3.ELECT. - Method Statement
3.ELECT. - Method Statement
ELECT. WORK
Company Doc. No. Contractor Ref. No. Date Revision
HSE DOCS-MST-ELECT -01 HSE-DOCS-264R15 07.02.2024 00
REVISION
ISSUE DATE DESCRIPTION REVIEW / STATUS
HISTORY
00 07.02.2024 ELECT. WORK
1. Purpose
The purpose of this Method Statement is to describe the details used and controls to
be carried out for the installation of PVC Conduits, GI Back Boxes and Accessories to
ensure that it complies to Project requirements, specifications and standards.
2. Scope
This Method Statement is applicable to all PVC conduits, GI back Boxes and accessories
at (JITHER) electrical works in slab, screed, wall and ceiling serving Lighting, Small
Power, Fire Alarm, Low Current, Intercom and Lightning Protection.
3. Definition
Abbreviation:
PVC - polyvinyl chloride
GI - Galvanized Iron
QAQC - Quality Assurance Quality Control
RFIA - Request for Inspection – Test
ITP - Inspection and Test Plan
TBT - Tool Box Talk
MSDS - Material Safety Data Sheet
A. Approved
Approved means approved in writing by the applicable Engineers Assistant acting
within the scope of their delegate authority.
B. Shop Drawings
means drawings produced where the contract designs drawings require
expressing in more basic form to facilitate construction.
C. Final Inspection
means the inspection of the records of works at completion or at completion
of pre-determined elements to ensure that all previous inspections and tests
have been satisfactorily carried out and properly recorded.
D. Materials
means all items covering the materials or equipments delivered to site that
must be incorporated in the project.
E. Method Statements
Method Statements (MOS) means a technical document to be read in
conjunction with the drawings, specification, standards and codes of practice,
technical data sheets, schedules, work instructions and any other technical
document related to a particular work.
4. Reference Documents – Specifications, Drawings. Etc.
• Project Quality Plan
• Project Specification
checklist and approved Inspection and Test Plans (ITP) which shall also be
attached to the RFIA.
• After the Site Engineer completed their inspection, RFIA shall be submitted to
QAQC Department who shall process the documents to have completed work
inspected by Supervision Consultant for their approval
8. Tools and Equipments
Tools
• Pipe Cutter
• Pipe Reamer
• Hickey Bender / Bending spring
• Electric drill with wits
• Jigsaw
• Hacksaw
• Open and box type spanners
• Chalk line / marking pen
• Measuring Tape
• Ball Hammer and cold chisel
• Screw Driver set
• Level Bar
9. Manpower
Staff:
• Project Manager
• Site Engineer
• Supervisor
Labor
• Foreman
• Trade workers
• Helpers / Labours
• Drivers
10. Health, Safety and Environment
Safety of all workers and equipment is the highest priority of organization during the
execution of the Works.
Personnel Protective Equipment
• Safety Helmet
• Safety Glasses (during drilling and use of grinders)
• Face shield (during grinding)