SPELInstall Checklist
SPELInstall Checklist
1
Intergraph Smart® Electrical
Installation & Configuration Checklist
Software Version: 2018 (08.00.00)
(Intergraph Smart® Engineering Manager 2018)
Installation of this version is from a DVD or a set of files downloaded from Intergraph's eCustomer web site.
Unless otherwise specified, the topics listed in the Additional Resources column can be found in the Smart® Electrical Installation Guide.
The checklist below applies to the standalone installation of Smart Electrical. For guidelines about using Smart Electrical in an integrated environment, see the SmartPlant Foundation Installation and Configuration Checklist.
Note: To run Smart Electrical you must connect to a site and plant that were created using Smart Engineering Manager. A plant created in Smart Engineering Manager with the Smart Electrical application associated is a prerequisite for being
able to use Smart Electrical.
Task No. Tool Task Step / Software Version Comments Additional Resources Notes
Smart Electrical Install Prerequisite Software on the Smart Loading Smart Electrical
8.0
Installation DVD Electrical Workstation Prerequisite Software
Hardware and Software
Required for viewing the Readme file and the online documentation
8.1 Internet Explorer Microsoft Edge Browser Recommendations > Smart Electrical
delivered with the software
Workstation > Software Prerequisites
2
Intergraph Smart® Electrical
Installation & Configuration Checklist
Software Version: 2018 (08.00.00)
(Intergraph Smart® Engineering Manager 2018)
Installation of this version is from a DVD or a set of files downloaded from Intergraph's eCustomer web site.
Unless otherwise specified, the topics listed in the Additional Resources column can be found in the Smart® Electrical Installation Guide.
The checklist below applies to the standalone installation of Smart Electrical. For guidelines about using Smart Electrical in an integrated environment, see the SmartPlant Foundation Installation and Configuration Checklist.
Note: To run Smart Electrical you must connect to a site and plant that were created using Smart Engineering Manager. A plant created in Smart Engineering Manager with the Smart Electrical application associated is a prerequisite for being
able to use Smart Electrical.
Task No. Tool Task Step / Software Version Comments Additional Resources Notes