SF ABI INJECTOR COVER # catching was observed in mold. # mold polishing done on lock area. Training to be provided to
# Lock damge problem # polish was not proper. operator about running of mold
Jan-25 935 1.3 # due to mold butting problem for action to be taken due to - DEV SINGH 21-Jan-25 C
material was stuck on mold resulting catching problem
lock damage
SF TUBE GUIDE (7637AS- # excess finishing generated in mold # emery paper 250 no. was used in daily checking to be done for
Jan-25 809 030A0Y) 1.4 during continue mold running cavity to rough the smooth surface surface finishing by the toolroom - Dev Singh 28-Jan-25 C
Part catching in both cavity person.
SF MOTOR HOUSING # the calender depth was more than # both side packing added 1mm in calender insert proper length to
(P9201350LH) actual length of calender insert in mold. be checked
Jan-25 803 free flowing movement of date 1.5 mold - Dev Singh 20-Jan-25 C
calender insert in mold
SF CAP GRIP END_(8855L-016) # Dent mark in mold # polishing done in mold but part # etching to be done in mold
706 (UML-S-158) condition not improved waiting for customer approval Pending for
Jan-25 1.6 - Dev Singh O
dent mark in mold decision
SF HOSE CLAMP_303576 # Ejector pin seize in mold # lapping done on ejector pin hole acrylic sheet to be introduced
ejector plate not working # dust was obseved on ejector pins old ejector pin was removed from over the ejector pin area to avoid
the mold & new pin was developed, the dust issue in the mold
Jan-25 697 1.7 - Dev Singh 7-Jan-25 C
assembled in mold.