0% found this document useful (0 votes)
2 views

Control Plan Example

The document outlines a control plan for the can making process, detailing various characteristics such as weight, diameter, and height with their respective performance indices and controls in place. It specifies the process steps, methods of control, and corrective actions required for maintaining quality. Additionally, it emphasizes the importance of inspections, audits, and training for continuous improvement.

Uploaded by

Zafar Iqbal
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Control Plan Example

The document outlines a control plan for the can making process, detailing various characteristics such as weight, diameter, and height with their respective performance indices and controls in place. It specifies the process steps, methods of control, and corrective actions required for maintaining quality. Additionally, it emphasizes the importance of inspections, audits, and training for continuous improvement.

Uploaded by

Zafar Iqbal
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Control Plan

Document #: Issue date: Approved by: Revision #: Revision date:

Process: Can making Process owner: J. K. Project ID: P1918 Project title:

Characteristic VOC Performance Indices Controls in Place Reaction Plan


Process Step
Variable name Input/output? LSL USL Target MSA Stability Capability Method Description Who? Corrective action

1 Cuppimng Weight Output 10.1 10.4 10.25 5% Stable 1.34 SPC charts 20 products / hour QC 50 products / hour Input

2 Operators Notify Maintenance Output

3 Forming Diameter Output 22.5 22.6 22.55 5% Stable 1.21 SPC charts 20 products / hour QC 50 products / hour

4 Operators Notify Maintenance SPC charts

5 " Shape Output - - - - - - Inspection Visual inspection QC Visual inspect all products Visual cont
Conduct periodic audits to
6 Supervisors verify staff trained in visual Audits
inspection
Mistake proofing in
7 Trimming Height Output 40.28 40.66 40.47 - - - Poka Yoke place
Not required Poka Yoke

8 Inspection

9 Sampling

10 SOP

11 5S

12 Prevetive M

13 Training pla

14 Process red

15 Other

Continuous Improvement Toolkit . www.citoolkit.com

You might also like