansi - 902 289 MT
Fine Aggregate Orai - 1680 503 MT
Admixture Master Polyheed 4886.76 Ltr
Reinforcement 8MM 14.75 21.05 MT
Reinforcement 10MM Shyam Steel C/1001/21/0005048 T001000646 29.97 29.97 29.97 MT
C/1001/21/0005050
Reinforcement 12MM Shyam Steel T001000651 24.92 24.92 24.92 MT
C/1001/21/0005049
Reinforcement 16MM Shyam Steel C/1001/21/0005051 T001000649 24.95 1 24.95 45.95 MT
Reinforcement 20MM Shyam Steel 5 145.37 59.57 MT
Reinforcement 25MM 0.5 24.98 7.8 MT
Reinforcement 32MM 1 15 12 MT
Other Material
Total
Daily Concrete Production Report
Project Name: Kanpur Dehat Date: 01.12.2021

Today Qty (in This month Cumulative Qty (In


Location & structure Details Grade of Concrete Remarks
Cum) cum)

Academic Building Pedestal M30 52.2


T-3 Block Footings M25 16.0
Boys Hostel Column M40 1.0
Girls Hostel Column M40 0.3 77.75
Boundery Wall M25 6.3
T-5 Block Column GF M40 2.0
Total 77.75
Daily Received Construction Material Report
This month
Material Make Week no /Batch Today Today Consume
MTC No. Cumulative Balance Qty Unit
Description/Make /Brand/Source no./Challan No. Received Qty Qty
Received Qty
Cement Ultratech-OPC-43 Week-48 2820 475 2820 2345 Bags
Fly ash ASHTECH 7.78 45.76 MT
CA 10MM Jhansi - 33.67 125 MT
CA 20MM Jhansi - 50.69 238 MT
Fine Aggregate Orai - 98 62.98 98 538 MT
Admixture Master Polyheed 295.45 4591.31 Ltr
Reinforcement 8MM 0.5 20.55 MT
Reinforcement 10MM 1.5 28.47 MT
Reinforcement 12MM 1 23.92 MT
Reinforcement 16MM 0.5 44.95 MT
Reinforcement 20MM 5 50.57 MT
Reinforcement 25MM 1 6.8 MT
Reinforcement 32MM 11.5 MT
Other Material
Total
Daily Concrete Production Report
Project Name: Kanpur Dehat Date: 03.12.2021

Today Qty (in This month Cumulative Qty (In


Location & structure Details Grade of Concrete Remarks
Cum) cum)

Academic Building Raft M30 204.0


Academic Building Column M50 1.5
Academic Building Column M40 1.5
T-3 Block Footings M25 9.5
427.40
T-3 Block PCC M10 8.0
T-5 Block M40 5.5
Intrens Hostel M10 3.0
Total 233.00
Daily Received Construction Material Report
This month
Material Make Week no /Batch Today Today Consume
MTC No. Cumulative Balance Qty Unit
Description/Make /Brand/Source no./Challan No. Received Qty Qty
Received Qty
Cement Ultratech-OPC-43 Week-48 2100 1425 6300 4875 Bags
Fly ash ASHTECH 23.30 18.35 MT
CA 10MM Jhansi - 100.89 135 MT
CA 20MM Jhansi - 151.92 35 186 MT
Fine Aggregate Orai - 70 188.73 343 563 MT
Admixture Master Polyheed 4591.31 Ltr
Reinforcement 8MM Shyam Steel A/1001/21/0005185 B012007803 16.99 1 16.99 36.04 MT
Reinforcement 10MM 1.5 9.98 36.45 MT
Reinforcement 12MM 0.5 11 32.92 MT
Reinforcement 16MM Shyam Steel A/1001/21/0004797 A012020293 15 1 26 68.95 MT
Reinforcement 20MM 4 45.57 MT
Reinforcement 25MM 1 11 MT
Reinforcement 32MM 11.5 MT
Other Material
Total
Daily Concrete Production Report
Project Name: Kanpur Dehat Date: 04.12.2021

Today Qty (in This month Cumulative Qty (In


Location & Structure Details Grade of Concrete Remarks
Cum) cum)

Academic Building Raft M30 135.0


Academic Building Column M50 1.0
Academic Building Column M40 1.5
Girls Hostel M25 10.5
T-3 Block PCC M10 3.5 585.90
Boundery Wall M25 5.0
T-5 Block Column M35 1.0
T-5 Block Column M50 1.0
Total 158.50
Daily Received Construction Material Report
This month
Material Make Week no /Batch Today Today Consume
MTC No. Cumulative Balance Qty Unit
Description/Make /Brand/Source no./Challan No. Received Qty Qty
Received Qty
Cement Ultratech-OPC-43 Week-48 2400 974 8700 6301 Bags
Fly ash ASHTECH 15.85 2.50 MT
CA 10MM Jhansi - 36 68.63 36 102 MT
CA 20MM Jhansi - 71 103.34 106 154 MT
Fine Aggregate Orai - 78 128.39 421 574 MT
Admixture Master Polyheed 4591.50 Ltr
Reinforcement 8MM 0.5 16.99 35.54 MT
Reinforcement 10MM 1 9.98 35.45 MT
Reinforcement 12MM 1 11 31.92 MT
Reinforcement 16MM Shyam Steel A/1001/21/0004798 A012020282 31.85 2 57.85 98.8 MT
Reinforcement 20MM 5 40.57 MT
Reinforcement 25MM 1.5 9.5 MT
Reinforcement 32MM 1 3 MT
Other Material
Total
Daily Concrete Production Report
Project Name: Kanpur Dehat Date: 05.12.2021

Today Qty (in This month Cumulative Qty (In


Location & Structure Details Grade of Concrete Remarks
Cum) cum)

Academic Building Column M50 1.7


Academic Building Column M40 1.0
Boys Hostel Column M40 1.0
595.10
T-3 Block Footings M25 3.0
T-5 Block PB M25 2.5
Total 9.20
Daily Received Construction Material Report
This month
Material Make Week no /Batch Today Today Consume
MTC No. Cumulative Balance Qty Unit
Description/Make /Brand/Source no./Challan No. Received Qty Qty
Received Qty
Cement Ultratech-OPC-43 Week-48 1500 72 10200 7729 Bags
Fly ash ASHTECH 27.5 0.92 27.5 29.08 MT
CA 10MM Jhansi - 34 3.98 36 132 MT
CA 20MM Jhansi - 69 6.00 106 217 MT
Fine Aggregate Orai - 38 7.45 421 605 MT
Admixture Master Polyheed 4591.50 Ltr
Reinforcement 8MM 16.99 35.54 MT
Reinforcement 10MM 9.98 35.45 MT
Reinforcement 12MM 1 11 31.92 MT
Reinforcement 16MM 2 57.85 98.8 MT
Reinforcement 20MM 3 37.57 MT
Reinforcement 25MM 1 8.5 MT
Reinforcement 32MM 0.5 2.5 MT
Other Material
Total
Daily Concrete Production Report
Project Name: Kanpur Dehat Date: 06.12.2021

Today Qty (in This month Cumulative Qty (In


Location & Structure Details Grade of Concrete Remarks
Cum) cum)

Academic Building Column M50 1.5


Girls Hostel Column M50 1.0
Girls Hostel Footings M25 19.0
Boys Hostel Column M50 1.5
T-3 Block Footings PCC M10 4.5 623.40
T-5 Block PB PCC M10 3.0
Intrens Hostel M10 4.0
T-5 Block PB M25 3.0
Total 37.50
Daily Received Construction Material Report
This month
Material Make Week no /Batch Today Today Consume
MTC No. Cumulative Balance Qty Unit
Description/Make /Brand/Source no./Challan No. Received Qty Qty
Received Qty
Cement Ultratech-OPC-43 198 10200 7531 Bags
Fly ash ASHTECH 2.81 27.5 26.27 MT
CA 10MM Jhansi - 72 16.24 108 188 MT
CA 20MM Jhansi - 148 24.45 254 341 MT
Fine Aggregate Orai - 70 30.38 491 644 MT
Admixture Master Polyheed 4591.50 Ltr
Reinforcement 8MM 16.99 35.54 MT
Reinforcement 10MM 9.98 35.45 MT
Reinforcement 12MM 1.5 11 30.42 MT
Reinforcement 16MM 1.5 57.85 97.3 MT
Reinforcement 20MM 5 32.57 MT
Reinforcement 25MM 1 7.5 MT
Reinforcement 32MM 1 1.5 MT
Other Material
Total
Daily Concrete Production Report
Project Name: Kanpur Dehat Date: 07.12.2021

Today Qty (in This month Cumulative Qty (In


Location & Structure Details Grade of Concrete Remarks
Cum) cum)

Academic Building Column M50 4.5


Girls Hostel Column M40 0.6
Boys Hostel Column M50 2.5
Boys Hostel Pedestal M25 14.5
T-3 Block Footings M25 4.0
T-4 Block Lift Wall M25 4.5
673.00
T-5 Block PB PCC M25 2.5
Intrens Hostel M10 4.0
Boundery Wall M25 6.0
Labour Colony M10 3.5
Boundery Wall PCC M10 3.0
Total 49.60
Daily Received Construction Material Report
This month
Material Make Week no /Batch Today Today Consume
MTC No. Cumulative Balance Qty Unit
Description/Make /Brand/Source no./Challan No. Received Qty Qty
Received Qty
Cement Ultratech-OPC-43 280 10200 6570 Bags
Fly ash ASHTECH 56 4.96 83.5 77.27 MT
CA 10MM Jhansi - 64 21.48 172 230 MT
CA 20MM Jhansi - 105 32.34 359 413 MT
Fine Aggregate Orai - 40.18 491 454 MT
Admixture Master Polyheed 188.48 4591.50 Ltr
Reinforcement 8MM 16.99 35.54 MT
Reinforcement 10MM 9.98 35.45 MT
Reinforcement 12MM 1 11 29.42 MT
Reinforcement 16MM 0.5 57.85 96.8 MT
Reinforcement 20MM 6 26.57 MT
Reinforcement 25MM 1.5 6 MT
Reinforcement 32MM 1.5 Nil MT
Other Material
Total