0% found this document useful (0 votes)
3 views4 pages

Traverse Computation Form

The document is a traverse computation sheet from The Hong Kong Polytechnic University, detailing measurements and calculations related to land surveying. It includes data on bearings, distances, adjustments, and final coordinates for various stations. The document also provides information on linear misclosure and accuracy of the measurements.

Uploaded by

martin.wong320
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views4 pages

Traverse Computation Form

The document is a traverse computation sheet from The Hong Kong Polytechnic University, detailing measurements and calculations related to land surveying. It includes data on bearings, distances, adjustments, and final coordinates for various stations. The document also provides information on linear misclosure and accuracy of the measurements.

Uploaded by

martin.wong320
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

The Hong Kong Polytechnic University

Department of Land Surveying and Geo-Informatics


Traverse Computation Sheet

Bkr : Date : Computed by : _______________


Obs : Locality: Instrument : _______________

Station Bearing Distance dN(m) Adj. dE(m) Adj. Final Co-ordinates


From To N(m)
818647.537
612 stn1 357.9383 52.45 52.4160473002681 0.011314 -1.88692485702507 0.160948 818699.964716977
stn1 stn2 165.55375 24.221 -23.455182830435 0.005225 6.0424530938079 0.074324 818676.514758789
stn2 602 221.55375 31.943 -23.9040258661942 0.00689 -21.1885062330575 0.09802 818652.617623257
sum of dn 5.05683860363889 -17.0329779962747

108.614 provis 818652.594194441


818652.571

0.023428816
linear misclosure 0.33411483422912

A B C accuracy 0.00307616729177749
0.0002

869563651.xlsx 04/04/2025 09:20:13


Course :
Group :

al Co-ordinates Station Remark


E(m)
836535.708 612
836533.981552963 stn1
836540.098330498 stn2
836519.007844396 602 836518.5

836518.674552013
836518.341259629

0.333292384

869563651.xlsx 04/04/2025 09:20:13


Sheet2

The Hong Kong Polytechnic University


Department of Land Surveying and Geo-Informatics

Traverse Computation Sheet

Bkr : Date : Computed by : _______________


Obs : Locality: Instrument : _______________

Station Bearing Distance dN(m) Adj. dE(m) Adj.


From To

612 stn1 358.9373 52.314 52.305 0.008246 -0.970244 0.032493


stn1 stn2 166.5269 23.721 -23.06818 0.003739 5.526728 0.014733
stn2 602 222.10169 32.598 -24.18628 0.005139 -21.85528 0.020247
sum of dn 5.050534 -17.2988

108.633 provis

linear misclosure

A B C accuracy

Page 3
Sheet2

ong Kong Polytechnic University


of Land Surveying and Geo-Informatics

Traverse Computation Sheet

Computed by : _______________ Course :


Instrument : _______________ Group :

Final Co-ordinates Station Remark


N(m) E(m)
818647.537 836535.708 612
818699.850604102 836534.769778743 stn1
818676.786159113 836540.311239920 stn2
818652.605013784 836518.476206673 602

818652.587889704 836518.408733151
818652.571 836518.341259629

0.017124079 0.067473522
0.0696125725415316

0.000640805027399884
0.0002

Page 4

You might also like