SPELInstall Checklist
SPELInstall Checklist
Note: To run Smart Electrical you must connect to a site and plant that were created using Smart Engineering Manager. A plant created in Smart Engineering Manager with the Smart Electrical application associated is a prerequisite for being able to use Smart Electrical.
Task No. Tool Task Step / Software Version Comments Additional Resources Notes
Microsoft .Net Framework 4.6.2 is required for launching the setup.exe file for
Smart Electrical and for connectivity when installing Oracle Client. It must be
Loading Smart Electrical Prerequisite
6.2 .NET Framework Microsoft .NET Framework 4.6.2 installed before installing Oracle Client.
Software
Microsoft .Net Framework 4.6.2 is required for working with SmartPlant Electrical.
1
Intergraph Smart® Electrical
Installation & Configuration Checklist
Software Version: 2018 (08.00.00)
(Intergraph Smart® Engineering Manager 2018)
Installation of this version is from a DVD or a set of files downloaded from Intergraph's eCustomer web site.
Unless otherwise specified, the topics listed in the Additional Resources column can be found in the Smart® Electrical Installation Guide .
The checklist below applies to the standalone installation of Smart Electrical. For guidelines about using Smart Electrical in an integrated environment, see the SmartPlant Foundation Installation and Configuration Checklist.
Note: To run Smart Electrical you must connect to a site and plant that were created using Smart Engineering Manager. A plant created in Smart Engineering Manager with the Smart Electrical application associated is a prerequisite for being able to use Smart Electrical.
Task No. Tool Task Step / Software Version Comments Additional Resources Notes
The client database software must
Set Up the Database Server be of the same version as the
server database software.
Smart Electrical Installation Install Prerequisite Software on the Smart Electrical Loading Smart Electrical Prerequisite
8.0
DVD Workstation Software
Hardware and Software Recommendations
Required for viewing the Readme file and the online documentation delivered
8.1 Internet Explorer Microsoft Edge Browser > Smart Electrical Workstation > Software
with the software
Prerequisites
Microsoft XML Hardware and Software Recommendations
8.2 Core Services MSXML 6.0 Service Pack 1 or 6.0 Service Pack 3 > Smart Electrical Workstation > Software
(MSXML) Prerequisites
9.0 Optional Software
Refer to SPEMInstall_Checklist.xlsx
See the Smart Engineering Manager
9.1 Smart Engineering Manager Smart Engineering Manager 2018 Used for new site and plant creation, upgrade and other administrative functions delivered with Smart Engineering
Installation and Upgrade Guide
Manager
Hardware and Software Recommendations
9.2 PDF Reader Required for reading the print documentation delivered with the software > Smart Electrical Workstation > Software
Prerequisites
Hardware and Software Recommendations
*Microsoft Office 2013 (32-bit only) Microsoft Excel is required for working with report templates and generating
9.3 Microsoft Office > Smart Electrical Workstation > Software
*Microsoft Office 2016 (32-bit only) reports.
Prerequisites
Hardware and Software Recommendations
9.4 Citrix Citrix XenApp 7.6 (On Windows Server 2016) Needed for working in a thin-client environment > Smart Electrical Workstation > Optional
Software
9.5 SmartSketch SmartSketch 2016
Hardware and Software Recommendations
9.6 AutoCAD Autodesk AutoCAD 2013 Used for viewing files generated using the 'Save As' feature > Smart Electrical Workstation > Optional
Software
Hardware and Software Recommendations
9.7 MicroStation Bentley MicroStation 8 > Smart Electrical Workstation > Optional
Software
2
Intergraph Smart® Electrical
Installation & Configuration Checklist
Software Version: 2018 (08.00.00)
(Intergraph Smart® Engineering Manager 2018)
Installation of this version is from a DVD or a set of files downloaded from Intergraph's eCustomer web site.
Unless otherwise specified, the topics listed in the Additional Resources column can be found in the Smart® Electrical Installation Guide .
The checklist below applies to the standalone installation of Smart Electrical. For guidelines about using Smart Electrical in an integrated environment, see the SmartPlant Foundation Installation and Configuration Checklist.
Note: To run Smart Electrical you must connect to a site and plant that were created using Smart Engineering Manager. A plant created in Smart Engineering Manager with the Smart Electrical application associated is a prerequisite for being able to use Smart Electrical.
Task No. Tool Task Step / Software Version Comments Additional Resources Notes
9.8
Integrated Development
Visual Studio 2012 or 2013
Set Up the Database Server
Used for API
Hardware and Software Recommendations
> Smart Electrical Workstation > Optional
Environment (IDE)
Software
Hardware and Software
Recommendations > Smart Electrical
Workstation > Software Prerequisites
SmartPlant License Manager
10.0 Install SmartPlant License Manager
12.00.83.00 Installing the Software > Install
SmartPlant Electrical